• Title/Summary/Keyword: IT Risks

Search Result 2,319, Processing Time 0.029 seconds

The Path Analysis of Consumers' Decision-making to Purchase GMO Foods and Request for Labelling It (소비자의 유전자재조합 콩 식품 구매의사 및 표시요구에 대한 경로 분석)

  • Huh, Kyung-Ok
    • Korean Journal of Human Ecology
    • /
    • v.12 no.3
    • /
    • pp.351-362
    • /
    • 2003
  • The goal of this study was to examine the effects of perceived risks toward GMO (Genetically Modified Organism) food on the decision-making to purchase it and demands to reveal its Identity. The major results were as follows. First, consumers strongly perceived the risk toward GMO food, and demanded labeling to identify it. But, many consumers had indecisive in the purchase of GMO food. Second, consumers with high level of perceived risks toward GMO food were more likely not to buy GMO food. In addition, the level of perceived risk was high among consumers who had many children. Finally, consumers with high level of perceived risks toward GMO food were more likely to demand the labelling for identifying GMO food. Consumers who had many children and high level of reliability for labelling food safety strongly demanded to label for revealing GMO food.

  • PDF

Real Option Applications of Korean Logistics Firms for ERP Project Evaluations (ERP 서비스 도입 시 국내 물류기업의 실물옵션 활용 수준에 대한 실증 연구)

  • Kim, Taeha;Nam, Seunghyeon
    • Journal of Information Technology Applications and Management
    • /
    • v.26 no.6
    • /
    • pp.119-138
    • /
    • 2019
  • This work examines whether IT managers adopt of real options such as defer, expand, contract, and abandon in order to cope with ERP risks, which include technological risk, relationship risk with SW vendors, economic risk, and security risk. We collect data of logistics firms in Seoul and its suburbs in 2018 to empirically validate the effect of risks upon the adoption of real options. The results suggest that IT managers adopt all 4 options when facing economic risk and adopt contract and abandon options only when facing security risk. Additionally, we find that IT managers prefers expand option and avoid abandon option when they think ERP compatibility is high.

Finding Hazard Factors by New Risks on Maritime Safety in Korea

  • Park, Deuk-Jin;Park, Seong-Bug;Yang, Hyeong-Sun;Yim, Jeong-Bin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.3
    • /
    • pp.278-285
    • /
    • 2016
  • The key features of maritime accidents are the change of their attributes by new risks from time to time. To prevent maritime accidents in Korea, the impacts by new risks on domestic safety environments should be identified or predicted. The purpose of this paper is to find the hazard factors by new risks on maritime safety in Korea. The meaning of new risks is the elements of accident hazard which is compiled from new or rare or unprecedented events in the worldwide maritime transportations. The problems of new risks are the lacks of optimum countermeasures to mitigate accident risks. Using the questionnaires with 152 event scenarios classified by 20 accident causes, the hazard identification and risk analysis of new risks was performed based on the Formal Safety Assessment (FSA) by IMO. A total of 22 Influence Diagrams, which is to depict the transit flows between accident causes to consequences, is used in the construction of 152 event scenarios. A total of 20 accidents causes is the same contents as the causation factors represented in Statistical Year Book for Maritime Accidents of Korean Maritime Safety Tribunals. After defining the evaluation equations to the response results of questionnaires by 46 experts, the work for risk analysis is carried out. As results from the analysis of 152 scenarios, it is known that the root cause to affect on maritime safety in Korea is the pressure of business competition and it led to the lacks of well experienced crews, the overload of vessel operations and crew's fatigue. In addition, as results from the analysis of 20 accident causes, the three accident causes are to be candidate as main issues in Korea such as the inadequate preparedness of departure, the neglecting of watch keeping in bridge and the inadequate management of ship operations. All of the results are thought to be as basic hazard factors to safety impediments. It is thus found that the optimum Risk Control Options to remove the hazard factors and to mitigate consequences required are the following two factors: business competition and crewing problems.

Assessment of Semi-Quantitative Health Risks of Exposure to Harmful Chemical Agents in the Context of Carcinogenesis in the Latex Glove Manufacturing Industry

  • Yari, Saeed;Asadi, Ayda Fallah;Varmazyar, Sakineh
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.sup3
    • /
    • pp.205-211
    • /
    • 2016
  • Excessive exposure to chemicals in the workplace can cause poisoning and various diseases. Thus, for the protection of labor, it is necessary to examine the exposure of people to chemicals and risks from these materials. The purpose of this study is to evaluate semi-quantitative health risks of exposure to harmful chemical agents in the context of carcinogenesis in a latex glove manufacturing industry. In this cross-sectional study, semi-quantitative risk assessment methods provided by the Department of Occupational Health of Singapore were used and index of LD50, carcinogenesis (ACGIH and IARC) and corrosion capacity were applied to calculate the hazard rate and the biggest index was placed as the basis of risk. To calculate the exposure rate, two exposure index methods and the actual level of exposure were employed. After identifying risks, group H (high) and E (very high) classified as high-risk were considered. Of the total of 271 only 39 (15%) were at a high risk level and 3% were very high (E). These risks only was relevant to 7 materials with only sulfuric acid placed in group E and 6 other materials in group H, including nitric acid (48.3%), chromic acid (6.9%), hydrochloric acid (10.3%), ammonia (3.4%), potassium hydroxide (20.7%) and chlorine (10.3%). Overall, the average hazard rate level was estimated to be 4 and average exposure rate to be 3.5. Health risks identified in this study showed that the manufacturing industry for latex gloves has a high level of risk because of carcinogens, acids and strong alkalisand dangerous drugs. Also according to the average level of risk impact, it is better that the safety design strategy for latex gloves production industry be placed on the agenda.

Crowdsourced Risk Minimization for Inter-Application Access in Android

  • Lee, Youn Kyu;Kim, Tai Suk
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.5
    • /
    • pp.827-834
    • /
    • 2017
  • Android's inter-application access enriches its application ecosystem. However, it exposes security vulnerabilities where end-user data can be exploited by attackers. While existing techniques have focused on minimizing the risks of inter-application access, they either suffer from inaccurate risk detection or are primarily available to expert users. This paper introduces a novel technique that automatically analyzes potential risks between a set of applications, aids end-users to effectively assess the identified risks by crowdsourcing assessments, and generates an access control policy which prevents unsafe inter-application access at runtime. Our evaluation demonstrated that our technique identifies potential risks between real-world applications with perfect accuracy, supports a scalable analysis on a large number of applications, and successfully aids end-users' risk assessments.

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (공동주택 하자분류체계 기반 하자위험 평가)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • In general, defects cause a lot of maintenance costs and serious damage to various stakeholders, such as the owners, contractors or occupants of apartments. For this reason, a systematic and efficient defect management method is needed to minimize defect disputes. This paper derives a defect classification framework and proposes a defect risk assessment model for different types of defects. For this purpose, 6,000 defect items are allocated to the defect classification framework; these items are associated with 34 apartment projects over ten years old. As a result of this analysis, it was confirmed that the defect risks are concentrated in the areas of RC and finishing work. Based on these results, it is necessary to prevent the major risks of defects according to their priority. Based on this research, it is judged that further research to develop a method of managing the risks of defects may be necessary.

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

An Analysis on Declaration of the End of the Korean War: Opportunities and Risks (6·25전쟁 종전선언의 기회와 위험 분석: 안보의 시각)

  • Park, Hwee Rhak
    • Korean Journal of Legislative Studies
    • /
    • v.24 no.3
    • /
    • pp.55-83
    • /
    • 2018
  • This paper is written to identify the opportunities and risks of the declaration of the end of the Korean War with North Korea. The declaration has been seriously discussed in the course of negotiation for the denuclearization of North Korea especially in 2018. For this purpose, this paper revisits the concepts of related terms such as peace, peace regime, peace agreement and declaration of the end of war. It assesses the background and intention of North Korean request for the declaration. Then, it analyzes opportunities and risks regarding South Korea, if it agrees on the declaration. As a result, this paper found that declaration of the end of the Korean War could provide South Korea with opportunities such as a progress on the North Korean denuclearization, contribution to the peace regime on the Korean Peninsula and improvement on South Korea and North Korea relations. At the same time, the declaration could bring risks such as the dismantlement of the United Nations Command, demands of the withdrawal of US forces in Korea, a possible stop of North Korean denuclearization process and the weakening of South Korean peoples' awareness on North Korean threats. South Korea need to heed more on the risks than the opportunities, because the national security should be handled with caution.

Study on the Risk Factors of Construction Projects since COVID-19 (COVID-19가 건설프로젝트 리스크에 미치는 영향)

  • Lee, Jae-Hyun;Lee, Seong-Hyeon;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.4 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • COVID-19, which is currently in vogue, is a pandemic with the largest number of deaths since the establishment of the "World Health Organization". It is also expected to have a significant impact on countless construction projects. After COVID-19 hit the construction industry, the risk that they needed to cover, decreased every year. However, the prolonged COVID-19 increased the risks of air delays, material supply, and economic losses. The exact measurements will be needed to be identified and the risks of the current construction projects must have a mitigated risk with a greater proportion. Therefore, the purpose of this study is to analyze and identify the risks that have influenced construction projects to the domestic construction companies due to COVID-19. Based on the risks of the previous construction projects, risk case studies, and risks related to COVID-19, are extracted through surveys, weights. Each risk factor are calculated based on the AHP analysis technique. Thus, it is expected that the results of the risk research on construction projects will change due to COVID-19. It will be presented to cope with the current situation and later pandemic situations.