• Title/Summary/Keyword: Jungang highway

Search Result 5, Processing Time 0.023 seconds

A Study on the Failure Characteristics for the Rock Slopes (Centering Around Jungang Highway) (암반사면의 붕괴특성에 관한 연구(중앙고속도로를 중심으로))

  • Kim, Jong-Ryeol;Lee, Jin-Su;Hwang, Pung-Ju;Lee, Yong-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.765-776
    • /
    • 2005
  • As a result of industrial advancement and land development, a number of highway slopes have been gradually formed and numerous problems related to their stability have been frequently caused. Generally, major factors for rock slope stability are lithology, slope inclination, slope height, degree of weathering, precipitation, condition of groundwater and so onl. Many complex factors are mostly involved in the collapse of rock slopes. In this study, a database for 94 collapsed Jungang highway slopes were set up using GIS program through literature search, site investigation, geological map and Korea tectonic province map. The analyses for the collapsed factor including sort of rock(by origin), tectonic province, highway direction, slope gradient and direction, degree of weathering, slope height were carried.

  • PDF

The Efficiency and Improvement of the Highway Wild-Life Fences for Decrease of Mammals Road-kill - In Case of Manjong~Hongchun Section on Jungang Highway - (포유류 로드킬 저감을 위한 고속도로 유도울타리 효율성 및 개선방안 연구 - 중앙고속도로 만종~홍천 구간을 사례로 -)

  • Song, Jeong-Seok;Lee, Kyong-Jae;Ki, Kyong-Seok;Jun, Ik-Yo
    • Korean Journal of Environment and Ecology
    • /
    • v.25 no.5
    • /
    • pp.649-657
    • /
    • 2011
  • This study had targeted the Manjong Junction~Hongchun interchange section of Jungang highway in order to analyze the efficiency and improvement of the highway wild-life fences. Being analyzed wild-life fence as an effective facility for the prevention of road-kill, it had founded that the wild animals did not jump over even the two layer guardrail, concrete barrier and noise barrier, fence for rock fall. For the section with high road-kill decrease effect after installing the wild-life fence, the effect was higher at wild-life fence with the height of 1.0m where the door had not been installed and the well connected points of road facility than the area with fence height of 1.5m. The road-kill decrease effect was also high at the well managed areas even if the door has not been installed. Also, road-kill had occurred by concentrating around the end of wild-life fence after installing the fence, Moreover road-kill had also occurred around the cutting section. The door of wild-life fence had higher amount of road-kill occurrence as the installation interval was closer. it was analyzed that the door management has a lot of effect on road-kill decrease. The fence for rock fall, two layer guardrail and concrete barrier having the effect of wild-life fence installed on the road would have to be installed by connecting with wild-life fences through proper facility improvement. Although the door should not be installed if possible, it should be installed as automatic door or gravity door to prevent the door from leaving the door open. An escape route has to be formed for the prompt escape away from the road for the animals entered through the ending section of the fence. The eco-corridor has to be made by restoring the soil layer of dual purpose eco-corridor forming a planting area. Also, the dead body after the accident has to be disposed to the outer section of the road immediately in order to prevent the secondary road-kill by the predator from the road-kill. The fence has to be installed as 500m or longer in both ways, in other words 1,000m or longer, from the targeted spot of minimum accident prevention while connecting up to the bridge or box culvert, etc that are next road facilities if possible to guide wild animals safely to the eco-corridor.

A Study on the Selection of Vegetation and Method for the Revegetation on the Highway Slope in Consideration of the Surrounding Environment (고속도로(高速道路) 비탈면(面)에서 주변환경(周邊環境)을 고려(考慮)한 녹화공법(綠花工法)과 식생선발(植生選拔)에 관(關)한 연구(硏究))

  • Woo, Bo-Myeong;Jeon, Gi-Seong;Kim, Kyung-Hoon;Choi, Hyung-Tae
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.4
    • /
    • pp.619-633
    • /
    • 1996
  • This study was carried out from March 1995 to February 1996 to select suitable vegetation and measures for revegetation on the highway cut-slope in consideration of the surrounding environment in the middle region of Korea. The numbers of revegetation-measures type surveyed were eighteen measures as a whole in descending order of the Seed-spraying measures, Block-sod pitching measures, and Straw-mat mulching measures. The numbers of vegetation species by highway line were 243 in Chungbu, 223 in Jungang, 210 in Kyongbu 2, 199 in Kyongbu 1, 179 in Sohaean, 163 in Seoul circulation. 148 in Shingal-ansan, 141 in Second kyongin and 123 in Kyongin respectively. The highest index of species diversity(H') was in Kyongbu 1-line and the evenness(E') on upper site was greater than that of the lower site. The revegetation measures were selected in consideration of nature of soil, gradient, area and situation, and 83 species were selected as those for revegetation measures in highway cut-slope.

  • PDF

A Study on the Potential Vegetation Recovery according to the Environment and Type of Tunnel Entrance and Exit (고속도로 터널 입·출구부 유형과 주변 환경에 따른 식생복구 잠재성에 관한 연구)

  • Lee, Sang-Cheol;Choi, Song-Hyun;Kim, Dong-Pil;Song, Jae-Tak;Oh, Hyun-Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.6
    • /
    • pp.161-172
    • /
    • 2012
  • The purpose of this study is to classify, evaluate and grade the existing highway tunnels to increase landscape and natural statistics keeping the structural safety about tunnel gates area and induce the ones that will be constructed in the future by drawing the improvements and restoring the techniques as an environment-friendly. To examine the types of tunnel gate area, total 54 tunnels were investigated by selecting Gyeongbu Expressway, Yeongdong Expressway, and Jungang Expressway. Tunnel entrances and exit ports were classified as a Wall-closed type and Protruding type, which is based on tunnel gate type. Vegetation Landscape types were classified as Multilayer-Same as the surrounding landscape_(MS), Multilayer-Difference of surrounding landscape_(MD), Single layer-Same as the surrounding landscape_(SS), Single layer-Difference of surrounding landscape_(SD), and a Desolate type which based on vegetation layers and environment-friendly. Potential vegetation recovery was identified based on the structural stability and revegetation potential of the tunnel. The factors include the structural stability of the slope height and slope gradient were selected. Revegetation potential was identified as a growth potential. This factor was used in the step to classify vegetation recovery potential of a tunnel. The result, which investigated the types of tunnel entrances and exit parts has found that the most typical in 33 places was a Wall closed type with 61.1% of the total ones. The case of vegetation landscape types was created but different from the ones surrounding it with 85.2% of the total ones. It is judged that the currently constructed vegetation of tunnel entrance and exit parts had put convenience on the safety and management before landscape consideration. In addition, tunnel entrance and exit parts with excellent potential for vegetation recovery were all Protruding type. In addition, it is judged that slope stability can easily obtain growth. Therefore, entrance and exist of the highway tunnels, which will be constructed in the future, should reflect location and the result of the natural and ecological survey in design by performing it in advance and their types, which minimize the damage area range, should be applied to the local characteristics suitably. In addition, the ecologically healthy tunnel construction should be done by introducing active vegetation recovery techniques based on its safety.