Purpose: This paper aims at improving inefficiency of an existing posterior preference articulation method proposed for dual response surface optimization. The method generates a set of non-dominated solutions and then allows a decision maker (DM) to select the best solution among them through an interval selection strategy. Methods: This paper proposes an iterative posterior preference articulation method, which repeatedly generates the predetermined number of non-dominated solutions in an interval which becomes gradually narrower over rounds. Results: The existing method generates a good number of non-dominated solutions not used in the DM's selection process, while the proposed method generates the minimal number of non-dominated solutions necessitated in the selection process. Conclusion: The proposed method enables a satisfactory compromise solution to be achieved with minimal cognitive burden of the DM as well as with light computation load in generating non-dominated solutions.
Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.
Currently, 10% of the domestic aircraft accidents and 9% of delays and cancellations were generated due to poor maintenance. Aircraft maintenance work is divided into works in material warehouse and in hangar. In material warehouse, the problem in aircraft maintenance work is occurred when the serial number of parts are identified and entered. In hangar, work order are duplicatively written. In addition, the maintenance information is not shared and then work order is wrong delivered. In this study, we analyzed the maintenance process and the informations that occurs in the material warehouse and hangar for large airline company to solve the problems. And serial numbers are replaced by QR code. And documented work order and manual are handled using the tablet PC. In conclusion, this paper studied smart work of maintenance process about tire parts. We expect to improve the inefficiency of identification of serial number and total maintenance time is reduced by real-time information sharing.
This is a case study of Seoul St. Mary's Hospital applying a real-time enterprise (RTE) strategy to improve customer satisfaction and operational efficiency with the main process of medical institutions. The hospital is applying an RTE strategy to get real-time information on occurrences at each contact point of the main process of the medical institution from reservation to discharge through dashboard and to resolve issues through rapid decision-making. The RTE strategy of the hospital has some summaries: First, the hospital has linked a hospital management strategy to the RTE strategy to build a patient-centered treatment process. Second, the hospital has operated a control tower for change management and implementation monitoring in the process of implementing the RTE strategy. Third, the hospital has built systematic RTE-based environment as an application program in which the nU System is linked to Business Processor Renovation (BPR) promoted from 2006 on. Fourth, the hospital is applying a strategy to improve efficiency in operating the hospital by increasing customer satisfaction, removing inefficiency and variability, and managing medical resources efficiently through the RTE strategy. Fifth, it has established an information-sharing system through authority management for each user in terms of RTE information. Sixth, it has supplemented limitations of short-term information of the RTE strategy by linking the key performance index to the cost information system in order to improve performance of the RTE strategy. Seventh, it has improved customer satisfaction and achieved higher performance in improving operational efficiency, as compared with rival hospitals, through the RTE strategy.
This study investigates application cases of facility management system model for enhancing facility productivity of industry filed around medium and small facility processing companies and finds the inefficiency of the existing management model. Following items are researched to seek out methods and measures to maximize facility productivity through empirical analysis by exploring and establishing a new management model. First, the empirical analysis, it is found that the overall equipment efficiency index used for facility productivity management in the companies has a difficulty being used as the index for it in actual medium-small processing companies. Second, a new facility management system model applying standard cycle time is suggested among facility management index system to measure facility productivity. Third, the empirical analysis is used to verify that developed facility management system model is a useful method to manage the facility productivity by applying the model to actual medium-small processing companies. Finally, it is necessary to implement comparison analysis on whether actual productivity enhancement induces a distinctly different result by using a new facility management index system model to be inhibited in this study.
Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.
소방서는 재난관리의 대응기관으로서 각종 현장에 출동하여 현장상황에 대한 많은 경험과 자료를 축적하여 화재예방 및 진압활동 등에 활용할 수 있음에도 불구하고 사고의 기록, 분석, 정보관리 등이 미흡한 실정이다. 이러한 사항을 보완하기 위하여 소방방재청에서는 화재조사팀을 주축으로 "국가 화재조사분류체계"를 혁신적으로 개선하였다. 본 연구에서는 소방서에서 수행하고 있는 기존의 화재조사 과정과 자료 취득 및 분석 과정을 살펴보고, 활용 방안을 제시함으로서 "국가 화재조사분류체계"의 운영에 필요한 기초 자료를 제공하고자 한다.
As the computer graphic technology has developed rapidly, the management of visual effects production has also changed. However, the insufficient rest and the inefficiency of communication have resulted in more pressure which would weaken the strength of the whole team. For searching the possible solution, this research has applied the SCRUM in VFX production and analyzed the impact of SCRUM for VFX project management. SCRUM was first used in the projects of software development, but now there are already many successful examples of introducing SCRUM into their facilities in various fields. This paper has used SCRUM in the experimental group and present methodology in VFX project management in the control group for the same project. Based on the analysis of the questionnaire investigation from both group with using t-test for data analysis, it has confirmed the credibility of the questions in the questionnaire index as α > 0.72. With the result of analysis based on the corresponding samples of the t-test, it shows the diversity of SCRUM for project management, and the convenience of communication within the team can enhance the team strength. Follow-up research will attend to provide more suggestions for applying SCRUM in other areas in project management.
최근 건설 사업에서 시공이전단계인 설계단계 공사비관리의 중요성이 대두되고 있지만, 설계단계 공사비관리를 위한 제도적 장치나 기술수준은 외국에 비해 매우 낙후되어 있다. 전통적으로 건설 사업에서 공사비관리는 시공단계에 국한되어, 설계단계 공사비관리를 위한 기본 틀과 분류 표준, 공사비 데이터 등 인프라가 부족하여 설계단계 공사비관리 업무를 수행하는데 있어 한계가 있다. 따라서 본 연구에서는 국내 설계단계에서 공사비관리가 효율적으로 수행되기 위해 관리되어야 할 주요 영향요인을 도출하고자 하였다. 설계실무자를 대상으로 설문조사를 통해 설계단계 공사비관리 현황과 문제점을 분석하였고, 설계단계 공사비관리 저해항목에 대해 공사비관리 업무에 미치는 영향도를 조사하였다. 요인분석을 통해 5개의 설계단계 공사비관리 주요 영향요인을 도출하여 향후 설계단계 공사비관리 지원도구 및 제도적 기반 구축에 기여할 수 있도록 하였다.
Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.