• 제목/요약/키워드: Information breakdown structure

검색결과 188건 처리시간 0.031초

Exploratory Study on BIM-based Information Breakdown Structure for Construction Document Management

  • Lee, Dong Gun;Cha, Hee Sung
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.32-39
    • /
    • 2015
  • Construction industry is an aggregate of information that diverse information is integrated and controlled. To implement successful construction projects, it can be said that the information management is very important. In particular, because information of construction sites is controlled in a form of documents, importance of the document management in construction has been increased. But, by controlling information through documents, there are difficult problems in writing and classification of the documents and preservation and utilization of the information. Also, due to incompletion of the information management system, difficulty in systematic info management arises. For this reason, this study intends to suggest the document information breakdown structure for controlling document info efficiently which is generated at construction sites. For this, through the examination of preceding studies, establishment of the concept of the document info breakdown structure, the space breakdown structure, and the info breakdown structure, availability of document information is intended to heighten.

학교시설물 유지관리를 위한 공사 분류 체계 분석 (Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

게이트가 파인 구조를 이용한 SOI MOSFET에서의 항복전압 개선 (Breakdown Voltage Improvement in SOI MOSFET Using Gate-Recessed Structure)

  • 최진혁;박영준;민홍식
    • 전자공학회논문지A
    • /
    • 제32A권12호
    • /
    • pp.159-165
    • /
    • 1995
  • A gate-recessed structure is introduced to SOI MOSFET's in order to increase the source-to-drain breakdown voltage. A significant increase in the breakdown voltage is observed compared with that of a planar single source/drain SOI MOSFET without inducing the appreciable reduction of the current drivability. We have analyzed the origin of the breakdown voltage improvement by the substrate current measurements and 2-D device simulations, and shown that the breakdown voltage improvement is caused by the reductions in the impact ionization rate and the parasitic bipolar current gain.

  • PDF

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

공동주택에서의 건설정보통합을 위한 실무형 부위별 분류체계 구축에 관한 연구 (The Modeling of the Element Breakdown Structure(EBS) Applicable to Construction Fields for the Integration of the Construction Information in Apartment)

  • 송혁;류성룡;이한민;정환욱;임종성;고성석
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.98-105
    • /
    • 2000
  • The drawing information takes the most essential part of construction information. The management of construction information through drawing information facilitates input, output and search process, thus helping maximize the usage of construction information by effectively sharing construction experience and drawing information. This paper shows how construction information can effectively used to increase the productivity of the construction process as a whole. Construction information was extracted and classified by the elements of building which are the basic and very end components of building, to accumulate information of each construction phase. Based on the result, the Element Breakdown Structure(EBS) was developed for the practical usage of construction information integration.

  • PDF

현장 관리자 중심의 건축공사 가설기술 표준분류체계구축 (Development of Standard Breakdown Structure of Temporary Construction Technique in Building Construction focused on Site Manager)

  • 김민정;박준모;김옥규;최병주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2012
  • This study has been reorganizing a standard breakdown structure of temporary technique focused on construction site. For this, first of all we, the authors, reviewed features and present statuss of construction temporary technique, and could develop to the standard breakdown structure through studying a construction site and researching a delphi method. By using the standard breakdown structure obtained from this study, it is expected that the application of to information of construction business and plan to a schedule and a work.

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

게이트 필드플레이트 구조 최적화를 통한 AlGaN/GaN HEMT 의 항복전압 특성 향상 (Improving The Breakdown Characteristics of AlGaN/GaN HEMT by Optimizing The Gate Field Plate Structure)

  • 손성훈;김태근
    • 대한전자공학회논문지SD
    • /
    • 제48권5호
    • /
    • pp.1-5
    • /
    • 2011
  • 본 논문에서는 AlGaN/GaN HEMT의 항복 전압 특성 향상을 위해 2차원 소자 시뮬레이터를 통하여 게이트 필드 플레이트 구조를 최적화하였다. 필드플레이트 길이, 절연체 종류, 절연체 두께 변화 등의 세가지 변수를 이용하여 시뮬레이션을 진행하였으며 그에 따른 전기장 분포의 변화와 항복전압 특성을 확인하였다. 필드플레이트 구조를 최적화 시킴으로서 게이트 에지부분과 필드플레이트 에지부분에 집중 되어있던 전기장이 효과적으로 분산된다. 그에 따라 애벌런치 효과가 줄어들게 되어 항복전압 특성이 향상된다. 결론적으로 최적화된 게이트 필드플레이트 구조는 일반적인 구조에 비해 항복특성을 약 300% 이상 향상시킬 수 있다.

건설 산업의 시설물 자산관리를 위한 분류체계 역량 (Breakdown Structures for Physical Asset Management in Built Environment)

  • 다금;문경필;이윤섭;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.305-306
    • /
    • 2021
  • Breakdown structure (BS) is a tool used to allocate information packages for various management functions and drive computerized information systems. Although several BS exists, work breakdown structures (WBS) and cost breakdown structures (CBS) are the most widely studied and used in previous literature. Nevertheless, heterogeneity of BS and respective management capabilities in current practices are not adequately addressed. In this context, this paper compared the management capabilities of various BS in both building and plant industries through systematic literature. Management requirements and applications scope, in terms of life cycle and stakeholder, were analyzed, respectively. Finally, finding and lesson-learned are outlined.

  • PDF