• 제목/요약/키워드: Integrating cost and schedule

검색결과 22건 처리시간 0.03초

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

BIM 객체분류체계 (OBS) 개념 및 구조 (Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM)

  • 정영수;김예솔;김민;주태환
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.88-96
    • /
    • 2013
  • 건설정보화의 다양한 노력 중, 최근 Building Information Modelling (BIM) 활용이 급속히 확대되고 있으며 그 활용 형태 또한 점차 '고도화' 및 '효율화'되고 있다. 그럼에도 불구하고, BIM 실무활용을 위해서 요구되는 다대한 추가 업무 부담은 BIM 실무적용의 가장 중요한 장애요인으로 지적되어 왔다. 이러한 맥락에서, 본 연구는 BIM 활용의 기능적인 '고도화'를 더욱 발전시키면서 동시에 이에 요구되는 업무 부담을 최소화시키는'효율화'를 연구목표로 설정하고, 이를 위한 핵심 요소기술로서, "BIM 객체 분류체계 (OBS)"를 정의하고 개발하였다. 본 연구에서 제안된 OBS는 BIM 도형정보의 각 객체별 식별번호를 목적에 부합한 규칙에 의해 부여함으로써, 비도형 정보(예로서 공정 및 원가)와의 연계를 용이케 하는 것을 목적으로 한다. 제안된 OBS 활용을 통하여 객체간의 물리적 위계 구성, 공정 액티비티 연계, 원가 정보 연계 등 다수 기능이 시스템화 되며, 따라서 다차원 CAD 구현을 위해 요구되는 지나치게 많은 데이터간의 연계 작업이 자동화됨으로써 BIM 실무구현의 현실성을 획기적으로 높일 수 있다. 제안된 OBS의 개념은 신한옥 주택 건설 사례를 통하여 적용 및 검증하였다.

신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계 (Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok))

  • 정영수;김우중;하지원
    • 한국CDE학회논문집
    • /
    • 제17권4호
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안 (Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information)

  • 강인석;지상복;문현석;안재규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.809-812
    • /
    • 2007
  • 본 연구에서는 4D CAD의 객체정보에 자원 및 비용정보를 연동한 nD CAD시스템의 기능 구성방안을 제안하며, 제안된 기능들은 플랜트공사의 시각화된 방식 공정모델을 선정할 수 있는 시나리오기반 공정분석 모형으로 구성하였다. 제안된 모형은 다양한 공사관리 정보를 nD CAD기반으로 통합함으로써 최적 일정계획과 자원 및 비용정보의 효율적인 시각화 관리가 가능하다. 또한 최적 공정 시나리오 분석 및 분석정보의 공유 기능을 통해 발주자의 효율적인 의사결정 정보로 활용될 수 있다.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구 (A study on the normal project duration development for the construction of multi-utility tunnel in the existing city)

  • 이성원;이필윤;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.677-685
    • /
    • 2018
  • 건설공사에서 공정관리는 기본적으로 가장 중요한 단계이며, 효율적인 공정관리를 위해서는 합리적 공정표 작성이 우선시 되어야 한다. 설계단계에서는 기상조건과 현장 특성을 고려한 다양한 조건과 공법의 비교 검토를 통해 최적의 공사 기간을 산정할 수 있으나, 기획단계에서 기본적인 자료(D/B) 분석만으로는 효율적 공법 선정과 적정한 공사 기간 산정이 어렵다. 따라서, 기획단계에서 기존시가지의 공동구 건설시 표준공기 분석을 위하여, 본 논문에서는 공동구 형식을 개착식 및 터널식으로 구분하고, 각 형식의 특성과 기존시가지의 조건을 고려한 공법을 선정 하도록 하였다. 합리적인 공기 계산을 위하여 외부 공사에 영향을 주는 기상조건을 고려하여 년 간 가동율을 산정 하였으며, 개착식은 RC 공법/터널식은 Shield TBM 공법에 대한 단위공정을 분석하였다. 각 단위공정을 종합하여 연장 1,200m, 환기구 200m 간격으로 가정한 공사의 표준공기를 산정한바, 개착식은 893일, 터널식은 616일이 소요되는 것으로 분석 되었다. 본 연구의 결과는 기획단계에서 보다 쉽게 공동구 형식 선정과 표준공기 산정에 도움이 될 것이며, 추후 설계단계에 연계하면 공정 및 공사비 산정이 용이할 것으로 판단된다.

에이전트를 이용한 글로벌 구매 외주환경의 구축 (Global Purchasing and Ordering Environment using Agent Technology)

  • 김태운;김홍배;현재명
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제6권2호
    • /
    • pp.85-105
    • /
    • 1997
  • The objective of this research is to construct and build a software platform to enable collaboration among enterprise headquarters, product designers, software engineers, manufacturing plants, and suppliers which are locate at different remote locations via internet. In specific, agent technology is adopted as a software vehicle to automate demand and supply process in the internet environment. Agents are programs that act on behalf of their human users to perform laborious tasks such as information locating, accessing, filtering, integrating, adapting and resolving inconsistencies. Global competion is forcing the present day industry to produce high quality product more fast and inexpensively. In Korea, most labor-intensive industries have moved to China and other Asian countries for cost reduction. The need for fast information exchange has increased among the remote locations for the cooperation and coordination. In this research, a virtual global purchasing and ordering system will be constructured that distributes production schedule among remote places, acts as a bridge between the headquarters and manufacturing plants, distributes tasks and collates different solutions between demand and supply using agent. The external communication protocol takes HTML format, internal message handling requires SGML for document exchange, and KQML for agent implementation. The expected benefits will be : reduced cost of real-time information exchange, realization of global manufacturing environment, the maximum utilization of internet for the enterprise data exchange.

  • PDF

인터넷을 이용한 글로벌 제조환경의 구축

  • 김태운;김홍배;현재명
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 1997년도 추계학술대회논문집 기업경쟁력 향상을 위한 정보통신 기술의 활용
    • /
    • pp.113-125
    • /
    • 1997
  • The objective of this research is to construct and build a software platform to enable collaboration among enterprise headquarters, product designers, software engineers, manufacturing plants, and suppliers which are located at different remote locations via internet. In specific, agent technology is adopted as a software vehicle to automate demand as a software vehicle to automate demand and supply process in the internet environment. Agents are programs that act an behalf of their human users to perform laborious tasks such as information locating, accessing, filtering, integrating, adapting and resolving inconsistencies. Global competition is forcing the present day industry to produce high quality product more fast and inexpensively. In Korea, most labor-intensive industries have moved to China and other Asian countries for cost reduction. The need for fast information exchange has increased among the remote locations for the cooperation and coordination. In this research, a virtual global manufacturing system will be constructed that distributes production schedule among remote places, acts as a bridge between the headquarters and manufacturing plants, distributes tasks and collates different solutions between demand and supply using agent. The external communication protocol takes HTML format, internal message handling requires SGML for document exchange, and KQML for agent implementation. The expected benefits will be : reduced cost of real-time information exchange, realization of global manufacturing environment, the maximum utilization of internet for the enterprise data exchange.

  • PDF

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권12호
    • /
    • pp.1-15
    • /
    • 2020
  • 본 논문에서는 토목 분야 설계와 시공 단계에서의 기존의 2D 프로세스들을 향후 BIM 방식의 프로세스들로 전환하기 위한 새로운 방법을 제안한다. 먼저, 생애주기 관점의 토공 및 도로 구조물의 BIM 설계와 시공 단계에서의 수량-공정(4D)-공사비(5D) 연계 활용의 전체 프로세스에 대하여 기존 2D 방식의 성과품과 3D BIM 방식의 성과품들의 실적용 과정을 비교 분석한다. 제안하는 방법은 IFC 국제 공통 표준 파일 정보와 CBS/OBS/WBS 표준 분류 체계 정보를 연계하여 설계 단계의 성과품을 만들고 수량-공정(4D)-공사비(5D) 연계 활용 모듈을 활용하여 시공 단계의 성과품을 만든다. 궁극적으로는 제안하는 방법을 사용하여 토목 분야 BIM 설계와 시공의 단계별 기술들을 상용화하고자 한다.