• Title/Summary/Keyword: Long-term electricity supply and demand

Search Result 46, Processing Time 0.029 seconds

A Study on the Improvement of Planning procedure and estimation of Capacity Addition in Long Term Electricity Plan (전력수급기본계획 수립에서 의향서 평가절차의 개천 방안)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.745-747
    • /
    • 2005
  • After restructuring electricity industry, national long term electricity plans moved to "Basic plan of electricity supply and demand" from "Long term power development plan". The main point is a change of path from plan of power development at national level to plan of electricity supply and demand at company level. A proposal by generation company is surveyed and reflected to the basic plan of electricity supply and demand. The second plan shows over 40% reserves in result of the proposals. It is the time to evaluating the proposal which covers market function in the basic plan of electricity supply and demand at the stage of market change. This research presents the need of evaluation of proposals and the methods of evaluation. Also it presents the alternative planning procedure to reflecting the evaluation methods.

  • PDF

The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand (전력수급기본계획에 열병합발전 설비 반영 방법론의 개발)

  • Kim, Yong-Ha;Kim, Mi-Ye;Woo, Sung-Min;Cho, Sung-Rin;Lim, Hyun-Sung
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.12
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

The Analysis of Effect in Order to Consider Combined Heat and Power Capacity in the Basic Plan of Long Term Electricity Supply & Demand (전력수급기본계획에 열병합발전 설비 반영시의 효과분석에 관한 연구)

  • Kim, Yong-Ba;Moon, Jung-Ho;Yeon, Jun-Hee;Jung, Hyun-Sung;Woo, Sung-Min;Kim, Mi-Ye
    • Journal of Energy Engineering
    • /
    • v.16 no.1 s.49
    • /
    • pp.22-31
    • /
    • 2007
  • This paper addresses methodology in order to consider CHP (Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand and presents effects on it. The method performs state in extent that do not change maximum in the Basic Plan of Long Term Electricity Supply & Demand. For analysis that occurs some advantage this method compares with Basic Plan of Long Term Electricity Supply & Demand. It includes EES (Expected Energy Served), Fuel consumption, amount of $CO_{2}$ emission reduction.

A Study on the DSM Policy and Power Supply in Jeju Island (제주지역 전력공급과 효과적인 수요관리 방안)

  • KIM C.S.;Rhee C.H.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.677-679
    • /
    • 2004
  • Although Jeju is an island, its electricity demand is 430MW. It indicates electricity demand and its growth rate in Jeju are higher than mainland average. The supply of electricity in Jeju consists of power plants within the island and connection of main system using cable line. The cost of supply is higher than mainland system. However the electricity rate and DSM incentives were treated equally with mainland. Therefore, Effective DSM promotion has not been carried out. This paper analyzes the policy alternatives of supply in Jeju and presents effective DSM countermeasures. Also it presents long-term policy on stabilization of supply and demand in Jeju.

  • PDF

Energy Transition Policy and Social Costs of Power Generation in South Korea (에너지 전환정책과 발전의 사회적 비용 -제7차와 제8차 전력수급기본계획 비교-)

  • Kim, Kwang In;Kim, Hyunsook;Cho, In-Koo
    • Environmental and Resource Economics Review
    • /
    • v.28 no.1
    • /
    • pp.147-176
    • /
    • 2019
  • This paper uses research on the Levelized Cost of Electricity (LCOE) in South Korea to conduct a simulation analysis on the impact of nuclear power dependency and usage rates on the social costs of power generation. We compare the $7^{th}$ basic plan for long-term electricity supply and demand, which was designed to increase nuclear power generation, to the $8^{th}$ basic plan for long-term electricity supply and demand that decreased nuclear power generation and increased renewable energy generation in order to estimate changes in social costs and electricity rates according to the power generation mix. Our environmental generation mix simulation results indicate that social costs may increase by 22% within 10 years while direct generation cost and electricity rates based on generation and other production costs may increase by as much as 22% and 18%, respectively. Thus we confirm that the power generation mix from the $8^{th}$ basic plan for long-term electricity supply and demand compared to the $7^{th}$ plan increases social costs of generation, which include environmental external costs.

Regional Electricity Demand Forecasting for System Planning (계통계획을 위한 지역별 전력수요예측)

  • Jo, I.S.;Rhee, C.H.;Park, J.J.
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.292-294
    • /
    • 1998
  • It is very important for electric utility to expand generating facilities and transmission equipments in accordance with the increase of electricity demand. Regional electricity demand forecasting is among the most important step for long-term investment and power supply planning. The main objectives of this paper are to develop the methodologies for forecasting regional load demand. The Model consists of four models, regional economy, regional electricity energy demand, areal electricity energy demand. and areal peak load demand. This paper mainly suggests regional electricity energy demand model and areal peak load demand. A case study is also presented.

  • PDF

Portfolio Analysis on the New Power Generation Sources of the Sixth Basic Plan for Long Term Electricity Demand and Supply (포트폴리오 이론을 활용한 제6차 전력수급기본계획의 신규전원구성 비교 연구)

  • Kim, Juhan;Kim, Jinsoo
    • Environmental and Resource Economics Review
    • /
    • v.23 no.4
    • /
    • pp.583-615
    • /
    • 2014
  • Including the rolling black out in 2011, Korea has suffered from rapid increase of electricity consumption and demand forecasting failure for last five years. In addition, because of the Fukushima disaster, high fuel prices, and introduction of new generation sources such as renewables, the uncertainty on a power supply strategy increases. Consequently, a stable power supply becomes the new agenda and a revisino of strategy for new power generation sources is needed. In the light of this, we appraises the sixth basic plan for long term electricity demand and supply considering the changes of foreign and domestic conditions. We also simulate a strategy for the new power generation sources using a portfolio analysis method. As results, a diversity of power generation sources will increase and the share of renewable power generation will be surged on the assumptions of a cost reduction of renewable power sources and an increase of fuel costs. Particularly, on the range of a risk level(standard deviation) from 0.06 and 0.09, the efficient frontier has the most various power sources. Besides, the existing power plan is not efficient so that an improvement is needed. Lastly, the development of an electricity storage system and energy management system is necessary to make a stable and efficient power supply condition.

A Study of Economic Efficiency and Environmental Performance Due to the Conversion of the 7th and 8th Basic Plan for Long-term Power Supply and Demand (제7차 및 제8차 전력수급기본계획 전원 구성 전환에 따른 경제성 및 환경성 변화 분석 연구)

  • Cho, Sungjin;Yoon, Teayeon;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.28 no.2
    • /
    • pp.201-229
    • /
    • 2019
  • This paper estimates the effects of generation mix changes in the $7^{th}$ and $8^{th}$ Basic Plan for Long-term Power Supply and Demand from two aspects: economic efficiency through electricity prices and environmental performance through $CO_2$ and air pollutants(NOx, SOx, PM) emissions. Particularly, we examined additional generation mix conversion paths that take into account the trade-off between economic efficiency and environmental performance through scenario analysis. According to our results, the conversion from the $7^{th}$ plan to the $8^{th}$ plan should increase the electricity prices in the mid- and long-term, while reducing GHG and air pollutants emissions at the same time. The alternative generation mix that combines $7^{th}$ and $8^{th}$ plans shows that there exists a path to mitigate the trade-off between economic and environmental in the long-term. It will be next to impossible to derive a optimal generation mix that simultaneously considers the core values, such as supply stability, environmental performance, economic efficiency, energy safety and energy security, when establishing the power supply and demand plan. However, by exploring the effects of various generation mix paths and suggesting near-optimal paths, people can best choose their direction after weighhing all the paths when deciding on a forward-looking generation mix in the long term.

Analysis of Power Supply Cost According to Nuclear and Renewable Energy Policies (원전 및 신재생에너지 정책에 따른 전력공급비용 분석)

  • Woo, Pil Sung;Kim, Kang-won;Hwang, Soon-hyun;Kim, Balho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.16-21
    • /
    • 2018
  • As a result of the Fukushima disaster and climate change due to excessive greenhouse gases, international energy affairs are currently focused on establishing safe and environment-friendly policies. To achieve this, Republic of Korea has established a plan for environment-friendly energy supplies. It is expected that policy enforcement will be accompanied by an increase in energy supply costs. An analysis of energy supply costs is necessary before the establishment of any national energy policy. This paper analyzes and compares the energy supply costs accompanying environmental and nuclear energy policies, based on the Korean National Energy Master Plan and the Basic Plan for Long-Term Electricity Supply and Demand, in order to understand the implications of these national energy policies.

Assessment of Transmission Losses with The 7th Basic Plan of Long-term Electricity Supply and Demand (7차 전력수급계획에 따른 송전계통 손실 분석에 관한 연구)

  • Kim, Sung-Yul;Lee, Yeo-Jin
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.2
    • /
    • pp.112-118
    • /
    • 2018
  • In recent years, decentralized power have been increasing due to environmental problems, liberalization of electricity markets and technological developments. These changes have led to the evolution of power generation, transmission, and distribution into discrete sectors and the division of integrated power systems. Therefore, studies are underway to efficiently supply power and reduce losses to each sector's demand. This is a major concern for system planners and operators, as it accounts for a relatively high proportion of total power, with a transmission and distribution loss of 4-6%. Therefore, this paper analyzes the status of loss management based on the current transmission and distribution loss rate of each country and transmission loss management cases of each national power company, and proposes a loss rate prediction algorithm according to the long-term transmission system plan. The proposed algorithm predicts the demand-based long-term evolution and the loss rate of the grid to which the transmission plan is applied.