Many companies have endeavored to build a quality cost management system in order to be more productive business organization. This study shows the detail procedures of constructing a quality cost management system which is believed to be appropriate for their business system. That is, the method to calculate the quality cost and the linking logic between the quality improvement and its financial impact are explained based on a particular industry case. In this sense, the changes of business performance measures such as market share, customer satisfaction, etc. were analyzed in the longitudinal perspective for the consecutive 4 years (2003~2006). As the quantitative results of this study, the improvement activities based on the quality cost management system resulted in the 32% reduction of quality cost and the 121% increase of business profit, compared 2005 with 2006. In the qualitative perspective, the successive practice of quality cost reduction and the job information sharing in business unit were obtained by providing the best practices and bench-marking cases. Finally, the customer satisfaction has increased so that the customer-friendly management system has been accomplished. With these efforts, the 3.4% increase of the market share and the 3% increase of the customer satisfaction were obtained in 2005. As the future study, the current study can be extended to the concept of COPQ (cost of poor quality) which focuses on the hidden quality cost of the whole business activities. Such extension of analysis will help us understand the wider role of a quality cost management system in the business.
Korean Journal of Construction Engineering and Management
/
v.4
no.4
s.16
/
pp.212-219
/
2003
In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.
Quality is a critical competitive factor in today's environment because of the impact of quality on costs and delivery. Many companies regard quality as a key concept of company strategy in order to achieve the competitive edge. Measuring and reporting quality cost is the first step in quality management program. The supposition of quality cost model is that investment in prevention activities will bring rewards from reduced failure costs, and that further investment in prevention activities will show profits from reduced appraisal costs. In this study, the degree of quality cost deviation is conceptualized. This means a deviation between the ideal and present ranking in the amounts of quality cost categories. This study analysed that the effect of its deviation on quality management activity and performance variables. However, there are no difference in these variables. The major reason is that most of companies are endeavoring for quality management but operating quality cost system unsystematically. The review against a prevention and appraisal activity is necessary.
Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
International conference on construction engineering and project management
/
2007.03a
/
pp.711-720
/
2007
Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.
Journal of the Korean Society for information Management
/
v.30
no.1
/
pp.151-178
/
2013
This study aims to propose a lifecycle cost model for electronic records & archival management. For this purpose, the study identified cost elements based on analysing public records & archival management activities and proposed cost factors for management by applying data gathered from records centers & archives. The study employed various methods: desk research, activity analysis, a cost information survey and interviews with experts in digital preservation, and records/archival management. The study made the first step to the cost studies in electronic records management in Korea. It is expected to update the CoMMPER model and redefine activities of electronic records management. Further case studies based on the model is required.
This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.
Journal of Construction Engineering and Project Management
/
v.8
no.2
/
pp.17-33
/
2018
This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.
International conference on construction engineering and project management
/
2011.02a
/
pp.510-515
/
2011
Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.
The safety management cost system under the Construction Technology Promotion Act has contributed greatly to the prevention of construction accidents according to the chronological changes and social demand, but various problems have been pointed out. The biggest problem is that the safety management cost is earmarked very low because other items of safety management costs except for the safety inspection are not appropriately included in the actual construction site. Furthermore, it has been pointed out that it is difficult to settle the orderer due to the lack of specific use criteria. Therefore, in order to secure the proper safety management cost, this study is to estimate the actual cost by using of specification, quantity, material cost, labor cost for each type of the safety management item The results of this study were compared with the 71 cases of safety management costs in the safety management plan. In addition, analysis of unclear or unnecessary items in the current safety management cost and criteria and suggestions for improvement are provided. It is hoped that the results of this study will contribute to the rational safety management rate calculation.
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.147-155
/
2012
Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.