• Title/Summary/Keyword: Maintenance Priority

Search Result 265, Processing Time 0.032 seconds

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

Assessment of The Priority Order of Monitoring Devices on Maintenance for The Long-Term Safety of Existing Fill Dam (기존 필댐 장기간 안전관리를 위한 계측항목 유지보수 우선순위 산정)

  • Lee, Jongwook;Jeon, Jaesung;Lim, Heuidae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.67-79
    • /
    • 2009
  • Although readjustment of monitoring system for existing fill dam maintenance is needed by the sustainable increasing of the abandonment rate of monitoring devices by malfunction through the life-cycle of dam, monitoring plans for long-term dam safety has relied on the experience and the opinion of minor expert group without systematic and quantitative analysis on the failure modes and the priority order of monitoring devices on maintenance. In this study the priority order of monitoring devices of existing 5 fill dams was evaluated quantitatively based on the preceding study (Andersen et al, 1999) and the result recommended the establishment of real-time monitoring system for seepage, pore pressure and crest settlement as the readjustment plan for existing fill dam monitoring system. This readjustment plan matches well with the recommendation of PWRI (1984), JCOLD (1986) and the results from Bagherzadeh-Khakkahali and Mirghasemi (2005).

  • PDF

A Study on High Speed Railway Track Deterioration Prediction (고속선 궤도틀림진전예측에 관한 연구)

  • Shim, Yun-Seop;Kim, Ki-Dong;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.261-267
    • /
    • 2010
  • Present maintenance of a high speed railway is after the fack maintenance that executes a task when measured value goes over threshold value except some planned maintenance. It is difficult from efficient management of maintenance human resource and equipment commitment because it is difficult to predict quantity of maintenance targets. Corrective maintenance is pushed back on the repair priority of other target to need repair and it is exceeded repair cost potentially. For safety and dependable track management because track deterioration prediction is linked directly with track's life and safety of train service, it is very important that track management be based on preventive maintenance. In this study, we propose statistics model of track quality to use track inspection data and forecast model for track deterioration prediction.

  • PDF

A Study on Algorithm for Determining Seismic Improvement Priority of Highway Bridges (도로교 내진보강 우선순위 결정을 위한 알고리즘에 관한 연구)

  • Kim, Hyung-Gyu;Jang, Il-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.6
    • /
    • pp.138-147
    • /
    • 2018
  • With the recent series of damage caused by earthquakes in Korea, such as Gyeongju and Pohang, we know that Korea is no longer a safe zone for earthquakes and that we need to be prepared for them. In addition, bridges built prior to the introduction of seismic design concepts remain without adequate seismic reinforcement measures, and earthquake reinforcement should be performed efficiently considering economic and structural safety. Preliminary assessment of seismic performance of existing bridges is divided into four seismic groups, taking into account seismicity, vulnerability and Impact, considering the magnitude of the existing bridge's seismic, and prioritization for further evaluation of seismic performance. In this study, unlike the existing anti-seismic reinforcement priority method, scores are calculated based on the seismic design criteria applied to bridges, importance coefficient of the bridge including the zone coefficient and the Importance, vulnerability index of the bridge including the soil condition and the elapsed years, detail coefficient of the bridge including the superstructure form, the span length, the width, the height, the design load, and the daily traffic volume. The calculated score items will be weighted and grouped according to the results. Using this, a simpler and more efficient algorithm was proposed to determine the priority of seismic reinforcement on a bridge.

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

Key Success Factor For Korea high speed Track Maintenance Decision Making Support System (고속선 궤도관리 의사결정지원 시스템 개발을 위한 성공요인)

  • Kim, Jong-Kyong;Lee, Choon-Kil;Woo, Byoung-Koo;Kim, Nam-Hong;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.486-493
    • /
    • 2007
  • In the field of maintenance of domestic high-speed railroad which has cost a great deal more than any other fields since it was opened; 1) We found out the conditions of current domestic railroad by understanding the status of track maintenance and analyzing operative processes of track maintenance. 2) The main factors in track maintenance of high-speed railroad, that is, the elements for success to help decision-support in track maintenance were derived from a research on literature about the condition of railroad R&D in these days and about the prediction of the irregular progresses of track. 3) We derived the order of priority and weights from AHP analysis which was based on the survey regarding elements for success.

  • PDF

Prioritization of Anti-Icing Spray System for Active Snow-Removal Works (능동적 제설작업을 위한 염수분사장치 설치 우선순위 선정)

  • Yang, Choong Heon;Kim, In Su
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.99-105
    • /
    • 2015
  • PURPOSES: This study aims to establish the priority of introducing anti-icing spray system for regions of the National Highways in South Korea. Using this study, a logical plan for instituting such an anti-icing spray system can be established for the National Highways. METHODS : The Analytical Hierarchy Process (AHP) was employed to prioritize the implementation of an anti-icing spray system on Korean highways. For this purpose, an existing scoring table developed by the Ministry of Land, Infrastructure Transport Affair was slightly modified in order to reflect recent trends in winter maintenance. A survey was conducted to gather the preferences regarding the developed hierarchy of road experts and agencies. Finally, the final score was produced by integrating the scoring results with estimated weights for each evaluation criterion. RESULTS: In general, Honam and the metropolitan areas have relatively high priority while other areas such as Chungcheong, Young Nam, and Gang Won appear to be uniform in importance in terms of establishing an anti-icing spray system. This result may indicate that historical weather data and traffic volumes are significant factors in deciding in winter maintenance polices CONCLUSIONS : In this study, useful insights are suggested regarding winter maintenance by simultaneously performing rapid snow removal and proactive treatment. Issues of resource allocation may be potential research items in the field transportation engineering.

An Exploratory Study on Adoption and Activation of IT for Korean Stone Industry (한국 석재산업의 IT 도입 및 활성화를 위한 탐색적 연구)

  • An, Jaeyoung;Lee, Choong C.;Yun, Haejung
    • Journal of Information Technology Services
    • /
    • v.17 no.2
    • /
    • pp.83-100
    • /
    • 2018
  • Demand for stone products used as building materials is increasing. The construction industry, the value of the stone industry is sufficient, but the domestic stone industry is very lag regarding IT utilization. However, the overseas stone industry produces high-quality products using IT. In this study, we want to offer an IT application technology priority fit for the stone industries. We identify the current status and production process of the stone industries, then set the priority of various IT, so that obtain competitiveness in the domestic stone industries, and minimize the gap between the overseas stone industries. Therefore, we used AHP method; stone industry production processes were selected as the Enterprise Operation Management, Quarrying, Manufacturing, Construction and Maintenance of first-tier. The second-tier ones are consisted of 30 factors out of IT elements. Focus group interviews were conducted to confirm the validity of each factor. As a result, most important factors of first-tier was selected as the order of Manufacturing, Quarrying, Enterprise Operation Management, and Construction & Maintenance. The top 5 of 30 factors in the second-tier were selected Smart Sensor, Mobile Device, Robot of manufacturing, GIS of quarrying, and SCM of enterprise operation management. And the factor that relatively less important was GPS of construction and maintenance. If properly applied an IT application technology for stone industry, we expect to provide efficient production lines and increase customer satisfaction, which will ultimately expand the promotion for the industry and thus act as positive factor in promoting the stone industry.

Visitors' Perceptions on Trail Use in Korean National Parks -Case Studies in Bukhansan and Chiaksan National Park- (국립공원 탐방로 이용에 대한 이용객 인식 -북한산, 치악산국립공원을 중심으로-)

  • Yoo Ki-Joon;Kwon Tae-Ho
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.4
    • /
    • pp.437-445
    • /
    • 2004
  • The purpose of this study was to provide basic visitor and trail use data for developing trail management strategies in Korean national park system. To accomplish the purpose of the study, a questionnaire survey was carried on at two different national parks(Bukhansan and Chiaksan National Park). As for the results, root and rock exposure on the trails and trail width expansion were perceived as major types of trail impact. In addition, majority of respondents pointed to construct or maintain facilities on steep paths and repair trail surface as for the priority of trail maintenance. In conclusion, the priority of trail management and maintenance has to be differently determined based on each trail conditions because visitor impacts on the trails vary along with site-specific and activity-specific differences. Findings of the study expect to be used as fundamentals in trail management strategy making for Korean national parks.

Track Deterioration Prediction and Scheduling for Preventive Maintenance of Railroad (궤도 유지보수를 위한 틀림진전 예측 및 일정최적화)

  • Kim, Dae-Young;Lee, Seong-Geun;Lee, Ki-Woo;Woo, Byoung-Koo;Lee, Sung-Uk;Kim, Ki-Dong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1359-1370
    • /
    • 2008
  • In the track geometry such as rails, sleepers, ballasts and fastener, track deterioration occurs by repetitive train weight and the high-speed railway takes a trend faster than normal. Track deterioration of over threshold value harms ride comfort and furthermore affect in trains safety seriously. An organic and systematic track maintenance system is very important because a trend of the track deterioration effects on track life-cycle and running safety. Also costs of the railway track permanent way and its maintenance are extremely large, forming a significant part of the total infrastructure expenditure. Therefor reasonable and efficient track maintenance has to be planed on a budget. It is required to carry out not only corrective maintenance but preventive maintenance for the track maintenance. In order to perform maintenance jobs in the boundary of the machines and resources given regarding the type and amount jobs, it is necessary to determine feasible or optimal scheduling considering the priority. In this study, the system organization and required functions for the development of track maintenance system supported track deterioration prediction and optimal scheduling are proposed.

  • PDF