Expanding Plan Study of KRTCS-2(Korean Radio Train Control System for Conventional & High Speed Railway)
![]() |
Lee, Kang-Gyoo
(Dept. Signalling System, Korea Rail Network Authority)
Choi, Jong-gwoan (Dept. Signalling System, Korea Rail Network Authority) Sung, Dong-Il (Dept. Signalling System, Korea Rail Network Authority) Yun, Hak-Sun (Dept. Signalling System, Korea Rail Network Authority) Park, Jong-Won (Dept. Signalling System, Korea Rail Network Authority) Kim, You-Ho (Dept. Railway Signalling System Engineering, ARTech Co., Ltd.) Lee, Nam-Hyoung (Dept. Railway Signalling System Engineering, ARTech Co., Ltd.) Yoo, Jong-Cheon (Dept. Railway Signalling System Engineering, ARTech Co., Ltd.) |
1 | UIC & UNIFE, ATLAS of ERTMS worldwide implementation, Editions Techniques Ferroviaires Railway Technical Publications, pp. 10-52, 2007. |
2 | UIC & UNIFE, ERTMS ATLAS 2016, International Union of Railways (UIC), 2016. |
3 | Mike Grimsey, ERTMS Level 3 Risks and Benefits to UK Railways, Transport Research Laboratory, pp. 32-40, 2010. |
4 | Dr. Peter Winter, Implementing the European Train Control System ETCS Opportunities for European Rail Corridor, UIC, pp. 15, 17, 2003. |
![]() |