• Title/Summary/Keyword: Implementation Plan

Search Result 1,285, Processing Time 0.037 seconds

Current Status and Issues of Data Management Plan in Korea (데이터 관리 계획의 국내 현황 및 과제)

  • Choi, Myung-seok;Lee, Sanghwan
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.6
    • /
    • pp.220-229
    • /
    • 2020
  • With the recent development of digital technology, the research paradigm is evolving towards data-driven. National management and utilization of research data is a key element not only to enhance research transparency and efficiency, but also to prepare for a data-driven society. Policies and infrastructure for sharing and utilization of research data from publicly-funded research are being actively promoted worldwide. In Korea, related regulations were recently revised to mandate to submit a data management plan (DMP) when proposing a national R&D project. In order to effectively implement the sustainable DMP system, researchers need various support. In addition, guidelines and implementation procedures are essential for management and utilization of research data at the national or institutional level. In this paper, we provide an overview of the data management plan, examine the current status and issues in Korea, and suggest a template and checklists of data management plan, and an implementation procedure at research institutes.

A Study on the Development of a GIS Master Plan based on the Analysis of the Information Master Plan for a Municipality (지역정보화 추진과 연계된 GIS기본계획의 수립방안에 관한 연구 (천안시를 중심으로))

  • Kim, Seong Hoon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.9 no.1 s.17
    • /
    • pp.49-57
    • /
    • 2001
  • One of the biggest problems found from the results of the various GIS-related projects which have been fulfilled by many local self-governing bodies is as follows. Many GIS projects have been undertaken without the proper review on National Standards on GIS, the information master plans for the development of the municipalities, and the GIS master plans which should be followed by the former ones with the relatively detailed implementation planning. Because these projects were to be done at most with little considerations of the formerly mentioned materials such as vision, goals, strategies, and the implementation planning, it is quite doubtful that a GIS project could play a proper role as an element in the integrated information system. As an effort to solve this problem, this paper first analyzes the types of the GIS projects done by many municipalities, proposes a recommended procedure for a life cycle of a GIS project and for a GIS master plan based on the information master plan for a municipality.

  • PDF

Implementation of an Agent-centric Planning of Complex Events as Objects of Pedagogical Experiences in Virtual World

  • Park, Jong Hee
    • International Journal of Contents
    • /
    • v.12 no.1
    • /
    • pp.25-43
    • /
    • 2016
  • An agent-centric event planning method is proposed for providing pedagogical experiences in an immersed environment. Two-level planning is required at in a macro-level (i.e., inter-event level) and an intra-event level to provide realistic experiences with the objective of learning declarative knowledge. The inter-event (horizontal) planning is based on search, while intra-event (vertical) planning is based on hierarchical decomposition. The horizontal search is dictated by several realistic types of association between events besides the conventional causality. The resulting schematic plan is further augmented by conditions associated with those agents cast into the roles of the events identified in the plan. Rather than following a main story plot, all the events potentially relevant to accomplishing an initial goal are derived in the final result of our planning. These derived events may progress concurrently or digress toward a new main goal replacing the current goal or event, and the plan could be merged or fragmented according to their respective lead agents' intentions and other conditions. The macro-level coherence across interconnected events is established via their common background world existing a priori. As the pivotal source of event concurrency and intricacy, agents are modeled to not only be autonomous but also independent, i.e., entities with their own beliefs and goals (and subsequent plans) in their respective parts of the world. Additional problems our method addresses for augmenting pedagogical experiences include casting of agents into roles based on their availability, subcontracting of subsidiary events, and failure of multi-agent event entailing fragmentation of a plan. The described planning method was demonstrated by monitoring implementation.

Comparative Analysis of the Long-term Management Plan of Natural Parks - A Focus on Jeollabuk-do Provincial Parks -

  • Jeong, Nara;Kang, Sanghui;Ahn, Deugsoo
    • Journal of recreation and landscape
    • /
    • v.12 no.4
    • /
    • pp.59-66
    • /
    • 2018
  • The purpose of the present study was to compare the long-term management objectives, policy objectives, implementation plans, and detailed plans of four provincial parks established in 2013 using various analysis frameworks. Through this, the study aimed to identify the characteristics of the management plan and extract the implementation plan important to each park by analyzing the priorities in the detailed plan. The long-term management objectives of most parks were to maintain recreational functions by utilizing all the resources of the park, rather than merely preserving the ecosystem. From an ecological perspective, information on major plants and legal protection species are included for most parks, and geological and topographic features considered a major resource. For sustainable forests, it is important to induce the dispersion of concentrated use space. Efficient management systems are distinctively differentiated among the parks. For regional revitalization, the management of programs to link provincial parks and their surrounding areas has become most important. From an ecological perspective, priorities differed for the parks according to their ecological characteristics. For sustainable forests, Moaksan Provincial Park prioritized the visitor reservation system related to the overall park, while the other three parks prioritized alleviating the concentrated use of specific areas. From an efficient management perspective, Daedunsan Provincial Park prioritized aspects related to the cableway. Maisan Provincial Park prioritized inducing the linkage between the use of natural and cultural resources, and Seonunsan Provincial Park prioritized establishing an ecological and cultural commentary operating system. For the base-type leisure activity space, Moaksan Provincial Park prioritized the systematic management and operation of the pilgrimage route, Maisan Provincial Park the connection between the Maisan geography and residents' income, and Seonunsan Provincial Park providing a space for ecological education.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

Risk Factor Analysis in the Implementation Phase of the Housing Redevelopment Project (주택재개발사업 시행단계의 위험요인 분석)

  • Ahn, Jeong-Min;Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.97-105
    • /
    • 2011
  • As many stakeholders are taking part in the Housing Redevelopment Project, their opinion mediation is considering very important issues. Thus disputes on projects are inevitable due to complexity of interest. To effectively progress the project, this paper analyze the risk factors by phase in implementation phase that the association participates in person. We identify 50 of risk factors in implementation phase by reviewing and analyzing related studies and actual cases of disputes, then we present 26 of risk factors through experts interview. Also, we calculate weights of risk factors by using AHP for quantitatively analyzing them and present final weights and priorities of risk factors by summing weights of risk factors by phase. In results, it is found that 'the inappropriateness of the Management Disposal Plan' in management disposal plan phase and 'the inappropriateness of the Project Implementation Plan' are the most significant risk factors. To maximize the utilization of risk factors analyzed, we present the checklists that can be aware of these risks in advance and prevent these risks. Based on these findings, if risk factors in implementation phase are managed actively, the housing redevelopment project will be performed more effectively.

The Design and Implementation of a Les Plan Management System Using the Connectivity of Web and DBMS (웹과 데이터베이스 연동을 이용한 교수-학습안 관리 시스팀의 설계 및 구현)

  • 이정민;안병태
    • KSCI Review
    • /
    • v.8 no.2
    • /
    • pp.15-23
    • /
    • 2001
  • Due to the popularization of Web. the importance of Web for teachers to collect teaching materials increases, but there are difficulties in using Web. due to the rapid increase of information and the shortage of proper skill of using it. The thesis designs and implements a lesson plan management system that systematically manages diverse data and teachers' knowledge. The information required in preparing lesson plans is acquired on the Web and stored in database, and the lesson plan Produced this way could be shared by other teachers on the Internet. In addition. lesson plan DTD was designed and every lesson Plan was transformed into XML data to Provide more convenient data exchange and diverse forms. so that its application could be extended to other education-related systems.

  • PDF

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

Spectrum Policy and Strategic Plan in the United States of America (미국의 전파 정책 및 전략 계획)

  • Kim, Chang-Joo
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.23 no.8
    • /
    • pp.853-860
    • /
    • 2012
  • In this paper, We shed light on radio spectrum policy and strategic planning of the United States of America and draw some conclusions. First of all, as the radio technology evolves with time, paradigm shift from command & control to market-based approach and spectrum commons is reviewed. Strategic spectrum planning of USA is also analyzed and some suggestions are drawn. In particular, USA plan for developing dynamic spectrum access(DSA) technologies and implementation of the test-bed for the DSA spectrum sharing is discussed, which improves the spectral utilization. Finally We deal with spectrum re-farming issue for mobile broadband and implicative points based on the National Broadband Plan.

A Study on the Direction of the Public Environment Design based on the Regions' Sense of Identity (지역정체성을 기반으로 한 공공환경 디자인의 방향 연구)

  • Song, Young-Min
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.98-105
    • /
    • 2012
  • The purpose of this study is to present the direction for effective public environment design by becoming aware of the social, cultural and historical values that are inherent to the specific regions once again. Concept of regions' sense of identity, regions' resources and regionality were identified as a means based on the basic cityscape plan and guideline for public design. Sample city was analyzed by extracting the regionality elements, and the results are as follows. First, appropriateness of the direction for the public environment design based on the regional identity was confirmed. The need to establish regional identity in the cityscape plan is specified when it comes to the basic goal, strategy and direction. Second, public environment design should be planned within the context of the cityscape. It is necessary to improve with integrated plan by setting up the consistent goal, direction and detailed guideline based on the basic concept of cityscape plan. Third, 'design city' requires the development of the unique design and planned techniques based on the harmony with the existing resources. It is necessary to uncover the powerful design elements that are exclusive to specific regions, and to search for differentiation and visualization to form consensus. Public environment based on regional identity will improve if the above mentioned research results are used as the basic data when it comes to the implementation of public environment design.

  • PDF