Browse > Article
http://dx.doi.org/10.6106/KJCEM.2017.18.3.052

The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique  

Yu, Yongsin (Department of Architecture Engineering, Graduate school, Incheon National University)
Lee, Chansik (College of Urban Architecture Engineering, Incheon National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.18, no.3, 2017 , pp. 52-62 More about this Journal
Abstract
The purpose of this study is to develope an assessment method for parking lot remodeling alternative by adopting the asset management technique. In order to identify the Level of Service(LOS) and the Evaluation Measurement(EM), literatures was implemented which documented the consideration of parking lot plan, needs of the apartments' tenant, and various design standards. In addition, the authors conducted a three-time delphi survey for the identified 5 LOS and 19 EM to evaluate suitability and necessity of them and to collect additional opinion of experts. The LOS of parking lot were categorized into 5 areas such as Environmental effect and Convenience, Accessibility and so on. The 19 EM were determined to estimate the LOS quantitatively. The researchers analyzed the degree of importance of LOS and EM by using the Analytic Hierarchy Process (AHP) method. But construction cost was excepted from the analysis, because it is used as an independent variable in alternative assessment. In conclusion, the authors proposed the estimation criteria for EM, and the method and process for alternative assessment be performed to benefit-cost analysis using the LOS variation and construction cost. The assessment method for parking lot remodeling alternative was demonstrated effective to assess the parking lot remodeling alternative by case-study. This study has a academic significance by adopting the asset management techniques in the area of the parking lot remodeling. And the assessment method is expected to help deciding a reasonable remodeling alternative of parking lot, as it ensures the diversity for remodeling of the parking lot and reflects the needs of the occupant.
Keywords
Parking Lot; Remodeling; Asset Management; Level of Service;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Kim, I., Kim, H. and Lee, S. (2009). "Study on the Factors and Elements Effecting Parking Area Expansion Plans in Apartment Complexes Remodeling" Journal of Architectural Institute of Korea, 25(6), pp. 51-58.
2 Kim, I., Kim, H. and Yoon, S. (2007). "Development of the Design Technique to Expand Parking Area of Aged Apartment House" Journal of Architectural Institute of Korea, 23(6), pp. 71-78.
3 Lee, K. (2008). "Study on designers' perception of the parking lot types in apartment housing complexes" Thesis, Yonsei University.
4 Noh, H., Rho, S., and Kim, T. (1996). "A Study on Comprehensive Assessment Model of Government-Supported Research Institutes: Assessment Index Development and Weights Decision" Journal of The Korean Association for Policy Studies, 5(1), pp. 30-54.
5 Park, J., Park, S., Lee, S. and Tae. C. (2014). "A Study on the Improvement of Scoring System of Energy Performance in G-SEED through Analysis of EPI Scores and Delphi Survey Method" Journal of Architectural Institute of Korea, 30(8), pp. 227-234.   DOI
6 Park, S., Jung, S., Lee, K. and Choi. Y. (2016). "Suggestion for Management Method of Apartment Construction Project by Analyzing Problems about Custom-design Using Delphi Technique" Journal of Architectural Institute of Korea, 32(2), pp. 21-30.
7 Song, N., Jung, I. and Lee, C. (2005). "The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot" Korean Journal of Construction Engineering and Management, KICEM, 10(2), pp. 65-74.
8 Sathyanarayanan R., and John A. G. (2009). "Development and Initial Validation of Sustainable Construction Safety and Health Rating System" Journal of Construction Engineering and Management, 135(10), pp. 1067-1075.   DOI
9 Adler, M., and Ziglio, E. (1996). "Gazing into the oracle: The Delphi method and its application to social policy and public health." Jessica Kingsley Publishers, London.
10 Hwang, J. (2016). "Asset Management of Public Office Facility based on LOS Performance Evaluation" Thesis, Incheon University.
11 Hwang, K. and Lee, C. (2007). "Development of Procedure Model for Selecting the Method of Parking Lot Expansion in Apartment Complex" Journal of Architectural Institute of Korea, 23(2), pp. 151-160.
12 Hwang, K. (2008). "A Decision Making Model for Selection Method of Parking Lot Expansion for the Aged Apartment Complex" Thesis, Incheon University.
13 INGENIUM and IPEWA (2006). "International Infrastructure Management Manual ver3.0." National Asset Management Steering (NAMS) Group.
14 Jin, K., Chae, M., Lee, G. and Lee. G. (2005). "Infrastructure Asset Management Policy and Strategy Development" Korean Journal of Construction Engineering and Management , KICEM, 10(6), pp. 67-77.
15 Jo, S., Ko, K., Hwang, J. and Lee. C. (2015). "Development of Framework for Asset Management of Public Building." Journal of Korea Institute for Structural Maintenance and Inspection , 19(2), pp. 133-142.   DOI
16 Jung, I. (2008). "Alternative Evaluation Methodology in the Development of Environmental-friendly Residential Land using Fuzzy Inference and AHP" Thesis, Incheon University.
17 Kim, D., Park, C. and Kim, H. (2012). "A Study on the Expansion for the Parking Lots in Deteriorated Apartments - A Case Study of the High-rise Apartments in Deajeon Area" Journal of Architectural Institute of Korea, 28(2), pp. 159-169.