• 제목/요약/키워드: IT Project Selection

검색결과 357건 처리시간 0.026초

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • 차희성
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

청년 농업인 육성지원제도 개선을 위한 중요도-만족도 분석 (Importance-Satisfaction Analysis for Improvement of Young Farmers Fostering Support Policy)

  • 김진진;이소영
    • 현장농수산연구지
    • /
    • 제24권2호
    • /
    • pp.29-38
    • /
    • 2022
  • The purpose of this study is to understand the importance-satisfaction level for the improvement of the young farmers fostering support policy. According to the analysis result, the respondents answered that the current policy to foster young farmers is important. However, the actual satisfaction level of the project was found to be lower than the importance level. In the 'Keep up the Good Work' area, which is the first quadrant, 'a project to support young succession farmers and settling in farming' and 'a project to select and support succeeding agricultural managers'. It was found that the respondents highly evaluated the importance and satisfaction of the 'Young Succession Farmers Selection and Farm Settlement Support Project' and the 'Succession Farmers Selection and Support Project'. Therefore, it is necessary to gradually expand the project in the future.

IT서비스 기업에서의 네트워크 경영 관련 성과 요인에 대한 실증 연구 (The Empirical Analysis on the Performance of Inter-firm Network Management in the IT Service Firms)

  • 안연식
    • 한국IT서비스학회지
    • /
    • 제10권1호
    • /
    • pp.47-64
    • /
    • 2011
  • In the IT(Information Technology) service, which supply the solutions related to business management and IT, network construction and application trends, the related service business are increasing according to the enlargement of project scope and the diversity of project types as the need of service customers. In this paper, I propose the significant effect factors on the network management of IT service firms. The key findings are from the analysis result about 94 IT service firms as follows. For implementation the high performance of network management in the IT service firms, the strategic elements in the process of network construction are more conceived highly than the basic element in them. Also the perspective of project objectives are considered than the nominal perspectives in the partner selection process. The competency of partner firms', the cooperation process between the partner firms', network relation operation management and network relation structure management are the significant effect factors of network management.

광물자원 프로젝트의 기술성 및 경제성 평가 기법 (Technical and Financial evaluation for mineral project)

  • 조성준
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2009년도 특별 심포지엄
    • /
    • pp.101-118
    • /
    • 2009
  • In order to invest in overseas mineral projects, it is necessary to have a ability of technical and financial evaluation. Reserve estimation is the most important for mineral appraisal. Geostatistical evaluation of tonnage and grade promises more accurate reserve estimation than traditional methods such as polygon, inverse distance method and so on even if it has some uncertainty. Selection of a mining method and a mineral processing is also important because capex and opcosts of a mineral project is due to the selection. Mineral project is usually evaluated financially using NPV and IRR which are calculated through DCF(Discount Cash Flow). Uncertainty of a mineral project is analyzed statistically using sensitivity analysis and montecarlo simulation.

  • PDF

CIPP모형을 활용한 R&D과제기획 선정평가 도구 개발 연구 : K연구원 중심으로 (A Study on R&D Project Planning Selection Evaluation Indicators based on CIPP model)

  • 민현구
    • 기술혁신연구
    • /
    • 제31권3호
    • /
    • pp.171-199
    • /
    • 2023
  • 본 연구는 K연구원의 상향식 R&D과제기획 차원의 신규 연구기획과제 선정평가를 위한 평가도구 개발에 목적을 두고 진행하였다. 이를 위해 CIPP모형과 연구기획평가를 위한 선정평가 및 평가지표에 관한 선행연구를 중심으로 R&D과제기획 선정평가 항목과 문항을 개발 한 후, 2회에 걸친 델파이 조사를 실시하였다. 개발된 평가도구는 13명의 전문가를 대상으로 설문조사를 실시하여 내용타당도, 합의도 및 수렴도를 검증하였다. 최종 선정된 R&D과제기획 선정평가 도구는 8개 항목에 총 21개 문항으로, 상황평가 5 문항, 투입평가 2문항, 과정평가 8문항, 산출평가 6문항으로 구성되었다. 개발된 평가 도구는 상향식 기획 과정상의 문제점을 해소하고 연구자들의 기획역량을 제고하는 데 기여할 것이다. 또한, 선정평가 시 평가에 대한 일관성과 효율성 제고에 기여할 것이다.

한전 765 KV 송전선로 전선선정 검토의 기본 방향 (The conception of conductor selection for KEPCO 765 kV T/L.)

  • 구본묵;오창효;박영신
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 C
    • /
    • pp.1505-1508
    • /
    • 1994
  • Lately in KEPCO, the power plant capacity has increasingly become larger than before and it has become difficult to get R.O.W for T/L. Therefore KEPCO decided to increase its system voltage level from 345kV to 765kV. By doing this, KEPCO would like to expand its transmission capability by less T/L route. In 765kV system, we should consider various kinds of environmental impacts that can be neglected in lower voltage level. These environmental impacts are very important factor in T/L design. That can be changed greatly according to the selected conductor. And also conductor selection has relation with the economy of T/L construction directly. This paper deals with some general factors to be considered and basic principles about the conductor and ground wire selection for 765KV T/L with referring to the experiences of foreign utilities.

  • PDF

IT프로젝트 규모와 유형에 따른 IT투자 의사결정기준의 차이 (The Impact of IT Project Size and Types on IT Investment Decision Criteria)

  • 이국희
    • Journal of Information Technology Applications and Management
    • /
    • 제12권1호
    • /
    • pp.191-211
    • /
    • 2005
  • This study investigates the decision criteria used in the context of IT investment decision making and empirically analyzes the impact of IT project size and types on the importance of decision criteria. 5 criteria which have been extracted from the previous studies and industry practices are budget, financial benefits. strategic value. risk, and the degree of proposer's eagerness. Data of 120 IT project proposals have been collected from 5 companies including bank, insurance. and stock trading company. As results of ANOVA test. 7 out of 10 hypothesis have been accepted statistically. That is. the bigger the project size. the higher the evaluation weight of project budget and risk criteria and the lower the weight of proposer's eagerness. And in case of the infrastructure investment type. the emphasis is placed more on strategic value and risk criteria and less on financial benefit and proposer's eagerness. These findings provide insights for both IT practitioners and researchers.

  • PDF

지역의 산학협력 연구개발 지원 과제 선정을 위한 연구 (A Study for Selection of Regional Academia-Industrial R&D Project)

  • 공재현
    • 한국산학기술학회논문지
    • /
    • 제15권1호
    • /
    • pp.202-210
    • /
    • 2014
  • 본 연구의 주요 목적은 참여기업이 만족할 수 있는 지역 산학협력 R&D 과제를 선정하기 위한 지표를 발견하는데 있다. 기존의 산학협력 R&D 과제는 수요자인 참여기업에 대한 고려가 부족했다. 하지만, 우수한 연구 성과를 목표로 하는 연구개발 사업과는 달리 기업의 경쟁력 향상을 목표로 하는 지역 산학협력 R&D 과제의 경우 참여기업 중심의 과제 기획 및 선정이 필요하다. 따라서 본 연구에서는 산학협력 R&D 사업에 참여했던 기업들을 대상의 설문조사 결과를 기반으로 일원분산분석, 회귀분석 등의 통계적 분석을 통해 기업의 만족도에 영향을 미치는 요인들을 찾아내고 이를 선정기준으로 정리하였다. 연구결과 기업만족도에 영향을 미치는 요인으로는 협력시간, 사업화계획 수립시점, 기술이전 여부, 목표달성 수준 등이 있었으며, 이는 선정단계에서 구체적인 인원투입계획, 사업화 계획에 대한 평가가 필요하다는 것을 시사한다. 본 연구는 만족도를 사업 시스템 개선에 활용한 시도로서 의미가 있으며, 수요자 중심의 사업기획과 운영에 활용될 수 있기를 기대한다.

e-Science Project Selection에 관한 연구 (A Study for Project Selection of e-Science Application Research)

  • 이형진;변옥환;장행진
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2007년도 추계 종합학술대회 논문집
    • /
    • pp.265-269
    • /
    • 2007
  • 현재 e-Science에 대한 관심이 높아지면서, e-Science 사업의 성공적 추진을 위한 사업기획이 중요해지고 있다. 현재 대규모 투자가 필요한 e-Science의 성격상, e-Science 성숙단계, 추진방법, 과제의 특성 등에 따른 적절한 응용과제의 선정이 필요하다. 응용과제의 선정을 통해 연구과제를 IT기반으로 적용, 수행 할 수 있는 e-Science 관련요소기술의 개발, 인프라 연동계획 등 연구실시계획이 수립 될 수 있다. 본 연구에서는 e-Science 응용연구 과제 선정을 위한 후보 과제 풀을 국가연구개발사업 및 기술예측과제 등 유망 기술과제에서 도출, 과제의 선정평가를 위한 모형과 추진 방안을 논의해 본다.

  • PDF