1 |
Kang, I.S. (2007), "Latest Construction Managementt", Moondojang, pp 386-388
|
2 |
Kang, I.S. (1914), "Construction Scheduling Management", Kimoondang, pp 407-413
|
3 |
Kim, B.S. (2003), "A Study on Construction of Information Classification System of Subway Construction", Journal of the Korean Society of Civil Engineers pp 855-865
|
4 |
Kong, k.p (2000), "Project Management System nex-Pert " .118-119
|
5 |
Lee, B. H. (1990). "Construction Project Information Classification System", Chung Ang University Graduate School of Construction Management Laboratory, pp.1-26
|
6 |
Park, C.Y. (1994), "A Study on the Standardization of Information Classification in the Construction Industry", Korea Institute of Construction Technology, pp 107-118
|
7 |
Park, C.J. (1998), "A Study on the Integration Construction Management System of Schedule and Cost", Myongji University, pp 5-10
|
8 |
Willam J. Rasdorf & Osama Y. (1991), "Cost and Schedule Control Integration", Journal of Management in Engineering, Vol. 117. No. 3. pp 486-502
|