• Title/Summary/Keyword: Maintenance and Repair

Search Result 1,062, Processing Time 0.024 seconds

A Study on an Efficient Size Dry Docks for Warship Maintenance using Queueing Problem (대기문제를 이용한 효율적인 함정정비 건선거 규모 연구)

  • Ok, Kyoung-Chan;Cho, Sung-Jin;Jeon, Jae-Hyo;Yang, Jae-Young;Cho, Youn-Chol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.4
    • /
    • pp.428-434
    • /
    • 2014
  • Dry docks are used to repair warships or Merchant ships based on their life cycles. There are the certain number of dry docks in the ROK Navy, However, the ROK Navy force structure has been changing a lot since the Korean War. The focus of this study is to analyze the queueing problem regarding present dry docks capacities and to forecast the appropriate number of dry docks based on future naval ship structure. The study proposes to obtain an efficient dry dock size using queueing problem and simulation.

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

Analysis Method of CTC Status Monitoring (CTC 상태감시 데이터 해석기법)

  • 최규형;정의진;강규현
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.273-279
    • /
    • 1999
  • The main purpose of this study is to develope a Simulator for Central Traffic Controller(CTC) which can check the operating status of CTC and support tile maintenance procedure. The simulator supervise the CTC processor units and the data transmission between the CTC modules and the railway station equipments to define the validity of system functions and notify whether the eqipments are good or not. With the help of the simulator we could detect the error of CTC equipments easily. repair the faults efficiently. and improve tile reliability of CTC system.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

An Evaluation of Flexural Behavior of Fume Pipe Repaired by Hybrid Concrete Repair Materials (하이브리드 콘크리트 보수재료로 보수된 흄관의 휨 거동 평가)

  • Yoo, Sung Won;Choi, Young Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.6
    • /
    • pp.92-98
    • /
    • 2019
  • In this study, we developed a repair material incorporating PVA powder resin and nylon fiber into cemented carbide used in the existing field to improve adhesion performance and water tightness with existing concrete. Flexural behavior evaluation was performed. The main experimental variables were PVA powder resin, nylon fiber mixing rate and damage type, and performance tests were conducted to evaluate compressive strength and flexural behavior after repairing materials. It was found that all formulations fully satisfied the required performance of the repair material. The flexural strength test results of the repaired tube specimens showed that the performance of the repaired materials was maximized when the nylon fiber was added and the PVA powder was added in an appropriate amount. The flexural behavior of all the specimens showed the flexural behavior of the structural members with a low rebar ratio, suggesting that the amount of iron wire in the domestic fume pipe was somewhat insufficient. That is, it was confirmed that the amount of reinforcement of the steel wire was somewhat small, so that the concrete was cracked before the behavior of the concrete and the steel wire reached the extreme state, and the concrete was immediately destroyed beyond the tensile strength of the concrete.

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • v.3 no.3
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF

A Study on Track Distribution Function of Urban Rail Systems (도시철도 선로의 배선기능 증진에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Youn-Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1174-1179
    • /
    • 2004
  • In general, the national rail system put an emphasis on distribution planing of stations for smooth operation of transporting goods, train allocation, parking, and maintenance. Since the national rail system is operated on the ground level, it is feasible to improve various aspects of the system during its operation. On the contrary, urban rail system is operated in the limited space under the ground, and thus, improving various aspects of the system during its operation is infeasible. Specifically, the urban subway system must have a comprehensive track distribution plan because the urban subway system has to operate in a limited environment such as it operates in a much shorter time period, The subway system has to be ready for various operations and events such as trains returning in the opposite direction. parking trains that need repair, parking during night time, storing various maintenance equipments, and connections to other tracks. Furthermore, considering the future extension of tracks, a comprehensive track distribution plan is a must.

  • PDF

Application of Personal Digital Assistant (PDA) for Mobile Bridge Management System (MBMS) (PDA를 이용한 무선교량유지관리(MBMS) Application 개발)

  • 이태식;이동욱;이성현
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.223-231
    • /
    • 2004
  • The accumulated BMS data have made it easy to make reasonable decision-making for bride maintenance and repair work. In the developing period of BMS, the bridge management was not easy due to the lack of understanding of BMS and low credibility of the data. In recent years, it has been possible to enhance the credibility of the data and to expand the application scopes of BMS with the efforts of Local Road Construction Offices. The reasonable decision making for bridge management can improve the performance of bridges under the practical constraints such as limited budget. It can then result in the reduction of bridge maintenance budget. This study provides the methodology for the application of mobile internet-based KOBMS for bridge management. The data flow for BMS is the most important factor for decision-making on budget allocation, and this study establishes the basic scheme of the data flow for BMS. The implementation of PDA for BMS may suggest a new paradigm of 'Mobile' in the field of construction management.

A Study on the PC-Based Motion Controller Design for Multi-Axis Control (다축 제어용 PC-Based Motion Controller 설계에 관한 연구)

  • 안호균
    • Proceedings of the KIPE Conference
    • /
    • 2000.07a
    • /
    • pp.641-644
    • /
    • 2000
  • Recently As the performance of the personal computer has been improving rapidly lots of research for the pc-based numerical computer actively progress in an easy repair maintenance and improving the performance with less cost. This paper presents the design using complex programmable logic device(CPLD). The CPU of Motion Controller that function as the real time control of the independent multi-axis motion the error-detect module and external I/O control made use of 80C196KC, In this paper The PC-NC effectively distributed to the load of NCK(numerical computer kernel) and have the advantage of high speed and precision.

  • PDF

A Development of 22.9kV Arcing Horn for Distribution Line Towers (22.9kV 배전철탑용 아킹혼 설계)

  • Oh Hun;Sohn Hong-Kwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.2
    • /
    • pp.70-75
    • /
    • 2006
  • Owing to the strike of lightning a breakage of insulator would happen. This breakage may give rise to many problems such as increment of reclosing failure, a drop for reliance and a hardship of maintenance and repair. To solve those problem, this study develop a protected equipment for insulator which is suitable to 22.9[kV] distribution line towers and is purposed to investigation for a Proper adaption, Protection efficiency of insulator and effect of adaption.