Power Curve of a Wind Generator Suitable for a Low Wind Speed Site to Achieve a High Capacity Factor |
Yoon, Gihwan
(Dept. of Electrical Engineering and WeGAT Research Center, Chonbuk National University)
Lee, Hyewon (Dept. of Electrical Engineering and WeGAT Research Center, Chonbuk National University) Lee, Sang Ho (Korea Electrotechnology Research Institute) Hur, Don (Dept. of Electrical Engineering, Kwangwoon University) Cheol, Yong (Dept. of Electrical Engineering, WeGAT Research Center, and Smart Grid Research Center, Chonbuk National University) |
1 | New & Renewable energy white paper 2012, Korea New and Renewable Energy Center, Jan. 2013. |
2 | Yearbook of Energy Statistics 2012, Korea energy economics institute, Dec. 2013. |
3 | The 6th basic plan of electricity supply and demand, Ministry of Knowledge Economy, Feb. 2013. |
4 | Global wind report: annual market update 2012, Global Wind Energy Council, Apr. 2013. |
5 | B. S. Hwang and Y. Y. Nam, "Status of Korea and World Wind Energy Wind Industry", Korea Society of Fluid Power & Construction Equipment, vol. 8, no. 1, pp. 33-39, March 2011. 과학기술학회마을 |
6 | The Ministry of Knowledge Economy (MKE) report, "Master plan for 2.5GW Offshore Project", Nov. 2010. |
7 | Wind turbines-part 1: design requirements, IEC 61400-1, 2005. |
8 | M. E. Lee, G. W. Kim, S. T. Jeong, D. H. Ko, and K. S. Kang, "Assessment of offshore wind energy at Younggwang in Korea", Renewable and Sustainable Energy Reviews, vol. 21, pp. 131-141, May 2013. DOI ScienceOn |
9 | S. H. Jangamshetti and V. G. Rau, "Site matching of wind turbine generators: A case study," IEEE Trans. Energy Conversion, vol. 14, no. 4, pp. 1537-1543, Dec. 1999. DOI ScienceOn |
10 | W. Yichun and D. Ming, "Optimal Choice of Wind Turbine Generator Based on Monte-Carlo Method", DRPT 2008, April 2008. |
11 | J. K. Woo, B. M. Kim, I. S. Paek, N. S. Yoo, and Y. S. Nam, "Investigation on selecting optimal wind turbines in the capacity factor point of view", Journal of the Korean solar energy society, vol. 31, no. 5, pp. 60-66, Oct. 2011. 과학기술학회마을 DOI ScienceOn |
12 | T. Ackermann, Wind Power in Power System, 2nd Edition, England, John Wiley & Sons, Ltd, 2012. |
13 | United power, UP77 and UP82. [online]. Available: http://www.gdupc.com.cn/english/tabid/386/SourceId/1058/InfoID/827/language/zh-CN/Default.aspx |
14 | REpower Systems, MM100. [online]. Available: http://www.repower.de/wind-power-solutions/windturbines/mm100/ |
15 | Siemens Energy, SWT-3.6-107. [online]. Available: http://www.energy.siemens.com/mx/en/renewableenergy/wind-power/wind-turbines/swt-3-6-107.htm |
16 | Vestas, V112 3.0MW. [online]. Available: http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v112-3.0-mw-offshore.aspx#/vestas-univers |
17 | SUZLON, S9X. [online]. Available:http://www.suzlon.com/products/l3.aspx?l1=2&l2=44&l3=128 |
18 | Vestas, V164 8.0MW. [online]. Available: http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v164-8.0-mw-offshore.aspx#/vestas-univers |
19 | REpower Systems, 5M. [online]. Available: http://www.repower.de/wind-power-solutions/windturbines/5m/ |
20 | REpower Systems, 6M. [online]. Available: http://www.repower.de/wind-power-solutions/windturbines/6m/ |
21 | ENERCON, ENERCON product overview. [online]. Available: http://www.enercon.de/en-en/88.htm |
![]() |