• Title/Summary/Keyword: Incheon bridge

Search Result 98, Processing Time 0.024 seconds

Interdisciplinary Procedure for Scour Estimation at Inchon 2nd Bridge Piers (인천 제2연육교 세굴문제 해결을 위한 학제간 공동연구 방안)

  • Yeo, Woon-Kwang;Kim, Jeong-Hwan;Lee, Yang-Ku;Kim, Tae-In;Kim, Jong-In;Kwak, Ki-Seok;Lee, Jong-Kook;Kwak, Moon-Soo;Kim, Moon-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.71-80
    • /
    • 2005
  • More than 100 bridges have been annually collapsed or seriously damaged by scouring in Korea. It is extremely hard to understand the complicated scour mechanism and estimate the scour depth with accuracy in fields, however since scouring is a very complex manifestation of sediment transport unable to describe with a simple mathematical tool. In order to obtain the reasonable solution to bridge scouring, therefore, the interdisciplinary co-operation is strongly recommended. In this study the special task force team for the scour problems around Incheon 2nd bridge piers is made, in which all kinds of scour oriented researches such as oceangraphic survey, hydraulic model test, numerical simulation, scour rate test, real-time scour monitoring, etc will be carried out. This paper provides this interdisciplinary procedure in details.

  • PDF

A study on Fuel Cell generation system (연료전지 발전시스템에 관한 연구)

  • Jeong, Dong-Hyo
    • Proceedings of the KIEE Conference
    • /
    • 2008.11b
    • /
    • pp.77-78
    • /
    • 2008
  • Recently, a fuel cell is remarkable for new generation system. The fuel cell generation system converts the chemical energy of a fuel directly into electrical energy. The fuel cell generation is characterized by low voltage and high current. For connecting to utility, it needs both a step up converter and an inverter. The step up converter makes DC link and the inverter changes DC to AC. In this paper, full bridge converter and the single phase inverter are designed and installed for fuel cell. Simulation and experiment verify that fuel cell generation system could be applied for the distributed generation. In this paper, the 1.5kW active clamp current-fed full bridge converter employing MOSFETs is operated to discharge the battery whereas a voltage-fed half bridge converter employing IGBTs is operated to charge the battery.

  • PDF

Analysis on the Rigid Connections of the Drilled Shaft with the Cap for Multiple Pile Foundations (현장타설말뚝을 적용한 다주식 기초에서 말뚝과 캡의 강결합에 대한 분석)

  • Cho, Sung-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.61-73
    • /
    • 2008
  • Piles of a bridge pier are connected with the column through the pile cap (footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. Connection methods between pile heads and the pile cap are divided into two groups : rigid connections and hinge connections. Domestic design code has been specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However, some specifications prescribe that conservative results through investigations of both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which has high-quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) is unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the large diameter drilled shaft and the pile cap for Incheon Bridge which will be the longest bridge of Korea were investigated through the full modeling for rigid connection conditions.

Study on Reduction of Flooding Area Using XP-SWMM at Inundation Region in the Reclaimed Land near the Incheon Bridge (XP-SWMM 모형을 활용한 인천교 매립지 침수 피해 경감에 대한 연구)

  • Choi, Gye Woon;Lee, Ho Sun;Han, Man Shin;Lee, Byung Joo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.500-505
    • /
    • 2004
  • 인천지역은 지형이 낮은 관계로 배수가 원활하지 못한 지역이 있고 또한 서해안 특유의 높은 조석간만의 차이로 인하여 만조시에는 배수가 어려워 침수가 발생하는 지역이 많다. 이에 대하여 매립된 인천교 주변 하수관거의 통수능을 수치해석을 통하여 분석하고 배수 체계 및 인천교 주변의 내수 배제에 대한 문제점을 파악하여 침수 개선방안을 제시하므로써 인천교 주변 매립지의 침수피해를 경감시키고자 하였다. 통수능 분석을 위한 수치해석 프로그램으로 SWMM모형이 선정되었으며 보다 정확한 해석을 위하여 대상 유역을 수십 개의 소유역으로 구분하여 소유역의 유출을 계산한 후에 관로 내 흐름에 대하여 해석을 실시하였다. 소유역에서의 보다 정확한 유출량 산정을 위하여 평균유출계수(C값)를 사용치 않고 소유역마다 산출된 별도의 유출계수를 이용하였다. 유출량 산정을 위한 강우강도는 기존의 인천대공식과 최근의 강우량을 감안한 해석결과를 비교하여 기존의 인천대 공식 사용이 가능함을 판단하고 이를 사용하여 20년, 30년 빈도의 확률강우강도를 산정하였다. 설계빈도에 대하여 유역 내 침수 피해를 경감시키는 4개의 대안을 선정하여 각각의 대안에 대한 해석을 실시하여 침수피해 개선효과를 비교하여 최적의 대안을 판단하였다.

  • PDF

A Case Study on the Need for Diagnosis of Current Issues and Policy Support in Marine Space: Focusing on the Specialized Marine Industry in Incheon (해양공간의 현안진단 및 정책지원 필요성에 대한 사례연구 : 인천지역 해양특화산업을 중심으로)

  • Jeong-eun, Lee;Min-eui Jeong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.7
    • /
    • pp.1158-1168
    • /
    • 2022
  • In this study, the specialized marine industry in the area (Incheon) of the case study was identified and the issues related to the current status of marine space utilization were diagnosed. Marine space utilization was selected as the specialized marine industry activity in Incheon through the location quotient index analysis of the marine industry in the target area. A case review of the Yeongheungdo demonstration area and diagnosis of issues in the marine energy development sector with the lowest degree of specialization was conducted, to solve field problems such as overlapping problems in marine-use zones and civil complaints between stakeholders. It was concluded that it is necessary to prepare a policy decision support system based on objective and quantitative grounds.

Signal Analysis from a Long-Term Bridge Monitoring System in Yongjong Bridge (영종대교 계측시스템의 신호데이터 분석)

  • Kim, Sung-Kon;Koh, Hyun-Moo;Lee, Jung-Whee;Bae, In-Hwan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.9-18
    • /
    • 2006
  • This paper presents schematically the monitoring system installed in Yongjong Bridge, a self-anchored suspension bridge located in the expressway linking Seoul and Incheon International Airport. Automatic measurement of instrumented civil engineering structures is now widely applied for behavior monitoring during construction in field as well as long-term monitoring for lifetime assessment of bridge structures. A representative example of results that can be acquired through structural health monitoring system is presented by means of data measured during a few years after the opening of the bridge. In order to effectively measure the tension force for hangers that have relatively short length or high tension force, a static tension measurement device has been explored. Newly equipped railway system on the existing bridge results in change of dead load, consequently dynamic characteristics have also been changed. This result can be detected by the monitoring system during and after railway construction.

Estimation of Service Life for Expressway Bridge Subjected to Chloride Ingress from De-icer (동절기 제설제 사용에 대한 고속도로 교량의 내구수명 평가)

  • Lee, Honam;Jeon, Chanki;Kim, Juho;Shim, Jaeyeong;Jeon, Inkyu
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.4
    • /
    • pp.548-555
    • /
    • 2015
  • This paper aims to estimate the service life of the target bridge structures subjected to chloride ingress from de-icer, which is used for safety of vehicles in winter, by investigating the chloride ingress into concrete. In this study, the 10-year-old bridge structures were investigated by measuring the chloride along the depth from the exposed surface to derive the surface chloride concentration and the diffusion coefficient for the prediction of service life. The service life of each measured point on the structures were estimated with the surface chloride concentration and the diffusion coefficient by using Life-365 software. As a result, it was estimated for all measured points to have over 100-year service life. Furthermore, the diffusion coefficient and the service life from the measured data were compared to another method calculated with the concrete mix, considering the time dependency of diffusion coefficient.

Pier-Scour Characteristics of the Marine Bridge with Ship Impact Protection - Incheon Bridge Case - (선박충돌방지공이 설치된 해상교량의 교각 세굴 특성 분석 - 인천대교를 대상으로 -)

  • Yeo, Woon-Kwang;Ji, Un;Kim, Chang-Sung;Lim, Jong-Chul
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.2
    • /
    • pp.203-211
    • /
    • 2008
  • More recently, the massive marine bridges in a ship passage have been constructed on the sea. Therefore, the ship impact protection for the bridge-piers are installed to consider the possibility of vessel collision danger. Due to the ship impact protection, the pier-scour characteristics are changed in comparison with the condition without the ship impact protection (SIP). In this study, the physical modeling for the Incheon Sea-Crossing Bridge was performed to analyze the pier-scour characteristics with respect to the vessel collision protection. The rigid and movable bed tests were conducted to evaluate the flow pattern, scour depth, and scourhole with and without the ship impact protection. The experimental results for the maximum scour depth is increased 0.24 m in W1 pier at the same location and 2.4 m in W2+3+4 piers due to the SIP installation. Especially, the maximum scour depth in W2+3+4 piers was occurred around the SIP.

A Study on Performance of Steel Monocell Expansion Joints (강재형 모노셀 신축이음장치 성능 연구)

  • Kim, Yong-Hoon;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.502-509
    • /
    • 2019
  • Studies have been made on performance evaluation of expansion joint systems for an ordinary highway or road bridge. However little study has been made for runway connection bridges at airports. A study on performance evaluated from computer code analysis and shrinkage, extension, and compression repetition tests based on KS F 4425 is conducted to a newly developed expansion joint system which has been installed in a runway connection bridge at Incheon Airport Extension 2 Construction Site. The MIDAS computer code is used to analyze the performance before the manufacture of the mock-up of expansion joint system on the basis of design requirements. Tests based on the KS F 4425 of 2001 year-version are conducted for the mock-up. Domestic codes and standards to validate the performance of the expansion joint system in a connection bridge have been developed for a vehicle. However the expansion joint system tested in this study is installed in a runway connection bridge for an aircraft. Conservatively the heaviest one among airplanes departing and landing at Incheon Airport is assumed level-F $468.4kN/m^2$ and adopted for the tests and analyses in this study. KS F 4425 method is selected for the shrinkage, extension, and compression repetition tests. No remarkable problem was observed for the 2,500-cycle shrinkage and extension and two million-cycle repeatition load tests. The results of this study are expected to contribute to establishment of code and standard for the performance validation of an expansion joint system installed in a runway connection bridge for an aircraft by providing performance test results and computer analysis results based on finite element methods.

Study on the Field Construction of Semi-Integral Bridge with PSC Girder Integrating End-Diaphragm (단부격벽 일체형 PSC거더를 갖는 반일체식 교량의 시공성 연구)

  • Park, Jong-Myen;Kim, Jin-Bae;Jun, Sung-Yong;Kim, Chung-Sik;You, Sung-Kun;Park, Joong-Bai;Lim, Jung-Hoon
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.5 no.2
    • /
    • pp.21-26
    • /
    • 2014
  • This paper introduces general concepts of jointless bridges and field construction case of semi-integral bridge with psc girder integrating end-diaphragm. The expansion joints need to satisfy thermal and safety conditions of bridges. General bridges with joints have some problems, which are frequently replacement cycle time from mechanical damage or unstable movement, maintenance cost and more. To solve these problems, Integral Abutment Bridges(IAB) have been applied overseas in the 1930s. In Korea, first IAB was constructed in the early 2000s and precast IAB systems was invented and applied lately. Kyungshin overpass bridge in Incheon is the Semi-IAB constructed, the span length is 2@35=70m and the width is 13.9m. The original plan was to use general joint bridge but design field changed with expectations for advanced economic estimation and maintenance. This changed method of B.I.B bridge construction provided not only workability, construction cost but also safety improvement at the same time.