• Title/Summary/Keyword: Maintenance Performance

Search Result 3,059, Processing Time 0.036 seconds

Suggestions on Efficient O&M Plan for Improving Users' Satisfaction on the University Dorm Facilities (대학 기숙사 시설의 사용자 만족도 향상을 위한 효율적인 유지보수관리(O&M) 방안 제안)

  • Kim, Min Soo;Kim, Yujin;Kim, Jun Ha
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.5
    • /
    • pp.11-18
    • /
    • 2017
  • An university dorm has significant implications in terms of providing residential, living, and learning spaces. With its supportive function, a dorm enables each university to provide higher level of education. The operation & maintenance(O&M) condition of the dorm has a decisive effect on the students' satisfaction. Accordingly, high levels of O&M services should be performed for students. However, Korean dorms are being operated and maintained by their own O&M guidelines without the consideration of spatial characteristics of dorm facilities and the comprehensive and systematic understanding on effective O&M processes. Given the fact that dorm facility can be a crucial factor in determining the entire quality of university and its O&M condition is closely related to the satisfaction of students, it is imperative that we need to pay more attention to the O&M condition and services. Therefore, the main objective of this research is to improve dorm students' satisfaction levels by applying different O&M method, preventive maintenance rather than reactive maintenance which has been performed so far. In ordering for doing it, 'Facility Management(FM) Standard' from KS, 'Facility Performance Indicator(FPI)' from APPA: Leadership in educational facilities and 'Building O&M Inspection Manual' from Korean Ministry of Land, Infrastructure and Transport were analyzed to come up with 15 significant O&M factors. After extracting O&M factors, the survey was conducted to determine importance rate and performance rate of each O&M factor. Using the Important-Performance Analysis(IPA), the priority of 15 O&M factors was established. The result of this research will be helpful for the efficient dorm facility O&M services and for facility managers to appropriately allocate the limited resources and human power.

A study on the Improvement of the Korea Green Building Certification Criteria by Assessing the Maintenance Categories (국내 친환경 건축물 인증 제도의 유지관리 부문 개선 방안)

  • Kim, Chang-Sung;Kim, Kyung-Ah
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.129-135
    • /
    • 2011
  • Many countries have carried out various policies about sustainable building to protect the earth against the global warming and environmental pollution. Korea government has also executed the Green Building Certification System. In order to keep the performances of certificated buildings sustainable, the effective building maintenance is quite necessary. Meanwhile, the foreign green building certification systems have considered the building maintenance as one of the most important items to keep the building performance effective. However, Green Building Certification Criteria(GBCC) of Korea has not had the sufficient criteria for the maintenance of green building. Therefore, The purpose of this study is to find direction for the improvement of management categories of Korea Green Building Certification Criteria. For this aim, GBCC was compared with the foreign certification systems such as LEED, BREEAM and CASBEE.

A Feasibility Study on Adopting the Maintenance Rule (정비 규정 도입 타당성 연구)

  • 황미정;김길유
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2000.11a
    • /
    • pp.279-285
    • /
    • 2000
  • In Korea, as risk informed applications and regulations become active, the necessity of Maintenance Rule(MR) has increased. The objective of this study is to understand the effectiveness and the application method of the Maintenance Rule, which is one of the performance-based regulations and to propose the effective maintenance and regulation method. Also, Periodic Safety Assessment (PSR) and Reliability Centered Maintenance (RCM) are introduced a little.

  • PDF

Implementation of Traveling Wave Tube Amplifier Maintenance System for the Microwave Surveillance Radar (마이크로파 탐색레이더 진행파관증폭기 정비시스템 구현)

  • Yoon, In-Chul;Kwon, Jong-Woon;Park, Yong-Man;Odgerel, Odgerel;Kim, Hie-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.264-266
    • /
    • 2006
  • This traveling wave tube amplifier maintenance system was developed for performance of microwave Surveillance radar traveling wave tube amplification parts, and field operation. The Maintenance system is traveling wave tube amplification part RF output waveform measurement and HVPS Voltage adjustment and a maintenance function are offer. The system was developed as an embedded system base it consisted of Linux os which applied a top-down design and visual technique. Therefore change and easy extension of a system. This paper discussed characteristic of maintenance equipment function, composition, and an employment program.

  • PDF

Multi-Dimensional Analysis of Earned Value for Building Facility Maintenance (건축 시설물 유지관리 기성실적의 다차원적 분석)

  • Kim, Tae-hyeong;Bae, Jong-hwan;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.240-241
    • /
    • 2015
  • As buildings and especially eco-friendly facilities are increasing, maintenance of the aged buildings are interested by many maintenance companies. Therefore, a lot of companies are increasing by the maintenance form. These Earned Value should try to minimize the increasing forms. Therefore, this study has an effort to gather data related to earned value of building facility maintenance and analyze the data in terms of local dimension, used duration dimension, building types dimension and so on in order to prevent the building deterioration.

  • PDF

Efficiency Analysis for Maintenance Management System of Users' Claims in Building (사용자 클레임에 대응하는 건물유지관리체계의 효율성 분석)

  • Kwak, Ro-Yeul;Yim, Dong-Soon
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.820-825
    • /
    • 2006
  • It is necessary to correspond to building users' claims rapidly as much as possible in order to satisfy user's need, because the final tarket of building maintenance service is user of building. This paper investigates the time taken for receiving users' claims and the time taken for the service organization to respond to the claims in the office building; types of claims and service responses are analysed, through which the response characteristics of the maintenance management organization are evaluated with respect to users' claims. Throughout extensive simulation analysis, important performance measures such as mean time to repair and utilization of maintenance personnels have been investigated.

  • PDF

Development of Maintenance Scenario Method for Small and Medium-sized Bridges Using Risk Matrix (리스크매트릭스를 활용한 중소규모 교량의 유지관리 시나리오 기법 개발)

  • Park, Hyun-Chan;Shin, Byoung-Gil;Cho, Choong-Yuen;Kim, Young-Min;Chang, Buhm-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.161-168
    • /
    • 2021
  • This paper is a maintenance system for bridge represented by Class 3 and other than by law bridges. Domestic bridge are divided into Class 1 & 2 bridges and Class 3 & other than by law bridges. The number of type 3 and other than by law bridges is very large. But, it is considered to be of relatively low importance compared to Class 1 & 2 Bridge Bridge. So, in this paper is propose a maintenance system and procedure for small & medium-sized bridges. However, because the number of small & medium-sized bridges is large, it is not possible to evaluate the performance of all bridges like Class 1 & 2 bridge. The reason is the lack of manpower and budget. Based on the Risk Matrix method, a maintenance procedure was created to select the bridge for which performance evaluation should be performed first. For this purpose, basic information of the bridge is used. And, the developed maintenance procedures were applied to the bridges in actual use.