• Title/Summary/Keyword: Installation site

Search Result 651, Processing Time 0.042 seconds

Analysis on the factors influencing layout for production-installation work of Free-form Concrete Panels in PCM mold (PCM mold 측면에서 FCP 생산-설치 레이아웃 영향요인 분석)

  • Lim, Jeeyoung;Lee, Donghoon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.121-122
    • /
    • 2015
  • The demand on free-form buildings is gradually increasing, but there are several problems such as increased cost and construction duration, and decreased constructability at the construction phase upon construction of a building owing to the difficulty of member production-installation. To solve these problems, a technology to produce FCP using a CNC machine was developed. Basically, it delivers the information on a free-form building designed to the CNC machine, the shapes of RTM and PCM are created using the information delivered and FCP are produced with the RTM and PCM which act as forms. Since the construction duration and project cost are limited on site, the efficiency of FCP production-installation is significant for application of the technology. For it is almost impossible to change the production-installation layout and process once they are set in the construction phase, they should be carefully determined. Before the production-installation layout are established, it is necessary to analyze the factors that influence the duration. Thus, the study intends to analyze influence factors in PCM mold on estimation of the production-installation duration for FCP. According to the analysis of influence factors, a simulation model for estimation of the duration that changes depending on the constraint conditions can be built.

  • PDF

Design and A Safety Analysis and Assessment of a Grounding System according to International Standards (국제 표준(IEC)에 의한 접지 설계 및 이에 대한 안전성 분석·평가)

  • Kim, Doo-Ung;Cho, Man-Hyung;Kim, Han-Soo;Shin, Dae-Sung;Ryu, Ki-Hwan;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.54-59
    • /
    • 2015
  • In this paper, we evaluate safety of grounding system which is designed according to IEC standards. Safety assessment of construction site and grounding system of building is needed before construction for the safety of human in building. Until now, in case of domestic field, design of grounding system is proceeded based on methods which are proposed in IEEE Std. 80. In other words, it is not in the situation that grounding system is designed based on IEC standards. Therefore, we propose a method which designs grounding system and evaluates safety of it according to IEC standards. We measure ground resistance of construction site using measuring equipment of ground resistance. Using this value, soil structure and ground resistivity are obtained through program analysis. CDEGS program of SES company is used for simulation analysis.

Power Curve of a Wind Generator Suitable for a Low Wind Speed Site to Achieve a High Capacity Factor

  • Yoon, Gihwan;Lee, Hyewon;Lee, Sang Ho;Hur, Don;Cheol, Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.820-826
    • /
    • 2014
  • It is well known that energy generated by a wind generator (WG) depends on the wind resources at the installation site. In other words, a WG installed in a high wind speed area can produce more energy than that in a low wind speed area. However, a WG installed at a low wind site can produce a similar amount of energy to that produced by a WG installed at a high wind site if the WG is designed with a rated wind speed corresponding to the mean wind speed of the site. In this paper, we investigated the power curve of a WG suitable for Korea's southwestern coast with a low mean wind speed to achieve a high capacity factor (CF). We collected the power curves of the 11 WGs of the 6 WG manufacturers. The probability density function of the wind speed on Korea's southwestern coast was modeled using the Weibull distribution. The annual energy production by the WG was calculated and then the CFs of all of the WGs were estimated and compared. The results indicated that the WG installed on the Korea's southwestern coast could obtain a CF higher than 40 % if it was designed with the lower rated speed corresponding to the mean wind speed at the installation site.

Wind Resource Assessment of the Antarctic King Sejong Station by Computational Flow Analysis (남극 세종기지의 전산유동해석에 의한 풍력자원평가)

  • Kim, Seok-Woo;Kim, Hyun-Goo
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.3
    • /
    • pp.29-35
    • /
    • 2007
  • In accordance with Madrid and Kyoto Protocols, a 10kw wind turbine installed about 625m away from the King Sejong Station in the Antarctica has been in operation successfully. The current location of the wind turbine has different geographic surroundings from the previous candidate site considered in 2005 and that makes re-evaluation of wind resource at the current site including geographic effects necessary. Especially, strong wind flow derived by steep and complex terrain is dominant in the Antarctica so that computational flow analysis is required. The wind rose measured at the previous and current installation location are identical with strong meteorological correlation but prevailing directions of wind power density are different because of local wind acceleration due to complex terrain. Numerical analysis explains which effects brings this discordance between the two sites, and a design guideline required for additional wind turbine installation has been secured.

Introduction to 1M telescope of Deokheung Optical Astronomy Observatory, National Youth Science Center (NYSC)

  • Kang, Wonseok;Lee, Sang-Gak;Kwon, Sun-Gill
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.40 no.1
    • /
    • pp.86.4-87
    • /
    • 2015
  • We will soon complete the installation of 1m telescope at Deokheung Optical Astronomy Observatory (DOAO), National Youth Space Center (NYSC). Before the test observation with NYSC 1m telescope, we present the specs of the 1M telescope and observational conditions of the DOAO site, such as the seeing data at DOAO and the atmospheric extinction coefficients obtained from the observations of standard stars and stellar clusters with 120mm and 150mm refractor in 2014. Since atmospheric extinction coefficients depend on the observational instruments as well as the atmospheric conditions of the site, the improved data with NYSC 1m telescope will be obtained right after the completion of 1M telescope installation. We are planning to invite all astronomers to use 1m telescope for their sciences via regular proposal processes in this year.

  • PDF

Model Parameter Determination of Industrial Co-generator Model Parameters through Filed Measurement (현장 계측을 통한 산업용 열병합 발전설비 모델 파라미터 결정)

  • Kim, Hak-Man
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.10
    • /
    • pp.159-165
    • /
    • 2007
  • This paper presents a method for the derivation of model parameters of a co-generation system using data measured through on-site generator characteristic testing and validates its model parameters. Dynamic models such as generator, excitation system, and turbine/governor are mainly dealt in this paper. For the purpose of validation of derived model parameters, the measured results are compared with simulation results. The comparisons between measured results and simulation results show good match.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전기분야감리제도의 운영실태 및 개선방안에 관한 연구)

  • 고선환;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.147-150
    • /
    • 2002
  • Domestic electrical construction inspection system was introduced into building site in 1963 by registered architects' law, meanwhile, inspector appointed by ministry of owners lake charge of Government managing building site. Afterwards several systems has been adopted to heal some problems each of them has revealed. These times Government granted authority for inspection on surveillancer, furthermore, formulate a supervising system which articulate the responsibilities of supervision and put it in effect as of 1st, January, 1994. This supervision system gets rid of factors causing faulty work to a considerable extent. However, as it is still in early stage, the system has various problems to overcome, For example, actual state of handling modifications of design in accordance with supervision system in field shows a difference between process provided by law and field process. Thus this study inquire and analyze actual condition of supervision system, at the same time, problems occuring in modifications of design under supervision, and then propose a way to improve it

  • PDF

A Study on Phosphor Synthetic and Low Temperature Photoluminescence Spectrum (저온 photoluminescence 스펙트럼 및 형광체 합성에 관한 연구)

  • Kim, Soo-Yong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.4
    • /
    • pp.10-16
    • /
    • 2010
  • In this paper, synthesis here Mn add to Ar injection the state and a vacuum an atomosphere $ZnGa_2O_4$ : Mn, ZnO and $Ga_2O_3$ power of 1 : 1 mole ratio mixture. Manufacture a close examination of oxygen a component variation luminescence a specific character reach an in fluence of $ZnGa_2O_4$ : Mn, luminescence spectrum observation also an explanation of Mn site symmetry and at luminescence spectrum reach an influence from low temperature photoluminescence spectrum.

Wind Resource Assessment of the Antarctic King Sejong Station by Computational Flow Analysis (남극 세종기지의 전산유동해석에 의한 풍력자원평가)

  • Kim, Seok-Woo;Kim, Hyun-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.376-377
    • /
    • 2007
  • In accordance with Madrid and Kyoto Protocols, a 10kW wind turbine installed about 625m away from the King Sejong Station in the Antarctica has been in operation successfully. The current location of the wind turbine has different geographic surroundings from the previous candidate site considered in 2005 and that makes re-evaluation of wind resource at the current site including geographic effects necessary. Especially, strong wind flow derived by steep and complex terrain is dominant in the Antarctica so that computational flow analysis is required. The wind rose measured at the previous and current installation location are identical with strong meteorological correlation but prevailing directions of wind power density are different because of local wind acceleration due to complex terrain. Numerical analysis explains which effects brings this discordance between the two sites, and a design guideline required for additional wind turbine installation has been secured.

  • PDF

On-site Survey of the Street Lighting Facilities (가로등의 전기설비 현장실태조사)

  • Kim, Han-Sang;Bae, Suk-Myong;Kim, Chong-Min
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.426-431
    • /
    • 2006
  • The case where a drain cannot flow backwards, a sewer institution can be unmanageable in this, and a mad is under water momentarily by local heavy nin by the climate phenomenon in spite of not being a lowlands belt has occurred well more than recently. By the flooded mea since it is in the state which has some human bodies at hand, when a short circuit occurs in street lighting pole which is the electric institution thing of a road, the danger of an electric shock accident becomes higher. In this paper, it was going to show improvement plan for grasping the brittle factor of street lighting pole electricity facilities through the on-site survey of street lighting pole electricity facilities, and improving this.

  • PDF