• Title/Summary/Keyword: IT projects

검색결과 4,946건 처리시간 0.029초

A Study on the Influencing Factors on the Profit Improvement Rate of IT Service Projects (IT서비스 프로젝트의 이익개선율 영향요인에 관한 연구)

  • Lee, Kyung-Bae;Oh, Jay-In
    • Journal of Information Technology Applications and Management
    • /
    • 제17권4호
    • /
    • pp.127-156
    • /
    • 2010
  • Most companies in the IT service industry have suffered from low profitability although this industry is highly value added, which may result in losing the competitiveness of the industry. The purpose of this study is to identify the influencing factors on the profit improvement rate of IT service projects and suggest how to improve the profit improvement rate, thus recovering the competitiveness of the IT service industry. The 273 IT service projects conducted by an IT service company in Korea during the past three years were analyzed and the project managers who performed these projects responded to the questionnaire developed in this study. The result from the analysis of data collected shows that the influencing factors on the profit improvement rate of IT service projects include scheduling, experience in similar projects, the leadership of project leaders, the level of team skills, relationship with clients, and clients support.

  • PDF

Role of Cultural Factors in IT Projects: In the Context of Developing Economies

  • One-Ki Daniel Lee;Josephine Namayanja;Dilnoza Ibragimova
    • Asia pacific journal of information systems
    • /
    • 제30권1호
    • /
    • pp.188-213
    • /
    • 2020
  • Various information and communication technologies (ICT) and electronic government (e-Government) projects have been planted in hopes of economic and social growth in developing economies. These types of ventures usually involve working in societies with their own unique cultures in various aspects that often cause "custom ways" of planning, implementing, coordinating, and controlling in IT projects, thus playing a grand role in determining the success of IT projects. Due to a lack of understanding of local cultural factors and a deficiency of cultural risk evaluation models, however, many IT projects especially in the context of developing economies face failure. This study investigates the major cultural factors involved in IT projects and their effects on IT projects in developing economies. The framework is validated using the United Nations Development Programme's (UNDP) information and communication technology (ICT) and e-Government project cases of two countries in Central Asia, Uzbekistan and Kazakhstan. This study will help project managers develop management practices and strategies associated with the cultural factors they face during the various stages of their IT projects in their specific contexts.

A Quality Model of National R&D Projects based on ISO/IEC Standards (ISO/IEC 국제표준에 기반한 국가연구개발사업 품질측정모델에 관한 연구)

  • Song, Byeong-Sun;Lee, Jae-Sung;Rhew, Sung-Yul;Lee, Nam-Yong
    • Journal of Information Technology Services
    • /
    • 제7권3호
    • /
    • pp.31-45
    • /
    • 2008
  • The number of national research and development(R&D) projects have been continually increased, and it is necessary that the efficiency of investment of R&D projects have been improved during the last two decades. also the government has improved national R&D process and supporting tools for the projects. However, it is not enough to develop a quality model to evaluate the projects systematically. Therefore, a quality model for national R&D projects need to be revised. The quality model for the projects should be based on the global standard(ISO/IEC 9126). In this paper, the authors proposed a quality model for national R&D projects and took a case study for verification of the quality model. The quality model is defined in terms of functionality, reliability, usability, efficiency, portability and maintainability. Also, the authors suggest metrics for measuring the quality of products or services. finally, The productivity and quality of national R&D projects will be improved by the quality model.

Practical Project Behavior Management Methods for Large-scale IT Projects (대규모 IT 프로젝트를 위한 실용적 행태관리 방안)

  • Kim, Min-Seon;Song, Sung-Hwan;Kim, Yong-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제16권7호
    • /
    • pp.4897-4911
    • /
    • 2015
  • Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.

Effects of Information from Enterprise Architecture on Government IT Projects (EA(Enterprise Architecture)에서 제공하는 정보가 공공기관 정보화사업수행 활동에 미치는 영향 연구: 관세청 정보화 구축·운영사업 사례를 중심으로)

  • Hyun, Myungjin;Kim, Miryang
    • Informatization Policy
    • /
    • 제29권3호
    • /
    • pp.61-81
    • /
    • 2022
  • This paper explores how the provided information from Enterprise Architecture (EA) affects the activities to for performing IT projects. The IT projects analyzed in this paper are projects to for developing and maintaining Korea Customs' UNI-PASS. This research was conducted based on surveys to demonstrate the effects of the information from EA on activities for IT projects. Information from EA is categorized into propriety, sufficiency and consistency. Activities for IT projects are defined as management, participation, communication, requirement management and human resource. Correlational analysis is used to measure the effects of the inf ormation on the defined activities. The analysis, which verifies the provided information by EA, does not have meaningful correlation with project management nor human resource. For public officials in charge, Sufficiency of the information produces a positive effect on decision making. For operation company, consistency of the information encourages utilization of the resources required for the project. This research suggests that strategies for performing IT projects with EA information that can support the verification of characteristic environments of each project and performance of vital activities required by the participants' roles will ensure the success of government IT projects.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • 제19권2호
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

An Improvement of Evaluation Indicator System Geared towards Comprehensive Rearrangement Projects in Seats of Township and Town Offices -Based on the Existing Evaluation Indicator System of Small Town Promotion Projects- (읍.면 소재지 종합정비사업 평가지표 체계의 개선방안 -기존 소도읍 육성 사업의 평가지표 체계 분석을 바탕으로-)

  • Kim, Eyn-Jeong;Ahn, Yoo-Jeong;Lee, Man-Hyung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • 제14권1호
    • /
    • pp.45-56
    • /
    • 2012
  • This study focuses on design of supplementary evaluation indicator system geared towards comprehensive rearrangement projects in seats of township and town offices. In the first phase, it tries to reveal major problems and issues related to evaluation of the existing small town promotion projects. In terms of analytical tools, this study depends on the Delphi and AHP techniques. In specific, after three rounds of the Delphi methods, it extracts a series of alternative evaluation indicators derived from the AHP methods. It covers 5 major evaluation criteria, under which 18 independent items are hierarchically interconnected. It expects that these alternative evaluation indicators would contribute to selecting appropriate small town promotion projects. Next, applying these evaluation indicators, we examine couples of comprehensive rearrangement projects in seats of township and town offices. From the comparative contexts, we believe that the proposed alternative evaluation criteria would improve the general satisfaction level of key stakeholders in deciding the priority order of the small town promotion projects.

Design of Semantic Search System for the Search of Duplicated Geospatial Projects (공간정보사업의 중복사업 검색을 위한 의미기반검색 시스템의 설계)

  • Park, Sangun;Lim, Jay Ick;Kang, Juyoung
    • Journal of Information Technology Services
    • /
    • 제12권3호
    • /
    • pp.389-404
    • /
    • 2013
  • Geospatial information, which is one of social overhead capital, is predicted as a core growing industry for the future. The production of geospatial information requires a huge budget, so it is very important objective of the policy for geospatial information to prevent the duplication of geospatial projects. In this paper, we proposed a semantic search system which extracts possible duplication of geospatial projects by using ontology for geospatial project administration. In order to achieve our goal, we suggested how to construct and utilize geospatial project ontology, and designed the architecture and process of the semantic search. Moreover, we showed how the suggested semantic search works with a duplicated projects search scenario. The suggested system enables a nonprofessional can easily search for duplicated projects, therefore we expect that our research contributes to effective and efficient duplication review process for geospatial projects.

A Study on the Development of PMO Cost Estimation Model (PMO 대가 산정모형의 개발)

  • Seo, Yong Won;Lee, Duck Hee
    • Journal of Information Technology Services
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • 제25권2호
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.