Characteristics of Periodical Changes on Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Korea (우리나라 조경공사 표준품셈의 시대적 변천 특성)

  • Lee, Kwan-Hee;Yun, Ju-Cheul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.131-138
    • /
    • 2009
  • This research was carried out to keep a sharp look-out on changes of estimated unit power and material in landscape architectural construction in Korea from 1962 to 2007 and to suggest basic information for its desirable direction in the near future. The research results are as follows. At first, work classification of estimated unit power and material landscape architectural construction was included under the earth work and in 1974 it had the name which was called landscape architectural process with earth works, and in 1984 the estimated unit power and material of landscape architectural construction was separated from the earth work but it was still under name of estimated unit manpower and material of the engineering construction. In 1972 the estimated unit power and material began with a 'planting' and a 'pruning' and still consists of 7 work classification total: 'sodding and herbaceous sowing', 'digging out', 'planting', 'digging round the root', 'keeping and management', 'rubble masonry' and 'planting for protection of rocks split section'. The processes consist of 29 sub-processes in total. The lawn construction was mainly established in the 1960s, the planting construction in the 1970s, the keeping and management in the 1980s, split section protection in the 1990s along with new technology with keeping management in the 2000s. On the basis of these research results, the process to be added in the near future could be related to new material and new technology and the process might be much more subdivided.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

A Study on the Crash Severity of Expressway Work Zones Using Decision Tree (의사결정나무를 이용한 고속도로 공사구간 사고 심각도에 관한 연구)

  • PARK, Yong Woo;BACK, Sehum;PARK, Shin Hyoung;KWON, Oh Hoon
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.6
    • /
    • pp.535-547
    • /
    • 2016
  • This study aims to identify factors that affect the degree of injury severity sustained in traffic crashes on work zone of Korean expressways. To this end, decision tree method was applied to identify influential factors on injury severity and compare characteristics of those factors between work zone and non-work zone. The results from the comparison show that the risk of severity was low when traffic volume and heavy vehicle ratio are high because the factors lower the overall section speed. On the other hand, when the traffic volume and the heavy vehicle ratio are low, the section speed increased and the tendency for high injury severity was confirmed. These findings are expected to help transportation planners and engineers understand which risk factors contribute more to severe injury in the work zones such that they can effectively prepare and implement safety countermeasures.

A Comparison Study of Performance between Local Government Hospitals and General Hospitals (지방공사의료원과 의료법인의 성과 비교)

  • Kim, Sang-Mi;Hwang, Sung-Wan;Yoon, Seo-Jung;Kang, Jung-Kyu
    • Journal of Digital Convergence
    • /
    • v.11 no.11
    • /
    • pp.463-470
    • /
    • 2013
  • The objective of this study is to compare hospital performance between Local Government Hospitals and General Hospitals. To compare the result of the financial performance between two groups, there were significant differences in current ratio, Fixed ratio, total assets turnover, personnel expenses to gross revenues, management expenses to gross revenues, return on assets, operating margin. The significant impact relations of ROA(Return on Assets) were formed the total assets turnover, salaries, material costs, administrative expenses. Although two groups are the similar beds, most of LGH are in the red so the managers and local government must consider the financial efficiency of LGH.

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

Database Model of Subway Construction NAS Operating System for Scheduling Management Science (공정관리 과학화를 위한 지하철공사 NAS운영체계 데이터베이스 모델링 구축)

  • Choi, Jaejin;Cho, Byounghoo;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.3
    • /
    • pp.322-331
    • /
    • 2017
  • This study proposed subway construction information classification system based on civil engineering information classification system proposed by Korea Institute of Construction Technology. Also, Based on this criterion, This study established data modeling for NAS operating system Composed of construction information classification system - network - operation and presented an relational database integrated model. The data modeling method proposed in this study can be applied to other civil engineering facilities, so it can be operated as scientific NAS.

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.