• Title/Summary/Keyword: Industrial Plant Project

Search Result 74, Processing Time 0.023 seconds

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

Analysis on the Characteristics of the Precedents for Industrial/Technological Cultural Properties of the Hansa Coking Plant (독일 산업·기술문화재 한자 코크스 제조소 재생사례 분석)

  • Kim, Hong-Gi;Park, Chang-Ho
    • Journal of the Korea Furniture Society
    • /
    • v.27 no.1
    • /
    • pp.59-68
    • /
    • 2016
  • The Industrial/Technological Cultural Properties are being protected, the rest facing with demolition and damages. In order to better cope with such situation, Korea has officially introduced the Registered Cultural Properties System since 2001 and began acknowledging the historical values of industrial buildings as modern cultural properties. In the Nordrhein-Westfalen, Germany, there are approximately 3,500 industrial buildings under the cultural asset protection and management not only in the Ruhr-region but also state-wide. Among these, this case study focuses on the Hansa Coking Plant, a large-scale Revitalization project to rehabilitate the old industrial complexes and facility buildings that have been shut down on December 15, 1992. Purpose of this study is to analyze main project plans of each facility in the Hansa Coking Plant and to bring out the main features of the plans, so that they can be utilized to find suggestions for Industrial/Technological Cultural Properties Revitalization in Korea.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

Conceptual Design of 100 MWe Oxy-coal Power Plant-Youngdong Project (100 MWe 순산소 석탄연소 발전시스템의 개념설계-영동 프로젝트)

  • Choi, Sangmin
    • Journal of the Korean Society of Combustion
    • /
    • v.17 no.3
    • /
    • pp.30-45
    • /
    • 2012
  • An existing unit of power plant is considered to refurbish it for possible application of carbon capture and storage(CCS). Conceptual design of the plant includes basic considerations on the national and international situation of energy use, environmental concerns, required budget, and time schedule as well as the engineering concept of the plant. While major equipment of the recently upgraded power plant is going to be reused, a new boiler for air-oxy fired dual mode operation is to be designed. Cryogenic air separation unit is considered for optimized capacity, and combustion system accommodates flue gas recirculation with multiple cleaning and humidity removal units. The flue gas is purified for carbon dioxide separation and treatment. This paper presents the background of the project, participants, and industrial background. Proposed concept of the plant operation is discussed for the possible considerations on the engineering designs.