• Title/Summary/Keyword: LNG 하역

Search Result 22, Processing Time 0.021 seconds

Reliability analysis of LNG unloading arm considering variability of wind load (풍하중의 변동성을 고려한 LNG 하역구조물의 신뢰성해석)

  • Kim, Dong Hyawn;Lim, Jong Kwon;Koh, Jae Pil
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.223-231
    • /
    • 2007
  • Considering wind speed uncertainty, reliability analysis of the LNG unloading arm at Tongyoung Production Site was performed. Extreme distribution of wind speed was estimated from the data collected at the weather center and wind load was calculated using wind velocities and coefficients of wind pressure. The unloading arm was modeled with plate and solid elements. Contact elements were used to describe the interface between base of structure andground. Response surface for maximum effective stress was found for reliability analysis and then reliability functions was defined and used to determine exceeding probability of allowable and yield stresses. In addition, sensitivity analysis was also performed to estimate the effect of possible material deterioration in the future.

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

LNG선 manifold platform 재질에 대한 고찰

  • 김봉옥;장해주;김점수
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.31 no.2
    • /
    • pp.40-42
    • /
    • 1994
  • LNG의 선적 및 하역용으로 양현 중앙부에 각각 설치되는 LNG의 MANIFOLD 구조에 있어 LNG의 선적 또는 양하시 Manifold Deck 상에 있는 연결관내의 LNG가 밸브를 통해 누설되어 코밍(coaming)내에서 자영증발 되는 동안, 누설된 저온 LNG가 Deck부재에 큰 영향을 미치게 된다. 따라서 누설된 LNG의 최대 증발시간 및 Manifold Platform 각 부분에 미치는 온도, 영향 등을 종합적으로 검토하여 부재재질의 효과적인 선정을 기해야 항 것이다. 여기서는 당사가 국내 최초로 건조한 바 있는 Single Loading System LNG선의 Manifold platform에 있어 현업 실적용을 중심으로 고찰해 보고자 한다.

  • PDF

A Study On Development of Cargo Working Education System for LNG Carrier (LNG선 하역작업 교육 시스템 개발에 관한 연구)

  • Eum Pil-Yong;Kim Dae-Hee;Song Chae-Uk;Yea Byong-Deok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.89-92
    • /
    • 2005
  • This paper describes a system for LNG carrier's loading and discharging work education This system consists of three modules(cargo work simulation, ballast work simulation and loading calculation module), and could be a useful to train mariners boarding on LNG carrier so as to take a suitable action while their ship maneuvering and cargo handling.

  • PDF

Numerical Assessment of LNGC Berthing Operation to FLBT (FLBT를 향해 접안하는 LNGC의 수치해석 및 안정성 평가)

  • Jung, Sung-Jun;Jung, Dong-Woo;Oh, Seung-Hoon;Kim, Yun-Ho;Jung, Dong-Ho
    • Journal of Navigation and Port Research
    • /
    • v.45 no.3
    • /
    • pp.87-94
    • /
    • 2021
  • The IMO has adopted emission standards that strictly restrict the use of bunker C oil for vessels. Accordingly, research and bunkering pilot projects for LNG fueled ships are being actively carried out, which is expected to substantially reduce environmental pollution. In this study, we have adopted the turret moored Floating LNG Bunkering Terminal (FLBT) designed to receive the LNG from LNGCs and to transfer LNG to LNG bunkering shuttles in ship to ship moored condition. Numerical simulations have been performed with a 1-year return period of wind, wave, and current. Damping values of numerical model were adjusted from the results of model tests to obtain accurate simulation results. The results confirm safe berthing operation during the 1-year return period of environmental condition. Safety depends on the direction of environment, with increasingly stable operation facilitated by the application of heading-control function of FLBT to avoid beam-sea conditions.

A Study on the In-Pipe Surge Analysis for Cargo Unloading Piping System of LNG Carrier (LNG선의 화물 하역 배관망의 과도 응답 해석에 관한 연구)

  • Chun, Byung-Il;Woo, Jong-Sik
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.33 no.1
    • /
    • pp.124-134
    • /
    • 1996
  • In this paper the pressures and flowrate distributions in the loading/unloading piping system of LNG carrier have been investigated in the case of unsteady flow state as well as steady one. Under emergency situation the main cargo pumps are forced to fail, and the ESD(Emergency Shut Down) valves and Stop valves are closed within set-time. The surge pressures according to the variations of valve closing time have been computed to recognize the surge phenomenon due to sudden decrease of flowrate. By means of these analysis results, the most important factors on the in-pipe surge phenomenon of cargo loading/unloading piping system of LNG Carrier are the type of ESD and Stop valves, valve closing time, and the pipe arrangements.

  • PDF

Development of Cargo Working Education System for LNG Carrier (LNG선 하역작업 교육 시스템 개발에 관한 연구)

  • Kim, Dae-Hee;Yea, Byeong-Deok;Song, Chae-Uk
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.06a
    • /
    • pp.1041-1046
    • /
    • 2005
  • This paper describes a system for LNG carrier's loading and discharging work education. This system consists of three modules(cargo work simulation, ballast work simulation and loading calculation module), and could be a useful to train mariners boarding on LNG carrier so as to take a suitable action while their ship maneuvering and cargo handling.

  • PDF

부산항 미세먼지 감축정책 추진현황

  • Gwon, So-Hyeon;Mun, Seung-Hyo;Go, In-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.05a
    • /
    • pp.56-58
    • /
    • 2019
  • 미세먼지 등 대기오염에 대한 국민적 관심 증가로 정부에서는 2022년까지 국내 배출량 30% 감축을 목표로 하는 '미세먼지 관리 종합대책'을 수립(2017년)하였으며, 국제해사기구(IMO)는 선박의 대기오염물질 배출량 감소를 위한 규정을 강화는 등 대기오염물질 감축을 위한 다양한 노력이 추진되고 있다. 그러나, 부산항을 포함한 부산지역의 미세먼지 농도는 선진국 및 WHO 기준에 비해 여전히 2~3배 높은 수준으로 부산의 주요산업인 부산항을 관리 운영하는 주체인 부산항만공사는 '부산항 미세먼지 종합대책'을 수립하여 추진하고 있다. 본 논문에서는 부산항 내 운영 중인 항만 내 대기오염측정소 데이터를 포함한 항만 인근지역과 타항만의 미세먼지 농도를 분석하였으며, 부산항만공사에서 추진한 항만 하역장비 대기오염물질 배출량 조사결과와 '야드트랙터 LNG 연료전환사업', 'AMP설비 설치사업' 등 '부산항 미세먼지 종합대책'과 그 성과를 소개하고 있다.

  • PDF

Qualitative Hazard Analysis for LNG Gas Stations Using K-PSR Method (K-PSR을 이용한 LNG 충진소에 대한 정성적 위험성평가)

  • Ko, Jae-Wook;Lee, Jae-Min;Yoo, Jin-Hwan
    • Journal of the Korean Institute of Gas
    • /
    • v.10 no.4 s.33
    • /
    • pp.63-69
    • /
    • 2006
  • With the increased interest in reducing air pollution, supply of natural gas for gas vehicles is increasing. Thus, the number of establishments of LNG and CNG stations is increasing as well. However, due to major gas accidents such as the fire and explosion accident of a Bucheon LPG station in 1998, it is difficult to establish a new station. In this research, we conducted qualitative hazard analysis fer LCNG/LNG multi-station by using the K-PSR method and proposed recommendations for hazard mitigation.

  • PDF

Study on the characteristics of perlite insulation for the storage tank in LNG carrier (LNG선박 화물창의 펄라이트 단열재 적용성에 관한 설계 특성 연구)

  • Yun, Sangkook
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.8
    • /
    • pp.843-848
    • /
    • 2013
  • As the LNG demands are growing, the constructions of LNG FPSO (Floating Production Storage and Off-loading) and LNG carriers have been constantly increased, and the various design of storage tank has been tried. This paper propose that the material of inner storage tanks is made of 5~9% Ni steel plate and perlite powder insulation instead of urethane foam block. It needs essentially to obtain the proper design specifications that are the pressure of perlite, the characteristics of resilient blanket as the pressure absorber, optimum thickness of blanket and design pressure of tank wall, etc. to enable the perlite insulation system to LNG carrier, The results show that the design thickness of blanket should be between 1/4 to 1/3 of insulation width and the optimum rate becomes 30%, and the design pressure be applied below 1,500 Pa with blanket thickness.