• 제목/요약/키워드: Lee, Gyeongbu

검색결과 49건 처리시간 0.03초

열차 통과시 분기기 인근 소음진동 발생특성 (Characteristics of Noise and Vibration emitted from Turnout System)

  • 임정빈;이홍기;박해동;엄기영;엄주환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 추계학술대회논문집
    • /
    • pp.747-750
    • /
    • 2006
  • A turnout which permits trains to pass from one track to another has a disconnecting rail component, namely a crossing, so that noise and vibration arc occurred abruptly when train is passing through it. In Korea, it is planned to adopt the high speed tilting train, which operates at the speed of 180 km/h, at the conventional line. However, for application of the tilting train, it is prerequisite to establish the stable turnout system allowing the tilting train to pass through it without reducing speed. This study was performed to evaluate noise and vibration emitted from the prototype turnout which is developed for speed-up of the conventional line. For the purpose, noise and vibration were measured at near the conventional turnout and the improved one, which is constructed at Waegwan station and Kumi station of Gyeongbu line, respectively.

  • PDF

철도공사를 통해 본 대한제국기 청부업의 초기적 형태 (Primitive Forms of General Contractor Business in the Railroad Construction during the Daehan Empire)

  • 이수연;전봉희
    • 건축역사연구
    • /
    • 제29권5호
    • /
    • pp.17-28
    • /
    • 2020
  • The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.

철도 차량 운전원의 소음노출 특성 (Exposure to Noise on Railroad Operators)

  • 이상윤;최상준
    • 한국환경보건학회지
    • /
    • 제34권2호
    • /
    • pp.153-160
    • /
    • 2008
  • Personal noise exposure was assessed in railroad operators working in 40 operation units including the Gyeongbu line, Honam line, and Janghang line between 2004 and 2006. 8-hour TWA were assessed based on the MOL (Ministry of Labor) guideline on noise evaluation, and 17% of these measurements exceeded 85 dBA while 70% were over 80 dBA. When the ACGIH TLV is adopted, 40% of measurements were over TLV (85 dBA). The noise exposure risk of railroad operators was higher for diesel locomotive operation and longer operational distances; in addition, the risk was higher for passenger car operation compared to freight car driving. Given that in Korea, over the past 30 years diesel locomotives have provided most of the railway's motive power and that hearing protective equipment is not likely to be used by workers during operation, railroad operators are at a high risk of noise-induced hearing loss. The result of audiometric test among 568 railroad operators showed that 32.6% of those tested had a hearing threshold shift of more than 40 dB. In conclusion, this study calls for more fundamental measures including noise control countermeasures within the operation areas, development of equipment that generates less noise and adopting limitation on the operation distance for a work shift.

경부선 직하부를 나란히 통과하는 도심지 터널에 있어서 지표물리탐사 및 암반등급 평가 사례 연구 (The geophysical survey and rock classification suitable for the design of a tunnel in urban area passing underneath the Gyeongbu Line(Railload))

  • 이건;김은덕;사상호;차영호;김태영;정두석;황낙연
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.673-679
    • /
    • 2005
  • Urban conditions such as underground facilities and ambient noises due to cultural activity restrict the application of conventional geophysical techniques in general. We used the linear array microtremor technique which uses these noises as strong energy source. The result parameter of the survey is shear wave velocity profile which had been applied as an fundamental information for the determination of the rock support type in tunnel design. This study was the first case in Korea which utilized a surface geophysical technique yielding successful result in urban area especially under the existing rail ways. The quantitative relation between the shear wave velocity from this method and the rock mass rating(RMR) determined from the inspection of the cores recovered from the same boreholes showed high statistical relationship. These correlations were then used to relate the shear-wave velocity to RMR along the entire profile.

  • PDF

경부고속철도 교량의 과도한 가속도의 저감방안에 대한 연구 (A Study on the Solution of Excessive Accelerations on the Bridge for Gyeongbu High-speed Railway)

  • 곽종원;진원종;최은석;조정래;이정우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.477-485
    • /
    • 2007
  • When Korean High Speed Train (KTX) runs over a high-speed railway bridge, the high-speed railway bridge gives quite large acceleration response. Local vibration at the large cross section, the impact from equally spaced sleepers, the vibration due to elastomeric bearings, and the vibration from the train itself are the causes of this acceleration response. Maximum peaks of the accelerations measured at the bridges are sometimes going over the limit value. Although it is smaller than 0.35G, the limit from the Korean Bridge Design Manual(BRDM), this acceleration response should be reduced for the safety of running trains with high speed. In this paper, to reduce the acceleration response by controlling excessive local vibration at the large cross section, vibration reduction method is studied. The result shows that the effect of elastomeric bearings on the vibration of the bridge is very large and that the vibration reduction device is effective against wing mode local vibration PSC box girder bridge for the high-speed railway, which usually has very large cross section, although it has little effect on global vibration modes such as flexural and twisting modes. The test of the vibration reduction device on the bridge in service has been performed in this study.

  • PDF

Numerical analysis for dynamic characteristics of bridge considering next-generation high-speed train

  • Soon T. Oh;Dong J. Lee;Seong T. Yi;Byeong J. Jeong
    • Advances in Computational Design
    • /
    • 제8권1호
    • /
    • pp.1-12
    • /
    • 2023
  • To consider the effects of the increasing speed of next-generation high-speed trains, the existing traffic safety code for railway bridges needs to be improved. This study suggests a numerical method of evaluating the new effects of this increasing speed on railway bridges. A prestressed concrete (PSC) box bridge with a 40 m span length on the Gyeongbu track sector is selected as a representative example of high-speed railway bridges in Korea. Numerical models considering the inertial mass forces of a 38-degree-of-freedom train and the interaction forces with the bridge as well as track irregularities are presented in detail. The vertical deflections and accelerations of the deck are calculated and compared to find the new effects on the bridge arising with increasing speed under simply and continuously supported boundary conditions. The ratios between the static and dynamic responses are calculated as the dynamic amplification factors (DAFs) under different running speeds to evaluate the traffic safety. The maximum deflection and acceleration caused by the running speed are indicated, and regression equations for predicting these quantities based on the speed are also proposed.

표정속도 향상에 따른 기술동향 연구 (A Study on Technology Trend according to Schedule Speed Improvement)

  • 이훈구;이남형;최경선;편선호;엄기영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.140-144
    • /
    • 2011
  • As a result of that the domestic railway technology has been progressed as times go by, the 1st and the 2nd steps for Gyeongbu HSR at the speed of more than 300km/h, were completed and Honam HSR - its operational speed is 350km/h - is under construction. Additionally, As a part of the expressization project for general lines, the Seoul-Chuncheon route at the speed of more than 180[km/h] is under construction and the Jeolla route is under design. At present, 11 countries (e.g. France, Germany, Belgium, Italy, the Netherlands, Spain, England, Japan, China and Taiwan) including Korea have high speed railways operated at the speed of more than 300[km/h]. As shown in the above, the domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. For overseas railway, the ratio of schedule speed to the highest speed is above 65%, while that of domestic railways is over 50%. It shows a significant difference between them. It is expected that the schedule speed improvement will increase the number of train operation and line capacities than now, so it shall achieve smooth transportation flow and improve the passengers' satisfaction. In this paper we describe the necessity for the improvement of schedule speed, by analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand.

  • PDF

콘크리트 슬래브궤도에서 보상 커패시터의 위치 및 전기용량에 대한 연구 (A Study on the location of Compensation Capacitor and Capacitance in the Concrete Slab Track)

  • 김민석;이상혁;고준석;이종우;조수익;유진영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.879-891
    • /
    • 2009
  • Impedance of rails is increased by the magnetic coupling between rails and reinforcing bars in the concrete slab track. Currently, the current of track circuit has been compensated by installing the compensation capacitors on track circuit because of increasing the impedance of rails. In case of a rapid transit railway, the compensation capacitors are installed every 20[m] to compensate the current of track circuit in the concrete slab track. Because the interval of one block for a rapid transit railway is as long as 1500[m], the compensation capacitors are installed about the number of 70$\sim$75 on track circuit. However, in case the compensation capacitors are broken over the number of three, it is a problem that the amplitude of current is under standard amplitude of current which is 0.8[A]. In this paper, it was suggested installing a compensation capacitor by using resonance phenomenon on the concrete slab track. We represent the electrical model of track circuit and the four terminal network, calculate the parameters demanded for the electrical model in the concrete slab track. Also, we computed the position and capacitance of the compensation capacitor about 2040[Hz], 2400[Hz], 2760[Hz], 3120[Hz] which currently is the track circuit frequency in the Gyeongbu rapid transit railway and demonstrated the validity of it, using the Matlab and PSpice program.

  • PDF

자율주행차량 도입에 따른 고속도로 교통류 영향분석 - 경부고속도로 서울-신갈 기본구간을 중심으로 (Impacts of Automated Vehicles on Freeway Traffic-flow - Focused on Seoul-Singal Basic Sections of GyeongBu Freeway -)

  • 박인선;이종덕;이재용;황기연
    • 한국ITS학회 논문지
    • /
    • 제14권6호
    • /
    • pp.21-36
    • /
    • 2015
  • 최근 활발히 개발되고 있는 자율주행차량은 현대사회의 다양한 교통문제를 해결하기 위한 근본적인 대안으로 주목 받고 있으며, 그 효과를 예측하기 위한 연구 또한 지속적으로 진행되어왔다. 하지만 기존연구는 주로 가상의 도로를 대상으로 하여 현 도로교통시스템에 가져올 다양한 편익에 대한 검토는 미비한 상태이다. 이에 본 연구는 자율주행차량 테스트베드 구축 예정구간인 경부고속도로 서울-신갈 기본구간을 대상으로, 자율주행차량 도입에 따른 속도 및 밀도 등 다양한 교통류의 변화를 분석하였다. 분석 결과, 교통량이 적은 서비스수준 A, B 상황에서는 자율주행차량 혼입이 교통류에 부정적인 영향을 미치는 것으로 나타났다. 반면, 교통량이 많아지는 서비스수준 C 이상의 상황에서는 자율주행차량 도입에 따라 평균속도가 증가하고 밀도가 감소하여 교통류에 긍정적인 영향을 미치는 것으로 분석되었다. 이에 따라, 자율주행차량 도입이 교통혼잡 등 다양한 교통문제를 효과적으로 해결할 수 있을 것이라 기대된다.

일반 및 고속철도용 한국형열차제어시스템 확대적용 방안 연구 (Expanding Plan Study of KRTCS-2(Korean Radio Train Control System for Conventional & High Speed Railway))

  • 이강규;최종관;성동일;윤학선;박종원;김유호;이남형;유종천
    • 전기학회논문지
    • /
    • 제66권3호
    • /
    • pp.533-539
    • /
    • 2017
  • ERTMS/ETCS Level 2 is currently planning, making contract, constructing and operating at several lines in European well-developed railway countries different from past ten years ago, and applying extensively for purpose of its intercompatibility and operational efficiency, and economic feasibility. On the other hand, ATP system correspond to ETCS Level 1, which was domestically introduced in early 2000, has introduced, operated, and planned or constructed in national railwaynetwork, but the lines, which its improvement period is come, are being occurred starting Gyeongbu Line. Therefore, we study the consideration and construction plan by stages if LTE-R Korean Radio-based Train Control System for conventional & high-speed railway under domestic development is extensively applied as the third National Railway Network Construction Plan was announced.