1 |
Roger P. R., Elena S. P. and William R. M.(2011), Traffic Engineering Fourth Edition, p.636.
|
2 |
Smith H. R., Hemily B., Ivanovic M. and Fleming G.(2005), Transit Signal Priority (TSP): A Planning and Implementation Handbook, ITS America, p.7.
|
3 |
Dai G., Wang H. and Wang W.(2016), "Signal Optimization and Coordination for Bus Progression Based on MAXBAND," KSCE Journal of Civil Engineering, vol. 20, no. 2, pp.890-898.
DOI
|
4 |
Gartner N. H., Assmann S., Lasaga F. and Hou D.(1991), "A Multiband Approach to Arterial Traffic Signal Optimization," Transportation Research 25B, pp.55-74.
|
5 |
Kim H., Cheng Y. and Chang G. L.(2019), "Variable Signal Progression Bands for Transit Vehicles Under Dwell Time Uncertainty and Traffic Queues," IEEE Transactions on Intelligent Transportation Systems, vol. 20, no. 1, pp.109-122.
DOI
|
6 |
Kim M., Han Y. and Kim Y.(2021), "Developing Methodology for Maximizing Two-way Bandwidth of Bus Stop Units Using MAXBAND LP2 Model," The 84th Conference of Korean Society of Transportation, p.31.
|
7 |
Zhang C., Xie Y., Gartner N. H., Stamatiadis C. and Arsava T.(2015), "AM-Band: An Asymmetrical Multi-Band Model for Arterial Traffic Signal Coordination," Transportation Research Part C, vol. 58, pp.515-531.
DOI
|
8 |
Hu J., Park B. B. and Lee Y. J.(2015), "Coordinated transit signal priority supporting transit progression under Connected Vehicle Technology," Transportation Research Part C: Emerging Technologies, vol. 55, pp.393-408.
DOI
|
9 |
Little J., Kelson M. and Gartner N. H.(1981), "MAXBAND: A Versatile Program for Setting Signals on Arteries and Triangular Networks," Transportation Research Record, vol. 795, pp.40-46.
|
10 |
Garrow M. and Machemehl R.(1999), "Development and Evaluation of Transit Signal Priority Strategies," Journal of Public Transportation, vol. 2, no. 2, pp.65-90.
DOI
|
11 |
Demetsky M. J. and Lin B.(1982), "Bus Stop Location and Design," Transportation Engineering Journal of ASCE, vol. 108, no. 4, pp.313-327.
DOI
|
12 |
Ministry of Construction & Transportation(2005), Bus Rapid Transit Manual, p.1.
|
13 |
Bae S. I., Lee K. B. and Jeon S. H.(2008), Technical Bulletin No. 15, Yooshin, pp.348-349.
|
14 |
Bai Y., Li J., Li T., Yang L. and Lyu C.(2018), "Traffic Signal Coordination for Tramlines with Passive Priority Strategy," Hindawi Mathematical Problems in Engineering, vol. 2018, pp.1-14.
|
15 |
Jeong Y. and Kim Y.(2014), "Tram Passive Signal Priority Strategy based on the MAXBAND Model," KSCE Journal of Civil Engineering, vol. 18, no. 5, pp.1518-1527.
DOI
|
16 |
Kim W. and Rilett L.(2005), "Improved Transit Signal Priority System for Networks with Nearside Bus Stops," Transportation Research Record: Journal of the Transportation Research Board, vol. 1925, no. 1, pp.205-214.
DOI
|
17 |
Ministry of Construction & Transportation(2010), Bus Rapid Transit(BRT) Design Guidelines, p.86.
|
18 |
Wang R., Seo M., Nakamura F., Okamura T. and Tanaka S.(2013), "A Performance Evaluation of Bus Stop Placements near a Signalized Intersection by a Microscopic Traffic Simulation," Journal of the Eastern Asia Society for Transportation Studies, vol. 10, pp.1270-1280.
|