• Title/Summary/Keyword: Management Method in the Effective Construction Process

Search Result 109, Processing Time 0.02 seconds

Data Model for Document Exchange of Construction Projects (건설 프로젝트 문서교환을 위한 데이터모델)

  • An Sun-Ju;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.569-572
    • /
    • 2003
  • A construction process involves many designers, engineers, contractors, consulting engineers and government officials. Thus, it is essential to promote collaboration among such participants through of effective document exchange. There have been efforts to Improve efficiency of document exchange through Web. Also XML/EDI is recommended by its method. So the purpose of the research was to establish the data model for document information management in document exchange for construction participants using web-based XML/EDI. This research proposed a method of modeling document information for systemic management of document information that exchanged by XML/EDI in central and explained concept of application document information that stored in database. This research classified construction document according to its information relation.

  • PDF

Establishment of Analysis Process and Risk Management Model of Planning Phase in Private Development Project (민간 개발 프로젝트 기획단계의 분석절차 및 리스크 관리 모델 구축)

  • Heo Yeol;Kim Soo-Yong;Yang Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.408-413
    • /
    • 2004
  • Early planning phase of private development project is an important part in mercy of failure and success of all project. Hut reliability of analysis result existing planning phase in not high to the importance. So we analyzed a basic problem point through case study and research data analysis of planning phase in private development project. After this, there is a cause in no establishment of systemic model about work processing and method of planning phase. We would like to suggest the solution through establishment of planning phase analysis processing and risk management model. We think that suggested analysis method increase the credibility of analysis result. With this, we anticipate we suggest the guideline in project process phase and that assist the effective accomplishment of project.

  • PDF

A Suggestion of a Target Costing Concept for Optimal Building Design (적정 건물 설계를 위한 Target Costing 개념 제안)

  • Ahn, Joon-Suk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.137-143
    • /
    • 2010
  • Target Costing is a modern cost management technique used in changeable market conditions. The target cost is set by subtracting the sum of production costs and profits from the market price. The purpose of this present study is to review Target Costing as a useful concept which integrates the project development process with cost management. "Minimum Waste, Maximum Value" could be achieved by setting up guidelines for optimal building design at the beginning of the project development phase. This effective budget management method will help rectify Korea's overspending problems in the area of government building construction projects.

The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique (자산관리 기법을 적용한 주차장 리모델링 대안평가 기법 개발)

  • Yu, Yongsin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.52-62
    • /
    • 2017
  • The purpose of this study is to develope an assessment method for parking lot remodeling alternative by adopting the asset management technique. In order to identify the Level of Service(LOS) and the Evaluation Measurement(EM), literatures was implemented which documented the consideration of parking lot plan, needs of the apartments' tenant, and various design standards. In addition, the authors conducted a three-time delphi survey for the identified 5 LOS and 19 EM to evaluate suitability and necessity of them and to collect additional opinion of experts. The LOS of parking lot were categorized into 5 areas such as Environmental effect and Convenience, Accessibility and so on. The 19 EM were determined to estimate the LOS quantitatively. The researchers analyzed the degree of importance of LOS and EM by using the Analytic Hierarchy Process (AHP) method. But construction cost was excepted from the analysis, because it is used as an independent variable in alternative assessment. In conclusion, the authors proposed the estimation criteria for EM, and the method and process for alternative assessment be performed to benefit-cost analysis using the LOS variation and construction cost. The assessment method for parking lot remodeling alternative was demonstrated effective to assess the parking lot remodeling alternative by case-study. This study has a academic significance by adopting the asset management techniques in the area of the parking lot remodeling. And the assessment method is expected to help deciding a reasonable remodeling alternative of parking lot, as it ensures the diversity for remodeling of the parking lot and reflects the needs of the occupant.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

A Study on the Improvement of Processes of Verification for Construction Firm's Records of Performance (건설공사 실적증명 프로세스 개선에 관한 연구)

  • Lee Hong-Jae;Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.369-372
    • /
    • 2001
  • The processes for verification of performance records in construction have many problems according to construction firm's participating in some of the processes. This study analyzed about current processes and provided improved processes with IDEF method. As the result of this study, it was found that 'As-Is' model has many repetition of activities and 'To-Be' model has three times more effective than 'As-Is' model has. The data modeling which is available for 'To-Be' model was also suggested.

  • PDF

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Field Application of Insulation Curing Method with Double Bubble Sheets Subject to Cold Weather (이중버블시트를 이용한 단열양생공법의 한중콘크리트 현장적용)

  • Hong, Seak-Min;Baek, Dae-Hyun;Kim, Jong;Jeon, Chung-Kun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.57-60
    • /
    • 2008
  • This study investigated the results of insulation heat curing method using double layer bubble sheet in slab concrete and mass concrete in cold weather environment. First of all, when double bubble sheets are applied, it was shown that slab concrete was protected from early freezing by remaining between 6 and 15℃ even in case outside temperature drops -9℃ below zero until the 2nd day from piling, and in the case of mass concrete, with the maximum temperature difference between the center and surface less than 4℃, crack occurrence index was close to 2 and no hydration heat crack occurred by internal constraint. The insulation heat preservation curing method using the double bubble sheet applied in this field prevented early freezing owing to stable curing temperature management, deterring concrete strength development delay at low temperature, and obtained the needed strength. Also, it was proven that the method is highly effective and economic for cold weather concrete quality maintenance through curing cost reduction like construction period shortening and labor cost reduction, etc by reducing the process of temporary equipment installation and disassembling.

  • PDF

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

A Study on the Practical Use of Construction Technical Information System through the application of the DMAIC Method (DMAIC방법론을 활용한 건설기술정보시스템 활용도 제고방안에 관한 연구)

  • Kwon, O-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.91-99
    • /
    • 2010
  • The purpose of this study was to present the 6 sigma technique in construction projects, and to review the possibility of 6 sigma introduction. DMAIC (Design, Measure, Analyze, Improve, Control) methodology was used to increase the utilization of TIMS (Technology Information Management System). The results of this study were as follows. The introduction of the 6 sigma technique was very effective in the construction industry, but there were many difficulties in its application because of the characteristics of construction. As the 6 sigma technique emphasizes management based on data, it is essential to accumulate historical data and to achieve the standardization of the construction business process. Furthermore, it is necessary to apply 6 sigma for the competitiveness of the construction industry, and the development of suitable 6 sigma methodology for the construction industry is required.