A Study on Track Distribution Function of Urban Rail Systems

도시철도 선로의 배선기능 증진에 관한 연구

  • Published : 2004.10.01

Abstract

In general, the national rail system put an emphasis on distribution planing of stations for smooth operation of transporting goods, train allocation, parking, and maintenance. Since the national rail system is operated on the ground level, it is feasible to improve various aspects of the system during its operation. On the contrary, urban rail system is operated in the limited space under the ground, and thus, improving various aspects of the system during its operation is infeasible. Specifically, the urban subway system must have a comprehensive track distribution plan because the urban subway system has to operate in a limited environment such as it operates in a much shorter time period, The subway system has to be ready for various operations and events such as trains returning in the opposite direction. parking trains that need repair, parking during night time, storing various maintenance equipments, and connections to other tracks. Furthermore, considering the future extension of tracks, a comprehensive track distribution plan is a must.

Keywords