• 제목/요약/키워드: Maintenance and Repair

검색결과 1,063건 처리시간 0.032초

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2005년도 학술발표대회 논문집
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

CTC 상태감시 데이터 해석기법 (Analysis Method of CTC Status Monitoring)

  • 최규형;정의진;강규현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.273-279
    • /
    • 1999
  • The main purpose of this study is to develope a Simulator for Central Traffic Controller(CTC) which can check the operating status of CTC and support tile maintenance procedure. The simulator supervise the CTC processor units and the data transmission between the CTC modules and the railway station equipments to define the validity of system functions and notify whether the eqipments are good or not. With the help of the simulator we could detect the error of CTC equipments easily. repair the faults efficiently. and improve tile reliability of CTC system.

  • PDF

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.

하이브리드 콘크리트 보수재료로 보수된 흄관의 휨 거동 평가 (An Evaluation of Flexural Behavior of Fume Pipe Repaired by Hybrid Concrete Repair Materials)

  • 유성원;최영철
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제23권6호
    • /
    • pp.92-98
    • /
    • 2019
  • 본 연구에서는 기존콘크리트와의 부착성능 및 수밀성을 향상하기 위해 기존의 현장에서 사용하는 초속경 시멘트에 PVA 분말수지, 나일론 섬유를 혼입한 보수재료를 개발하고 개발된 보수재료로 보수된 흄관의 보수 후 휨거동 평가를 수행하였다. 주요 실험변수는 PVA 분말수지, 나일론 섬유 혼입률 및 손상유형이며, 성능 실험으로는 압축강도와 보수재료 후 휨거동평가를 수행하였으며 개발된 보수재료는 PVA 분말수지 혼입량이 증가할수록 압축강도가 감소하는 경향이 나타났으며, 모든 배합에서 보수재료의 요구 성능을 충분히 만족하는 것으로 나타났다. 보수된 관 시험체들의 휨강도 실험결과, 나일론 섬유를 혼입하고 PVA분말을 적정량을 첨가하여야 보수재료의 성능이 최대가 되는 것으로 나타났다. 모든 시험체들의 휨거동은 다소 철근비가 작은 구조부재에서 나타나는 휨거동 양상을 보이는 것으로 나타나, 국내의 흄관에 배근되는 철선량이 다소 부족함을 추정할 수 있었다. 즉, 철선의 배근량이 다소 적어 콘크리트와 철선의 거동이 극한상태에 도달하기 전에 콘크리트에 균열이 발생되고 곧바로 콘크리트의 인장강도를 초과하여 파괴되는 것을 확인할 수 있었다.

다축 제어용 PC-Based Motion Controller 설계에 관한 연구 (A Study on the PC-Based Motion Controller Design for Multi-Axis Control)

  • 안호균
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2000년도 전력전자학술대회 논문집
    • /
    • pp.641-644
    • /
    • 2000
  • Recently As the performance of the personal computer has been improving rapidly lots of research for the pc-based numerical computer actively progress in an easy repair maintenance and improving the performance with less cost. This paper presents the design using complex programmable logic device(CPLD). The CPU of Motion Controller that function as the real time control of the independent multi-axis motion the error-detect module and external I/O control made use of 80C196KC, In this paper The PC-NC effectively distributed to the load of NCK(numerical computer kernel) and have the advantage of high speed and precision.

  • PDF

22.9kV 배전철탑용 아킹혼 설계 (A Development of 22.9kV Arcing Horn for Distribution Line Towers)

  • 오훈;손홍관
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권2호
    • /
    • pp.70-75
    • /
    • 2006
  • Owing to the strike of lightning a breakage of insulator would happen. This breakage may give rise to many problems such as increment of reclosing failure, a drop for reliance and a hardship of maintenance and repair. To solve those problem, this study develop a protected equipment for insulator which is suitable to 22.9[kV] distribution line towers and is purposed to investigation for a Proper adaption, Protection efficiency of insulator and effect of adaption.

배전철탑용 아킹혼 개발 (A Development of Arcing Horn for Distribution Line Towers)

  • 조현섭;유인호
    • 한국산학기술학회:학술대회논문집
    • /
    • 한국산학기술학회 2006년도 추계학술발표논문집
    • /
    • pp.172-175
    • /
    • 2006
  • Owing to the strike of lighting a breakage of insulator would happen. This breakage may give rise to many problems such as increment of reclosing failure, a drop for reliance and a hardship of maintenance and repair. To solve those problems, this study develop a protected equipment for insulator which is suitable to 22.9kV distribution line towers and is purposed to investigation for a proper adaption, protection efficiency of insulator and effect of adaption.

  • PDF

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • 제3권3호
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF

도시철도 선로의 배선기능 증진에 관한 연구 (A Study on Track Distribution Function of Urban Rail Systems)

  • 홍철기;양신추;김연태
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1174-1179
    • /
    • 2004
  • In general, the national rail system put an emphasis on distribution planing of stations for smooth operation of transporting goods, train allocation, parking, and maintenance. Since the national rail system is operated on the ground level, it is feasible to improve various aspects of the system during its operation. On the contrary, urban rail system is operated in the limited space under the ground, and thus, improving various aspects of the system during its operation is infeasible. Specifically, the urban subway system must have a comprehensive track distribution plan because the urban subway system has to operate in a limited environment such as it operates in a much shorter time period, The subway system has to be ready for various operations and events such as trains returning in the opposite direction. parking trains that need repair, parking during night time, storing various maintenance equipments, and connections to other tracks. Furthermore, considering the future extension of tracks, a comprehensive track distribution plan is a must.

  • PDF

PDA를 이용한 무선교량유지관리(MBMS) Application 개발 (Application of Personal Digital Assistant (PDA) for Mobile Bridge Management System (MBMS))

  • 이태식;이동욱;이성현
    • 한국철도학회논문집
    • /
    • 제7권3호
    • /
    • pp.223-231
    • /
    • 2004
  • The accumulated BMS data have made it easy to make reasonable decision-making for bride maintenance and repair work. In the developing period of BMS, the bridge management was not easy due to the lack of understanding of BMS and low credibility of the data. In recent years, it has been possible to enhance the credibility of the data and to expand the application scopes of BMS with the efforts of Local Road Construction Offices. The reasonable decision making for bridge management can improve the performance of bridges under the practical constraints such as limited budget. It can then result in the reduction of bridge maintenance budget. This study provides the methodology for the application of mobile internet-based KOBMS for bridge management. The data flow for BMS is the most important factor for decision-making on budget allocation, and this study establishes the basic scheme of the data flow for BMS. The implementation of PDA for BMS may suggest a new paradigm of 'Mobile' in the field of construction management.