• 제목/요약/키워드: Long-term Development Plan

검색결과 437건 처리시간 0.028초

보건의료발전계획 수립의 시급한 필요성 (The Urgent Need to Establish the Plan for Development of Health and Medical Services)

  • 박은철
    • 보건행정학회지
    • /
    • 제29권3호
    • /
    • pp.245-247
    • /
    • 2019
  • Although 19 years have passed since the enforcement of the Framework Act on Health and Medical Services, the Plans for Development of Health and Medical Services has not been established. This Plan is a 5-year basic long-term plan that covers the whole of health and medical services. This Plan should point to the direction of 30 long-term plans of healthcare, and this Plan should serve as a combination and coordination of 30 long-term plans and 22 related laws. The United States, the United Kingdom, and Japan have established long-term healthcare plans (4-, 10-, and 20-year plans, respectively). The long-term health plan of the United States has been approached bottom-up, those of the United Kingdom and Japan have been approached top-down. The rapid environmental changes that Korea is and will be experiencing emphasize urgently the need for establishing the Plan for Development of Health and Medical Services.

대학도서관 전략적 계획의 평가에 대한 연구 - 국내 국립대학교 도서관 사례를 중심으로 - (A Study on the Evaluation of Strategic Plan of Academic Libraries - Focused on the Cases of National University Libraries in Korea -)

  • 이용재
    • 한국도서관정보학회지
    • /
    • 제46권4호
    • /
    • pp.551-574
    • /
    • 2015
  • 이 연구는 국내 대학도서관의 장기발전계획의 유용성을 제고하기 위하여 장기발전계획의 내용을 분석하였다. 특히, 이 연구는 전략적 계획의 평가에 중점을 두고, 외국의 대학도서관 전략적 계획 평가 방법에 근거하여 평가기준을 도출하였다. 이에 따라 국내 대학도서관의 장기발전계획이 전략적 계획의 핵심요소를 얼마나 반영하고 있는지를 평가하였다. 평가 결과, 국내 대학도서관의 장기발전계획은 도서관 발전을 장기적 관점에서 견인하는 전략적 계획의 성격보다 일상업무로서의 도서관 운영계획의 성격을 더 많이 포함하고 있음이 밝혀졌다.

장기개발계획상의 방재제도 개선 (Improvement of Flood Disaster Mitigation on Long-term Development Plan)

  • 고영찬;오남선
    • 한국항만학회지
    • /
    • 제15권1호
    • /
    • pp.107-119
    • /
    • 2001
  • Disaster mitigation, especially as a concept similar to damage mitigation caused by heavy rainfalls and flood is closely related to long-term development plan. This plan of an harbor area where is located in lower region is established and carried under consideration of disaster mitigation concept such as internal drainage and so on. Flood damage is somewhat predictable in accordance with height, stream and rainfall characteristics of the region. Therefore it is necessary to establish national and urban plan under consideration of this fact. But this consideration of existing regulation and institution is insufficient and improvement of regulation and institution is needed. This consideration of disaster mitigation fields is regulated declaratively and inclusively in national plan which is established in broad region, and specifically and detailedly in urban plan which is established in narrow region. The program to improve regulation and institution is proposed in order to consider disaster mitigation fields as a level of this plan.

  • PDF

전력수급기본계획 수립에서 의향서 평가절차의 개천 방안 (A Study on the Improvement of Planning procedure and estimation of Capacity Addition in Long Term Electricity Plan)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.745-747
    • /
    • 2005
  • After restructuring electricity industry, national long term electricity plans moved to "Basic plan of electricity supply and demand" from "Long term power development plan". The main point is a change of path from plan of power development at national level to plan of electricity supply and demand at company level. A proposal by generation company is surveyed and reflected to the basic plan of electricity supply and demand. The second plan shows over 40% reserves in result of the proposals. It is the time to evaluating the proposal which covers market function in the basic plan of electricity supply and demand at the stage of market change. This research presents the need of evaluation of proposals and the methods of evaluation. Also it presents the alternative planning procedure to reflecting the evaluation methods.

  • PDF

"도서관연구소" 중장기 발전방안 연구 (A Study of Long-term Development Plan of Korea Research Institute for Library and Information)

  • 윤희윤
    • 한국도서관정보학회지
    • /
    • 제39권2호
    • /
    • pp.5-27
    • /
    • 2008
  • 본 연구는 "도서관연구소"의 중장기 발전방안을 제시하는데 목적이 있다. 이를 위하여 주요 외국의 도서관연구 및 관련기구를 분석하여 시사점을 도출하였으며, 또한 도서관연구소를 SWOT 분석하고, 문헌정보학 분야의 교수를 상대로 도서관연구소의 바람직한 역할과 위상에 대한 인식도를 조사하였다. 이를 바탕으로 도서관연구소의 비전과 목표, 전략적 추진과제, 바람직한 위상과 조직체계, 중장기 성장 발전 모형, 내적 운영협력 및 대외 연구협력 체계 등을 제안하였다.

  • PDF

창업보육센터의 중장기 발전 전략: 창업기업 인터뷰와 선진국 창업보육센터 벤치마킹을 토대로 (Mid- to Long-term Development Strategies of Business Incubation Centers - Based on Interviews with Start-up Companies and Benchmarking of Business Incubation Centers in Developed Countries)

  • 김수경
    • Journal of Information Technology Applications and Management
    • /
    • 제30권4호
    • /
    • pp.1-9
    • /
    • 2023
  • The purpose of this study was to make a mid- and long-term development plan on the business incubator center after interviewing five startups that currently being occupied in or already left the center and reviewing benchmark on business incubator centers in developed countries such as USA, Sweden, and Israel. For the interview, the three startups currently being occupied in the center and the two companies already left the center were participated. The main strengths of the center from all of these five companies were easy accessibility to the equipment and space and at the same time trustworthy from the outside vendors and/or government, etc. USA is a leading country who has long history for the startups but mostly the private companies/organizations/individuals have supported the startups in terms of funding or consulting. Also, there are countless local governments nationwide who provide funding, education, and/or space for the small businesses. Mainly based on the interview and the benchmarking, the mid- and long-term development plan for the business incubator center was made. All six themes such as consortium for investment or a local network plan were derived for the development plan which was described in this study.

철도망 구축을 고려한 철도시스템의 기술개발전략 (A Strategy of Technology Development for the Railway System based on Railway Network)

  • 이희성
    • 한국철도학회논문집
    • /
    • 제9권3호
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

공동주택 공종별 수선시기 설정 연구 (A Study on the Repair Time of the Construction Type in the Apartment Housings)

  • 이강희;박근수;채창우
    • 한국주거학회논문집
    • /
    • 제22권4호
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

SCP-Matrix based shipyard APS design: Application to long-term production plan

  • Nam, SeungHoon;Shen, HuiQiang;Ryu, Cheolho;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제10권6호
    • /
    • pp.741-761
    • /
    • 2018
  • A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.