• Title/Summary/Keyword: Integrated management

Search Result 5,816, Processing Time 0.034 seconds

Implementation and Application of Integrated Model for ALT(Accelerated Life Test) (ALT 통합모형의 적용 및 응용)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.153-160
    • /
    • 2008
  • This paper presents the log likelihood function for integrated models for ALT such as exponential-general Eyring, Weibull-temperature and specific heat, lognormal-temperature and specific heat. Additionally this paper estimates the system reliability and mean time to failure(MTTF) for series, parallel, k of n, and standby system using ALT linkage parameter. Lastly this study designs three variable reliability acceptance sampling(RAS) plans such as type I, II censored test, sequential test by the use of integrated models for ALT.

  • PDF

An Integrated Tool Model for the Management of Process and Artifact Management on CBD (컴포넌트 기반 개발에서의 프로세스 관리와 산출물 관리를 통합하는 도구의 모델)

  • Kim Young-Hee;Chong Ki-Won
    • Journal of Internet Computing and Services
    • /
    • v.5 no.4
    • /
    • pp.11-22
    • /
    • 2004
  • Works that improve the process and notify the improved process, the product and the change of tasks to all users are essential in achieving project. Existent project management tools support the definition and the change of project activities, and configuration management tools support version check, workspace management. build management. etc. It costs too much to buy each tool. as well as, it is burdensome to learn usage for various tools. Therefore the web-based integrated tool is proposed to manage the process and artifacts at a time in this paper. The proposed tool defines component based development process model. and achieves recording of process progression, processing the request of change, reporting the progression of each task, product registering and change, version recording, artifact or form search, etc. using ebXML. Furthermore, the stakeholders get the systematic management and standardization by sharing information that are necessary in process achievement and configuration management in distributed environment using the integrated management tool.

  • PDF

A Study on the ANP Application for the Construction of Integrated CEM Model (CEM통합모델 구축을 위한 ANP활용에 관한 연구)

  • Jin, Han-Xin;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.171-184
    • /
    • 2005
  • Today, the usage of DB already becomes an important issue for many companies' survival, especially, for the companies who have adopted CRM(Customer Relationship Management). CEM(Customer Experience Management), as a practical alternative, can settle it. In this paper, we use QFD(Quality Function Deployment) and GA(Genetic Algorithm)-based Group ANP(Analytic Network Process) to construct the Integrated CEM Model to help company decide the priorities of investment in customer experiences.

  • PDF

Intelligent Information Technologies for Integrated Management Systems of Enterprises with A Complex Scheme of Gas-Extraction and Processing

  • Matvienko, Evgeny V.;Adilov, F.T.;Ivanyan, A.I.
    • Journal of Multimedia Information System
    • /
    • v.2 no.3
    • /
    • pp.249-254
    • /
    • 2015
  • This article considers the development of an integrated control and safety management system (ICSS) and its interfaces with an automated enterprise management system (AEMS) in light of the establishment of industrial enterprises with intelligent model of centralized management on the example of Kandym GPP.

2007 Criteria for Malcom Baldridge National Quality Award (MBNQA 2007기준)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.311-317
    • /
    • 2007
  • This study introduces 2007 criteria of Malcom Baldridge National Quality Award (MBNQA) for performance excellence. Baldridge criteria is composed of the seven categories such as leadership, strategic planning, customer and market focus, measurement, analysis, and knowledge management, workforce focus, process management, and results. Moreover this paper proposes various integrated systems with MBNQA.

  • PDF

Design and Implementation of Authority Management for the Integrated Medical Information System in a Hospital Environment (병원환경의 통합의료정보시스템에 적합한 권한관리 설계 및 구현)

  • Cha, Hyo Soung;Chung, Seung Hyun;Ryu, Keun Ho;Hwang, Jeong Hee
    • Convergence Security Journal
    • /
    • v.14 no.5
    • /
    • pp.57-64
    • /
    • 2014
  • Beginning in 2000, domestic large hospital based integrated health information system has been developed from order communication system to electronic medical record system. However, today's advanced medical information system is integrated with unit of the system because user needs is complex and various. And, the problem is authority management of health information system in complex systems of large size hospital. It is also a serious problem of private information exposure because of user's authority management defect. In this paper, we analyze the problems of past hospital information system and propose an efficient and appropriate management authority in operating environment. It also introduces the instances applied into a large hospital EMR system, developing proper authority management to match the characteristics of the integrated medical information system. The proposed system is based on solutions of authority management system suitable for integrated health information system, as well as the next generation of EMR.

A Review of Open Modeling Platform Towards Integrated Water Environmental Management (통합 물환경 관리를 위한 개방형 모델링 플랫폼 고찰)

  • Lee, Sunghack;Shin, Changmin;Lee, Yongseok;Cho, Jaepil
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.6
    • /
    • pp.636-650
    • /
    • 2020
  • A modeling system that can consider the overall water environment and be used to integrate hydrology, water quality, and aquatic ecosystem on a watershed scale is essential to support decision-making in integrated water resources management (IWRM). In adapting imported models for evaluating the unique water environment in Korea, a platform perspective is becoming increasingly important. In this study, a modeling platform is defined as an ecosystem that continuously grows and provides sustainable values through voluntary participation- and interaction-of all stakeholders- not only experts related to model development, but also model users and decision-makers. We assessed the conceptual values provided by the IWRM modeling platform in terms of openness, transparency, scalability, and sustainability. I We also reviewed the technical aspects of functional and spatial integrations in terms of socio-economic factors and user-centered multi-scale climate-forecast information. Based on those conceptual and technical aspects, we evaluated potential modeling platforms such as Source, FREEWAT, Object Modeling System (OMS), OpenMI, Community Surface-Dynamics Modeling System (CSDMS), and HydroShare. Among them, CSDMS most closely approached the values suggested in model development and offered a basic standard for easy integration of existing models using different program languages. HydroShare showed potential for sharing modeling results with the transparency expected by model user-s. Therefore, we believe that can be used as a reference in development of a modeling platform appropriate for managing the unique integrated water environment in Korea.

A Study on Efficient Integrated Kitchen Management of Restaurant (외식업체 통합주방의 효율적인 운영관리에 관한 연구 -통합주방의 중앙공급에 따른 효율화 사례중심으로-)

  • 박종훈;조용범
    • Culinary science and hospitality research
    • /
    • v.9 no.4
    • /
    • pp.54-68
    • /
    • 2003
  • This study aims at efficiency of kitchen management by adoption of a systematic central kitchen and conversion of conventional kitchen to convenience kitchen at ' H ' restaurant. First, integrated menu control of banquet buffet functions became more competitive with quality menu and eventually brought about guests satisfaction. Second, systematic central kitchen made possible standardization and mass production through simplified production line. Efficiency through quick service and shortened preparation time was realized, and food materials were recycled effectively at the same time. Integrated ordering lowered purchasing price and built an efficient cost control system. Third, conversion of conventional kitchen to convenience kitchen and strengthened central kitchen system facilitated agreeable work conditions and optimal work flow with butcher's and even sauce making utensils. Fourth, integrated supply system of buffet menu and sauce from western restaurants saved about 520 million won of labor costs. Last, one integrated kitchen out of two was easier in sanitation control with pleasant restaurant space. Sharing kitchen facilities and equipments also saved about 30% of maintenance fee. Power, water, and gas were also saved and eventually curtailed overall expenses.

  • PDF

A Study on the Integrated Operation of Product Certification and System Authentication (제품 인증과 시스템 인증의 통합운영에 대한 연구)

  • Choi, Weon-Yong;Rhee, Jong-Tae
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.496-506
    • /
    • 2003
  • This study examines the background and necessity of the product certification (KS) and the system authentication (ISO 9000), and their characteristic so as to compare and analyze the possibility of interaction of product certification and system authentication. It tries to suggest an efficient operation system as an integrated management system and analyzes the certification case of K, a manufacturer of kitchen utensils. We believe that the study will help companies minimize their expenses and efforts to establish, operate, and maintain the corporate standard system. In addition, to effectively achieve our goal, we have also made a study of both literature and case and suggested technical guidance to get integrated management system certification. By these methods, we analyzed the effects and problems that come with the introduction and application of the integrated system of product certification and system authentication in order to set up a system to fit to the mechanism of Korean companies. Moreover, we have suggested the model of integrated operation and the benefits that come after acquiring certification.