• Title/Summary/Keyword: Maintenance Planning

Search Result 835, Processing Time 0.023 seconds

A study on Methodology for Street Furniture Improvement with Space Syntax (공간구문론을 이용한 농촌마을 가로환경시설 정비 방안)

  • Kwon, Soon Chan;Lim, Chang Su;Kim, Eun Ja;Oh, Yun Kyung;Yoon, Gi Eun;Choi, Jin Ah
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.29-39
    • /
    • 2015
  • In farming area, the elderly population is increasing year after year. And the gap between farming area and the city regarding quality of life is getting bigger and bigger. Besides, it has much poorer ground for living than the city. The current farming village maintenance project is adopting a different system now from the top-down project exclusively led by the government in the past to the bottom-up one reflecting how the residents think positively. Lack of the residents' understanding and education about the maintenance project, however, some of them are just focused on maintenance and development distorted from making a village where people want to live. Accordingly, this study will analyze the characteristics of farming villages by their types based on field research and spatial analysis using Space Syntax in order to develop more premeditated and effective maintenance plans to perform maintenance in farming area. As a result, When you install streetlights street lights should be installed at places with a high of Connectivity and spatial depth is deep. Based on this method, the research is going to suggest the current status of street furniture improvement in the villages and the proper positions for their future installation.

Analysis of Legislation and Guidelines on Riverfront Assessment and Management System in Korea (하천 친수공간 평가·관리체계 개선을 위한 국내 법제도 분석)

  • Lee, Hyung-Sook
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.97-104
    • /
    • 2018
  • Riverfront plays an important role as accessible and inclusive public space for residents, and a riverfront development and management has become a social and environmental issue. The purpose of this study is to analyze Korean legislation and guidelines applied in a riverfront assessment process to identify any legislative problems. To this end, major laws, regulations, national river management plans, and various guidelines related to river management were reviewed. The followings are the suggestions proposed for future improvement. First, clear and consistent definitions on riverfront areas and its spatial range are required across the laws. Also, recreational activities and facilities in riverfront should be categorized and listed for possible development and maintenance. Second, it is necessary to develop an objective and unified riverfront assessment system. Also, guidelines for surveying and evaluating the conditions and potentials of riverfront should be developed. Third, efforts should be made to revise related laws and guidelines to enable comprehensive and systematic approach in design, planning, implementation, maintenance of riverfront. Improving the related legislations and streamlining an riverfront assessment process can help create environmentally-friendly riverfront spaces and mange them efficiently.

A Study on The Operational Activation of the Facilities in the Rural Development Project - A Focus on the IPA on The Project Selection Factor and The Operation of a Business - (농촌지역개발사업 조성 시설물의 운영 활성화 방안 연구 - 사업선정요소에 대한 IPA분석 및 사업운영을 중심으로 -)

  • Kim, Hae-Young;Na, seung-hwa;Shin, Yong-Gyu;Cho, Joong-Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.89-97
    • /
    • 2019
  • This study aims to make a revitalizing plan for managing and maintaining of facilities which were installed after the rural development projects. The survey was conducted to examine some issues of operating facilities from the developing plan. There were some factors that should be considered in the establishment stage of the project plan when promoting rural development projects. Among them, the preservation and maintenance of rurality, consistency with business plans, connectivity with local resources, and ease of maintenance were less reflective than its importance. And for each facility, systematic consulting on appropriate scale and operational management plans and detailed planning is needed.. It's also necessary to plan action so that the local community can lead. The current or future rural development project will be succeeded when local governments support to strengthening their local groups or people's abilities.

Building Commissioning Management Framework from the Case Study of Green Building (녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출)

  • Jeong, Jin-Hak;Park, So-Yeon;Song, Dong-Hun;Ahn, Yong-Han
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.8
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

An Analysis of the Discovering and Survey Techniques for Rural Amenity Resources - A Case Study of Seochen County - (농촌어메니티자원 발굴 및 조사기법의 특성분석 - 서천군을 사례로 -)

  • Heo, Jun
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.2
    • /
    • pp.75-84
    • /
    • 2007
  • Rural amenity resources show a particular rural community's identity. They also provide recreational, aesthetic and economic value. This research aimed at systematizing finding surveying techniques of rural amenity resources for planning rural community. For conducting the study, existing finding and surveying techniques of rural amenity resources in the case of comprehensive Amenity Planning of Seochen County in Choongcheongnam Province. The research findings are as followings; (1) 190 amenity resources were found in Seochen County, (2) archival research and interview methods were used for finding resources, (3) the present status and maintenance conditions were examined through on-the-spot survey, (4) resources were photographed and recorded by making descriptive notes verbally and diagrammatically.

A Study on the Environmentally-friendly Planning Factors of Permanent Rental Housing (영구임대주택 친환경 계획요소에 관한 연구)

  • Park, Eun-Mi;Shin, Nam-Soo
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.165-168
    • /
    • 2006
  • This study beings from solving problems of permanent rental housing with environmentally-friendly planning factors to raise quality of life. Environmentally-friendly planning factors of permanent rental housing are derived from the study of references and green building certification systems of other countries. Surveys of inhabitants and experts give weights on these factors. Inhabitants do are focussed natural ventilation, life cycle cost, operation and maintenance cost. This reflects their interest in indoor amenity and a burden on the cost. Experts put more weights on pedestrian spaces considering the old and feeble persons and block planning. Besides, T-test pointed out that there are meaningful differences in land use between inhabitants and experts. Though inhabitants' opinion has priority because they are real user, experts' opinion which has the variety and the view in the long term should be reflected.

  • PDF

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.

Guide-line for Developing a Maintainability Program (보전성 경영 프로그램 개발을 위한 지침)

  • 이낙영;김종걸;권영일;홍연웅;전영록;나명환
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.269-269
    • /
    • 2001
  • Maintainability refers to the ease with which maintenance work can be done. It involves the process of ensuring that products can be easily and safely maintained and that the maintenance support requirement is minimized. When a product has a reasonably long life, the cost of operation and support during that life can greatly exceed the initial capital cost. The value to the customer of optimizing maintainability should be evident. Some effort and expense applied to achieving a product which can be easily and cheaply maintained will make very significant savings in the life cycle costs. In this paper, the International Standard IEC 60300-3-10, which is the application guide for maintainability, is considered. This standard can be used to implement a maintainability program covering the initiation, development and in-service phases of a product. It provides guidance on how the maintenance aspects of the tasks should be considered in order to achieve optimum maintainability. The elements of a maintainability program, which are maintenance policy and concept, maintainability studies, project management, design for maintainability, analysis and prediction methods, maintenance verification and validation, analysis of life cycle cost, maintenance support planning, and collection and analysis of maintenance data, are fully discussed in this paper.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.