• Title/Summary/Keyword: Installation Cost

Search Result 1,175, Processing Time 0.03 seconds

Analysis of Factors Increasing Construction Cost for the Curtain-wall Accompanied by the Installation of a Guide Rail for High-rise Building Maintenance (초고층 외벽 유지관리용 Guide Rail 설치에 따른 커튼월 공사비 증가요인 분석)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.97-98
    • /
    • 2011
  • The number of high-rise buildings has increased year after year, with there currently being 5 projects in progress to construct buildings higher than 100 stories in Seoul alone. The construction cost for such high-rise buildings is significantly higher than the cost for a conventional low-rise building, while maintenance costs are expected to be two to three times higher. To reduce the maintenance cost of a high-rise building, there is the need for a guide rail to be used for maintenance, which is why there is the need for research on the guide rail system. For this reason, as preliminary research to develop a guide rail, this study aims to derive the factors increasing construction cost by taking the installation of a guide rail into account. This is expected to lay the groundwork for the design and construction of guide rails for high-rise building maintenance.

  • PDF

Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost (분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정)

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Lee, Woo-Ri;Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

A Cost-Benefit Analysis for the Installation of Piezoelectric Energy Harvester (압전에너지 하베스터 설치사업의 경제성 분석에 관한 연구)

  • Lee, Hyun-Kyung;Lee, Min-Gi;Kim, Hong-Bae
    • Journal of the Korean Regional Science Association
    • /
    • v.33 no.3
    • /
    • pp.49-59
    • /
    • 2017
  • The piezoelectric energy harvester is recently being developed and catching on as a way to achieve low carbon green growth. The practical application of the piezoelectric energy harvester is expected to contribute not only to the reduction of greenhouse gas emissions but also to the improvement of residents' welfare. This paper conducted a cost-benefit analysis for the installation of piezoelectric energy harvester on the highway focusing on its impacts on the public. The results showed that the installation of piezoelectric energy harvester on the gyeongbu highway is economically feasible in that it could increase the social welfare for the residents. Finally, this paper suggests policy direction for the practical use of the piezoelectric energy harvester, based on the results obtained.

The Economics Evaluation of Lighting System Considering Maintenance Factor (보수율을 고려한 조명시스템의 경제성 평가)

  • Sim, Sang-Man;Kim, Gi-Hoon;Hwang, Nam-keuk;Kim, Hoon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.5
    • /
    • pp.1-7
    • /
    • 2001
  • Factors which affect largely the economics of lighting system, are initial installation costs, maintenance costs, energy costs as so on. In these costs, maintenance cost, lamp replacement labor cost, luminaire cleaning cost et al. so the economics of lighting system are evaluated different by maintenance planning. It is important to evaluate which lighting system would be economically advantageous in a initial design. In this study, the importance of maintenance factor is verified by the evaluations of the economics of lighting systems while maintenance factor is varied composition factors in ZCM which is used to calculate the average illuminance.

  • PDF

The Most Suitable Plan of Automatic Domestic Solid Waste Collection System for Land Development Area (택지개발지구의 쓰레기자동집하시설 최적규모 연구)

  • Lee, Joon-Young
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.1
    • /
    • pp.28-34
    • /
    • 2009
  • The objective of this study was to draw the most suitable plan of an automatic domestic solid waste collection system for land development area. The results of this study indicated that the most suitable plan is identified as a land development area larger than 3,600,000 $m^2$ located in the metropolitan area with an incinerator system (or MBT). There are the cases smaller than the standard area but this may cause additional allotment from the residents. According to a rating method to compute the size of the most suitable plan, installation of an automatic clean network has to be minimized if the rated score is below 2.0. On the other hand, the installation is required if the rated score is above 2.5. For a certain circumstance, a cautious decision has to be made for installation of the automatic domestic solid waste collection system by considering the influence of the initial cost, sale price, residential allotment, and maintenance cost on the land development.

Feasibility Study on Installation of Individual Room Control Ventilation in Apartment House (공동주택의 실별 제어환기 도입 타당성 분석)

  • Kim, Jung-Yup;Shin, Hyun-Joon;Kwon, Yong-Il;Yun, Young-Woo;Cho, Chun-Sik
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.502-507
    • /
    • 2009
  • Trend of mechanical ventilation system applied to apartment house is introduced and feasibility study on installation of the individual room control ventilation as energy-saving method is carried out through field experiment. While initial cost of installation for the individual room control ventilation increases, the running cost is lower than the individual household control ventilation due to automatic flow rate control and reduction of fan power, and the management cost also decreases due to extension of use life of components. As the results of field experiment on $115m^2$-type apartment house, the individual room control ventilation could save the amount of 1,459.5Wh/day when compared with the individual room control ventilation

  • PDF

Dynamic Performance Comparison of Various Combination of Reactive Power Compensators (조상설비 조합에 따른 정태적 특성 및 동태적 특성 비교)

  • Jang Gilsoo;Lee Byongjun;Kwon Sae-hyuk;Kang Sanggyun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.4
    • /
    • pp.159-164
    • /
    • 2005
  • Various compensators are installed into the power system to operate the system economically and stably by maximizing the availability of utilities and power transmission capability. Fixed Capacitor(FC), Mechanical Switched Capacitor(MSC), and FACTS(Flexible AC Transmission Systems) are used to regulate voltage and power flow of the system. When a disturbance occurs in the power system, the Fixed Capacitor operates dependently on the voltage of the power system and cannot change the amount of installation automatically. But compared to other equipment, the Fixed Capacitor is more economical due to its low cost. Since MSC can change the amount of installation according to the state of the power system, operates more effectively than the Fixed Capacitor. FACTS have fast dynamic performance for the transient condition, but the cost is high. Therefore, it is needed to develop an optimized installation planning for the reactive power compensators by considering their dynamic performance and cost. In this paper, an optimized compensator combination and the proposed scheme is proposed and it is applied to KEPCO system in order to show its capabilities.

Automatic measurement of a Isolux diagram (등조도 곡선의 자동화 측정)

  • 권영혜;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1989.10a
    • /
    • pp.31-36
    • /
    • 1989
  • Low-cost and automated isolux diagram measurement system are investigated. The system is constructed with illuminance measurement array, analog multiplexer, A/D converter and 16-bit microcomputer. The experimental results show good agreement with the measured illuminance values. Decreasing the measure-spacing, the more accurate diagram can be obtained.

  • PDF

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

The Economic Analysis of IEC61850 for Substation Automation (IEC61850 변전자동화의 경제성분석)

  • Lee, Kyung-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.255-258
    • /
    • 2009
  • This paper gives a feasibility reference of integrating power automation for digital substation. An overview and techno-economical potential of IEC61850 are introduced. The result of economic analysis is shown to save up to one-third of the total cost of automation installation. The gained benefits can be used to increase the economy and reliability of electrical power system.

  • PDF