References
- Adrodegari, F., Bacchetti, A., Pinto, R., Pirola, F., Zanardini, M., 2015. Engineer-to-Order (ETO) production planning and control: an empirical framework for machinery-building companies. Prod. Plan. Control 26 (11), 910-932. https://doi.org/10.1080/09537287.2014.1001808
- Back, M.G., Lee, D.K., Shin, J.G., Woo, J.H., 2016. A study for production simulation model generation system based on data model at a shipyard. Int. J. Nav. Archit. Ocean. Eng. 8 (5), 496-510. https://doi.org/10.1016/j.ijnaoe.2016.05.005
- Cho, K.K., Oh, J.S., Ryu, K.R., Choi, H.R., 1998. An integrated process planning and scheduling system for block assembly in shipbuilding. CIRP Ann. Manuf. Technol. 47 (1), 419-422. https://doi.org/10.1016/S0007-8506(07)62865-0
- Choi, H.S., Park, K.H., 1997. Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system. J. Intell. Manuf. 8 (6), 505-515. https://doi.org/10.1023/A:1018578820621
- Ennis, K.J., Dougherty, J.J., Lamb, T., Greenwell, C.R., Zimmermann, R., 1998. Product-oriented design and construction cost model. J. Ship Prod. 14 (1), 41-58.
- Fast, K.R., 2000. Development of a Shipbuilding Simulation Process Modeling Database. National Shipbuilding Research Program: DTIC Document.
- Fleischer, M., Kohler, R., Lamb, T., Bongiorni, H.B., 1999. Marine supply chain management. J. Ship Prod. 15 (4), 233-252.
- Fleischmann, B., Meyr, H., 2003. Planning hierarchy, modeling and advanced planning systems. Handb. Oper. Res. Manag. Sci. 11, 455-523.
- Fleischmann, B., Meyr, H., Wagner, M., 2008. Advanced planning. In: Stadtler, H., Kilger, C., Meyr, H. (Eds.), Supply chain Management and Advanced Planning. Springer, Germany, Berlin Heidelberg, pp. 81-106.
- Gosling, J., Naim, M.M., 2009. Engineer-to-order supply chain management: a literature review and research agenda. Int. J. Prod. Econ. 122 (2), 741-754. https://doi.org/10.1016/j.ijpe.2009.07.002
- Gosling, J., Towill, D.R., Naim, M.M., Dainty, A.R., 2015. Principles for the design and operation of engineer-to-order supply chains in the construction sector. Prod. Plan. Control 26 (3), 203-218.
- Hicks, C., McGovern, T., Earl, C.F., 2000. Supply chain management: a strategic issue in engineer to order manufacturing. Int. J. Prod. Econ. 65 (2), 179-190. https://doi.org/10.1016/S0925-5273(99)00026-2
- Kallestrup, K.B., Lynge, L.H., Akkerman, R., Oddsdottir, T.A., 2014. Decision support in hierarchical planning systems: the case of procurement planning in oil refining industries. Decis. Support Syst. 68, 49-63. https://doi.org/10.1016/j.dss.2014.09.003
- Koenig, P.C., MacDonald, P., Lamb, T., Dougherty, J., 1997. Towards a Generic Product-oriented Work Breakdown Structure for Shipbuilding. The Society of Nav. Architects and Marine Engineers.
- Kim, H., Lee, J.K., Park, J.H., Park, B.J., Jang, D.S., 2002. Applying digital manufacturing technology to ship production and the maritime environment. Integr. Manuf. Syst. 13 (5), 295-305. https://doi.org/10.1108/09576060210429748
- Lee, J.K., Lee, K.J., Hong, J.S., Kim, W., Kim, E.Y., Choi, S.Y., Kim, H.D., Yang, O.R., Choi, H.R., 1995. DAS: intelligent scheduling systems for shipbuilding. AI Mag. 16 (4), 78-94.
- Meyr, H., Wagner, M., Rohde, J., 2008. Structure of advanced planning systems. In: Stadtler, H., Kilger, C., Meyr, H. (Eds.), Supply chain Management and Advanced Planning. Springer, Germany, Berlin Heidelberg, pp. 109-115.
- Mello, M.H., Strandhagen, J.O., 2011. Supply chain management in the shipbuilding industry: challenges and perspectives. Proc. Inst. Mech. Eng. Part M J. Eng. Marit. Environ. 225 (3), 261-270. https://doi.org/10.1177/1475090211406836
- Okayama, Y., Chirillo, L.D., 1980. ProductWork Breakdown Structure (No. NSRP-SPC-SP-2). MARITIME ADMINISTRATION WASHINGTON DC.
- Olhager, J., 2010. The role of the customer order decoupling point in production and supply chain management. Comput. Ind. 61 (9), 863-868. https://doi.org/10.1016/j.compind.2010.07.011
- Park, K., Lee, K., Park, S., Kim, S., 1996. Modeling and solving the spatial block scheduling problem in a shipbuilding company. Comput. Ind. Eng. 30 (3), 357-364. https://doi.org/10.1016/0360-8352(96)00004-6
- Rahman Abdul Rahim, A., Shariff Nabi Baksh, M., 2003. The need for a new product development framework for engineer-to-order products. Eur. J. Innov. Manag. 6 (3), 182-196. https://doi.org/10.1108/14601060310486253
- Rudberg, M., Thulin, J., 2009. Centralised supply chain master planning employing advanced planning systems. Prod. Plan. Control 20 (2), 158-167. https://doi.org/10.1080/09537280802705047
- Sanderson, J., Cox, A., 2008. The challenges of supply strategy selection in a project environment: evidence from UK naval shipbuilding. Supply Chain Manag. An Int. J. 13 (1), 16-25. https://doi.org/10.1108/13598540810850283
- Sarder, M.B., Ali, A., Ferreira, S., Rahman, M.A., 2010. Managing material flow at the US shipbuilding industry. In: International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh.
- Shin, J.G., Lee, K.K., Woo, J.H., Kim, W.D., Lee, J.H., Kim, S.H., Park, J.Y., Yim, H., 2004. A modeling and simulation of production process in subassembly lines at a shipyard. J. Ship Prod. 20 (2), 79-83.
- Sommerville, I., 2010. Software Engineering, ninth ed. Addison-Wesley, Massachusetts.
- Song, Y.J., Woo, J.H., Shin, J.G., 2009. Research on a simulation-based ship production support system for middle-sized shipbuilding companies. Int. J. Nav. Archit. Ocean. Eng. 1 (2), 70-77. https://doi.org/10.2478/IJNAOE-2013-0009
- Sriram, P.K., Alfnes, E., Arica, E., 2012. A concept for project manufacturing planning and control for engineer-to-order companies. In: IFIP International Conference on Advances in Production Management Systems. Springer, Berlin Heidelberg, pp. 699-706.
- Stadtler, H., Kilger, C., 2008. Supply chain Management and Advanced Planning, fourth ed. Springer, Berlin Heidelberg.
- Staeblein, T., Aoki, K., 2015. Planning and scheduling in the automotive industry: a comparison of industrial practice at German and Japanese makers. Int. J. Prod. Econ. 162, 258-272. https://doi.org/10.1016/j.ijpe.2014.07.005
- Vidoni, M.C., Vecchietti, A.R., 2015. A systemic approach to define and characterize Advanced Planning Systems (APS). Comput. Ind. Eng. 90, 326-338. https://doi.org/10.1016/j.cie.2015.10.006
- Vlachakis, N., Mihiotis, A., Pappis, C.P., Lagoudis, I.N., 2016. A methodology for analyzing shipyard supply chains and supplier selection. Benchmarking Int. J. 23 (2), 443-455. https://doi.org/10.1108/BIJ-08-2013-0082
- Whitehead, K., 2002. Component-based Development: Principles and Planning for Business Systems. Addison-Wesley, Massachusetts.
- Woo, J.H., Song, Y.J., Kang, Y.W., Shin, J.G., 2010. Development of the decision-making system for the ship block logistics based on the simulation. J. Ship Prod. Des. 26 (4), 290-300.
- Woo, J.H., Song, Y.J., 2014. Systematisation of ship production management and case study for ship block assembly factory. Int. J. Comput. Integr. Manuf. 27 (4), 333-347. https://doi.org/10.1080/0951192X.2013.800237
- Zoryk-Schalla, A.J., Fransoo, J.C., de Kok, T.G., 2004. Modeling the planning process in advanced planning systems. Inf. Manag. 42 (1), 75-87. https://doi.org/10.1016/j.im.2003.06.005
Cited by
- System development for establishing shipyard mid-term production plans using backward process-centric simulation vol.12, pp.None, 2020, https://doi.org/10.1016/j.ijnaoe.2019.05.005
- Simulation-based planning system for shipbuilding vol.33, pp.6, 2020, https://doi.org/10.1080/0951192x.2020.1775304
- A decade of engineering-to-order (2010–2020): Progress and emerging themes vol.241, pp.None, 2021, https://doi.org/10.1016/j.ijpe.2021.108274