• Title/Summary/Keyword: Installation priority

Search Result 87, Processing Time 0.035 seconds

Analysis of Bus Signal Priority Effect by BRT Stop Types: Focusing on Hannuri-daero, Sejong (BRT 정류장 형태에 따른 버스 우선 신호 효과 분석: 세종시 한누리대로를 중심으로)

  • Kim, Minji;Han, Yohee;Kim, Youngchan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.3
    • /
    • pp.20-33
    • /
    • 2021
  • Modern society is steadily implementing policies to encourage public transportation to cope with the growing traffic demand on limited roads. The expectation is rising for transit signal priority to ensure the speed of buses as the installation of the bus rapid transit(BRT) expands nationwide to secure the competitiveness of buses. On the other hand, the form of BRT stops without considering some aspects of bus operation may increase the number of stops on the bus, thereby reducing the effectiveness of bus signal priority applications. This study suggests the type of bus stop to increase the operation efficiency of buses by analyzing the bus signal priority effect according to the BRT station type using Hannuri-daero, Sejong. The bus signal priority is used to maximize the two-way bandwidth of passenger cars and buses. As a result of the application, the effectiveness of the bus signal priority at the stop causing the double stop of the bus was reduced drastically, and the efficiency of the bus signal priority was increased significantly after improvement. These results are expected to be used as basic data in the form of proper bus stops considering the aspects of traffic operation when designing BRT stops in new towns in the future.

Analysis of runoff reduction performance of permeable pavement and rain barrel in Mokgam stream basin and determination of installation priorities (목감천 유역 내 투수성포장과 빗물저류조의 유출량 저감 성능 분석 및 설치 우선 순위 결정)

  • Chae, Seung-Tak;Chung, Eun-Sung;Park, Inhwan
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.12
    • /
    • pp.905-918
    • /
    • 2023
  • This study aimed to assess runoff reduction performance and determine installation priorities for Permeable Pavement (PP) and Rain Barrel (RB) within the Mokgam Stream basin. Optimal design parameters were determined to maximize the effectiveness of PP and RB in reducing runoff. Furthermore, the optimal parameters were incorporated to compare the runoff reduction performance of PP and RB. Analysis of the runoff curve at the basin outlet indicated that PP demonstrated superior performance in reducing runoff during the rising limb of the curve. At the same time, RB excelled within the falling limb. Comparisons of total runoff and peak runoff reduction by sub-catchment revealed that in larger sub-catchment areas, PP outperformed RB in runoff reduction. In contrast, RB exhibited higher performance in areas with a higher impervious ratio. Based on the evaluation of runoff reduction performance for PP and RB, installation priorities were determined within the Mokgam Stream basin. The results showed that PP and RB installations were prioritized for sub-catchments with larger areas and a higher impervious ratio. Furthermore, the correlation between the ranking of runoff reduction performance and sub-catchment characteristics showed a high correlation with both the impervious area ratio and sub-catchment geometrical properties in sub-watersheds exhibiting the top 25% runoff reduction performance. These results emphasize that when determining the priority for installing LID facilities in developed urban areas, it is necessary to consider not only the impervious area ratio but also the geometrical properties of the sub-catchment.

Localization of solar-hydrogen power plants in the province of Kerman, Iran

  • Mostafaeipour, Ali;Sedaghat, Ahmad;Qolipour, Mojtaba;Rezaei, Mostafa;Arabnia, Hamid R.;Saidi-Mehrabad, Mohammad;Shamshirband, Shahaboddin;Alavi, Omid
    • Advances in Energy Research
    • /
    • v.5 no.2
    • /
    • pp.179-205
    • /
    • 2017
  • This research presents an in-depth analysis of location planning of the solar-hydrogen power plants for electricity production in different cities situated in Kerman province of Iran. Ten cities were analyzed in order to select the most suitable location for the construction of a solar-hydrogen power plant utilizing photovoltaic panels. Data envelopment analysis (DEA) methodology was applied to prioritize cities for installing the solar-hydrogen power plant so that one candidate location was selected for each city. Different criteria including population, distance to main road, flood risk, wind speed, sunshine hours, air temperature, humidity, horizontal solar irradiation, dust, and land costare used for the analysis. From the analysis, it is found that among the candidates' cities, the site of Lalezar is ranked as the first priority for the solar-hydrogen system development. A measure of validity is obtained when results of the DEA method are compared with the results of the technique for ordering preference by similarity to ideal solution (TOPSIS). Applying TOPSIS model, it was found that city of Lalezar ranked first, and Rafsanjan gained last priority for installing the solar-hydrogen power plants. Cities of Baft, Sirjan, Kerman, Shahrbabak, Kahnouj, Shahdad, Bam, and Jiroft ranked second to ninth, respectively. The validity of the DEA model is compared with the results of TOPSIS and it is demonstrated that the two methods produced similar results. The solar-hydrogen power plant is considered for installation in the city of Lalezar. It is demonstrated that installation of the proposed solar-hydrogen system in Lalezar can lead to yearly yield of 129 ton-H2 which covers 4.3% of total annual energy demands of the city.

A study on the construction of the planning process Green Stormwater Infrastructure (GSI) in the public building in Gyeongsangnam-do (경상남도 공공청사형 그린빗물인프라(GSI) 조성 체계 구축)

  • Lee, Hyojung;Shin, Hyunsuk
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.4
    • /
    • pp.301-310
    • /
    • 2023
  • Since 2013, the Ministry of Environment has been promoting the 'Green Stormwater Infrastructure (GSI) application project', a small-scale distributed stormwater management method, and supporting installation costs. So, the number of local governments that want to apply for 'GSI applied projects' is increasing every year. However, with the exception of Seoul, which introduced the 「Low Impact Development Prior Consultation System」, each local government has difficulties because there is no guideline or implement systems. Therefore, in this study, the application scope and priority setting of public buildings in Gyeongsangnam-do, the review of the GSI application effect in the pilot study area, and the establishment of an integrated implement system will be proposed as a result of the study.

A Study on the Call Admission Control with Overflow and Preemption at Adaptive Moving Boundary in Cellular Mobile Communications (셀룰러 이동통신망의 적응성 가변경계에서 Overflow와 Preemption을 갖는 호 접속제어 방안 연구)

  • 노희정
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.4
    • /
    • pp.171-180
    • /
    • 2004
  • CDP(handoff Call Dropping Probability) and CBP(new Call Blocking Probability) have been used as two important call level QoS parameters in cellular mobile communications. But, many methods to reduce CDP without considering CBP have been studied, and hand-off call priority scheme has been introduced. But the use of hand-off call priority scheme increases CBP and decreases channel utilization rate depending on the number of reserved channel for priority. In this paper, we propose a CAC(Call Admission Control) algorithm with overflow and preemption to solve the problem caused by considering CDP and CBP in calculation of the number of channel reserved. The problem is the increase of CDP as the traffic load increases. In our CAC algorithm, hand-off call is permitted to use(overflow) unreserved and unused channel if there is no reserved and unused channel, and new call is permitted to use(preemption) the channel overflowed by hand-off call if there is no unreserved and unused channel. This mechanism of calculation of the number of reserved channel and CAC algorithm is expected to increase channel utilization rate, and can be applied to media-based QoS provision in cellular mobile communications.

Direction To Propel Efficient National Highway ITS According to Public and Private Traffic Information Sharing (공공 및 민간 교통정보 공유에 따른 효율적인 국도 ITS 추진방향)

  • Yoon, Young-Min
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.10
    • /
    • pp.526-534
    • /
    • 2022
  • In August 2014, the Ministry of Land, Infrastructure, and Transport (MOLIT) devised an innovative ITS measure in which private and public sectors share roles to maximize investment efficiency and effectiveness in collecting and offering traffic information that had been separately implemented by the state and private sector. The main details of the innovative measure include the following: For communication information, the information collected by the private sector is used, and the state concentrates on safety-related information collection, such as unexpected situations, including construction, accidents, and deteriorating weather conditions. Consequently, safety-related information is offered in real-time through smartphones and navigation, in addition to electric road signs that have limitations in providing unexpected real-time situations due to installation at specific spots. This study presented a connected traffic information priority coordination plan to improve the accuracy of traffic information offering by analyzing problems of related traffic information, including a general national highway case study to enhance the efficiency of national highway ITS implementation, according to actual public-private traffic information sharing. In addition, this study reviewed whether to operate or demolish the information collection equipment by analyzing traffic volume level and availability of related traffic information in the existing ITS operation sections and presented ITS collection equipment installation judgment standards based on the cases concerned.

A Study on the Prioritization of Sectional Switchgear Replacement for Intelligent Distribution Automation in Distribution System (배전지능화 시스템을 위한 배전계통 구분개폐기 교체 우선순위 결정에 관한 연구)

  • Sung, In-Je;Chai, Hui-Seok;Moon, Jong-Fil;Seo, In-Yong;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.51-58
    • /
    • 2015
  • Intelligent distribution automation system includes operating a switchgear of distribution system remotely when switchgear are not available to operate quickly. This system makes it possible to reduce the interrupt time. It also aims to improve the reliability of customers. Currently, Intelligent distribution automation improves the reliability by replacing manual switchgear, which is installed as sectional switchgear. However the prioritization of the replacement for the switchgear is required for its intellectualization. Many studies have been conducted related with prioritization of switchgear replacement. But it is difficult to interpret and apply to the power distribution system. That is because most of the studies just considers customer numbers for prioritizing the replacement. In this paper presents an algorithm to determine the intelligent swichgear replacement priority considering customer number, load quantity and interruption cost. Further, this algorithm is verified by using system reliability index.

Reliability of Distribution System Divided into Community Energy Systems (구역전기사업자로 분리된 배전계통의 신뢰도 평가)

  • Bae, In-Su;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.1
    • /
    • pp.85-90
    • /
    • 2010
  • This paper presents a technique to evaluate the reliability of customers in Community Energy System(CES). Operators of the CES are responsible for a reliable energy supply to their customers. Due to the strategy of the priority on their customers, the restoration process of DGs should be reordered when system outage happens. The previous study has proposed the technique in the distribution system in which one operator owns all DGs. Case studies in Bus 2 of Roy Billinton Test System(RBTS) verify that the accuracy of the proposed technique is comparable to that of previous technique, and the distribution system divided into several CESs changes the reliability index of customers in the CESs.

A Study of Luminous Environment for Standard Illuminance in Residential Areas (주거공간의 실내공간별 조도기준을 위한 빛환경 연구)

  • Lee, Jung-Eun;Choi, An-Seop
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.3
    • /
    • pp.1-9
    • /
    • 2005
  • Light is an important environmental element for people to live and do creative activities in residential areas. Especially, people are used to live under artificial light in artificial interior surroundings for the most times. Currently, the lighting quality of residential areas has been improved, but it still does not reach to the recommended level because the luminous environment of present residential areas is only based on the life behavior which puts its priority to clear vision. Therefore, it is necessary that proper standard illumination must be used for various uses and purposes. From this point of view, this paper investigated the essence of light in residential areas, and the luminous environment for apartments was measured This paper finally established well-coordinated standard illuminance, derived from the measurement and analysis of luminous environment from these cases.

The Development of Multi-Fault Restoration Algorithm for Distribution Network (배전계통 광역 정전복구 알고리즘 개발)

  • Jung, Jin-Soo;Lee, Seung-Jae;Jung, Jong-Wook;Lim, Young-Bae;Bae, Seok-Myung;Yi, Geon-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.3
    • /
    • pp.69-77
    • /
    • 2006
  • This paper presents the service restoration in electric power distribution systems. The aim of the service restoration is to control an emergency taken place in distribution systems and to restore out-of service areas as soon as possible when a fault occurs in distribution systems. For this reason, new service restoration strategies in multi-outage area are suggested in this paper. The suggested algorithm consist of two schemes. One is an individual restoration scheme, the other is an integrated restoration scheme. The former determines a restoration order of outage areas based on a restoration index. Unless the former scheme can generate a feasible restoration plan, the latter one will try to find out a new configuration without an overloaded section through tie exchange method.