• Title/Summary/Keyword: I-Chart

Search Result 230, Processing Time 0.034 seconds

Development of Design Chart for Investigating an Additional Rail Stress and Displacement on CWR(I) - Design Chart for High Speed Railway Bridge (장대레일 부가축력 및 변위 검토를 위한 설계차트 개발(I) - 고속철도 교량 설계차트)

  • Choi, Il-Yoon;Cho, Hyun-Cheol;Yang, Sin-Chu;Choi, Jin-Yu;Yu, Jin-Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.565-573
    • /
    • 2009
  • Displacement of the bridge and additional rail stress due to interaction between track and bridge should be limited to the design criteria. Interaction analysis was conducted to investigate the displacement and additional rail stress on CWR in high speed railway bridge. Particularly, various parameters affecting interaction phenomena were taken into account in the analysis to enhance an applicability. These parameters included configuration of structure, stiffness of deck and support, steel/concrete bridge, ballast/concrete track and FM/MFM type etc. The results were presented in the form of the design chart which could be useful in preliminary design of the bridge.

A Study on the Conformity of KS Standards according to Agreement on WTO/TBT (WTO/TBT 협정에 따른 KS 규격의 부합화에 관한 연구)

  • 김진규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.12-22
    • /
    • 2003
  • The purposes of this study are to investigate the conformity of Korean Standards(KS) according to agreement on WTO/TBT, and to propose systematic frameworks of preparation, adoption, and application for KS in our enterprises. Significant changes in this establishment, revision, and abrogation include the following divisions; i) statistics-vocabulary and symbols, ii) Shewhart control chart, iii) statistical interpretation of data, iv) sampling procedures for inspection by attributes, v) sequential sampling plans for inspection.

The Effect of Graphical Formats on Computer-Based Idea Generation Performance

  • Jung, Joung-Ho
    • The Journal of Information Systems
    • /
    • v.27 no.1
    • /
    • pp.153-169
    • /
    • 2018
  • Purpose Since human brains catch images faster than texts or numbers, infographics has been widely used in business in the form of "information dashboard" to enhance the efficiency of decision-making. Groupware, however, has neglected the adoption and use of infographics, in particular, in the idea generation process. Given that an overall performance of groupware-based idea generation is no better than that of the (paper-and-pencil-based) Nominal Group Technique, Jung et al. (2010) adopted the notion of infographics in the form of performance feedback to solve the productivity paradox. With the consistent results, which demonstrate beneficial effects of infographics on performance enhancement, an interesting observation that groups with the bar chart treatment performed better than groups with the dot chart treatment was made. The main purpose of this study was to find if there were a performance consistency between the outcomes from the previous study and the outcomes from the current study. Design/methodology/approach In experiment 1, we employed the same system used in the previous study (i.e., Jung et al., 2010). As individuals' contributions accumulated, the mechanism visually displayed individuals' performances two-dimensionally in the form of a bar chart or a dot chart. Then, we compared the performance outcomes from this study to the outcomes from previous study (i.e., Jung et al., 2010). In experiment 2, we modified the performance graph to test the effect of "playfulness" on performance by converting dots to car images. Then, we compared the performance outcome from experiment 2 to the outcomes from experiment 1. Findings Just like our interesting (and unexpected) finding in Jung et al.'s study (2010), the outcome confirmed a consistent superior performance of a bar chart. This implies that a bar chart is a better choice when stimulating performance with a visual aid in the context of groupware-based idea generation. Although a bar chart was criticized in a way that errors of length-area judgments are 40 ~ 250% greater than those of positional judgments along a common scale, such illusion turned out to be facilitating upward performance comparison better. Regarding Experiment 2, the outcome showed that the revised-dot graph is as good as the bar graph in terms of quantity and quality score of ideas. We attribute the performance enhancement of the resized-dot to the interaction between the motivational characteristic and the situational characteristic of playfulness because individuals in the revised-dot graph treatment performed better than individuals in the dot graph treatment. Given the order of performance (Bar >= Revised Dot > Dot) that the revised-dot treatment performed the same as (or lower than) the bar treatment, an additional research is warranted to reach to a consistent outcome.

The Design of a neural network control chart using X-R statistics in start-up process (초기공정에서 X-R 통계량을 이용한 신경망 관리도 설계)

  • 지선수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.66
    • /
    • pp.19-26
    • /
    • 2001
  • I propose the control chart pattern to provide a more comprehensive scheme for detecting process X and R shifts using individual observations in start-up process. It is important to automate the identification of special disturbances to facilitate real-time manufacturing. This papers formulates X-R charts for interpretation by artificial neural networks. In this papers, which uses the backpropagation algorithm, two samples are fed into the trained neural network to provide outputs ranging from 0 to 1. Simulation results sow that the performance of the proposed control chart using the neural network(NNCC) is quite promising. Using these NN charts, guidelines are given for detecting and classifying process X and R shifts.

  • PDF

Growth Chart for Growth-Assesment of Down Syndrome in Korea (다운증후군아동의 건강지도를 위한 발육차트의 작성)

  • 박천만
    • Korean Journal of Health Education and Promotion
    • /
    • v.15 no.1
    • /
    • pp.97-114
    • /
    • 1998
  • This study's purpose is to clarify the growth pattern of Down Syndrome cases -particulary centering on the adolescent growth pattern - and to draw up a standard growth chart on body height and weight which is one estimation of physical growth for the effective caring of their health. I sampled 269 Down syndrome cases (Male 151, Female 118) whose ages ranged from 6 years of age to adulthood and 348 normal control cases (Male 175, Female 173) who were in same age group with Down Syndrome. We also picked 124 Down syndromes cases(Male 70, Female 54) and gathered 8 year longitudinal data on their body height and weight. The results were that, I found Down syndrome cases' height to be short and their weight to be overweight. As far as age at peak height velocity was concerned, boys were at 11-12 years of age and girls were at 10-11 years of age, showing that girls were about one year faster. Peak height velocity was 6.8cm/yr for boys and 5.4cm/yr for girls. The age at peak weight velocity were 12-13 years for age for boys and 10-11 years of age for girls. Peak weight velocity was 5.7kg/yr for boys and 4.3kg/yr for girls. The menarche age of girls with Down syndrome was anticipated to come about 2 years after peak height velocity and peak weight velocity. Finally, we drew up a standard growth chart and compared it with that of the NCHS, which caused us to come to the conclusion that the Standard Growth Chart for Down syndrome cases in Korea that came out of this study was appropriate for the growth-assesment of Down syndrome.

  • PDF

Adjustment of Control Limits for Geometric Charts

  • Kim, Byung Jun;Lee, Jaeheon
    • Communications for Statistical Applications and Methods
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2015
  • The geometric chart has proven more effective than Shewhart p or np charts to monitor the proportion nonconforming in high-quality processes. Implementing a geometric chart commonly requires the assumption that the in-control proportion nonconforming is known or accurately estimated. However, accurate parameter estimation is very difficult and may require a larger sample size than that available in practice in high-quality process where the proportion of nonconforming items is very small. Thus, the error in the parameter estimation increases and may lead to deterioration in the performance of the control chart if a sample size is inadequate. We suggest adjusting the control limits in order to improve the performance when a sample size is insufficient to estimate the parameter. We propose a linear function for the adjustment constant, which is a function of the sample size, the number of nonconforming items in a sample, and the false alarm rate. We also compare the performance of the geometric charts without and with adjustment using the expected value of the average run length (ARL) and the standard deviation of the ARL (SDARL).

Multivariate control charts for monitoring correlation coefficients in dispersion matrix

  • Chang, Duk-Joon;Heo, Sun-Yeong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.23 no.5
    • /
    • pp.1037-1044
    • /
    • 2012
  • Multivariate control charts for effectively monitoring every component in the dispersion matrix of multivariate normal process are considered. Through the numerical results, we noticed that the multivariate control charts based on sample statistic $V_i$ by Hotelling or $W_i$ by Alt do not work effectively when the correlation coefficient components in dispersion matrix are increased. We propose a combined procedure monitoring every component of dispersion matrix, which operates simultaneously both control charts, a chart controlling variance components and a chart controlling correlation coefficients. Our numerical results show that the proposed combined procedure is efficient for detecting changes in both variances and correlation coefficients of dispersion matrix.

Crack Growth Analysis and Crack Arrest Design of Stiffened Panels(I) - Numerical Approaches to Crack Arrest Design Chart (보강판의 균열거동해석과 Crack Arrest 설계(I) - Crack Arrest 설계기준의 수치해석)

  • Rhee, Eui-Jong;Rhee, Hwan-Woo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.4 no.2
    • /
    • pp.43-49
    • /
    • 2005
  • The purpose of a fatigue crack arrest design is to prevent a fatigue fracture of machine and structure resulted from unstable crack growth. In all cases of load transfer to second elements such as stringers, doublers or flanges, crack arrest is possible; arrest occurring when the fatigue crack reaches the second element. In the present work, a numerical analysis was carried out to estimate the effect of shape parameters on fatigue crack growth and arrest behavior of integrally stiffened panels. Based on these results, a set of fatigue crack arrest design chart is presented as "non-dimensional arrest load - thickness ratio" relationship.

  • PDF

A Study on dart manipulation of women`s front bodice by CAD System(I)-the comparison automatic manopulating functions of dart in CAD system and the classification the dart of women`s front bodice- (CAD시스템을 이용한 앞길의 다트변형에 관한 연구(I)-CAD의 다트 자종변환기능의 비교분석 및 앞길 다트 분류를 중심으로-)

  • 조영아
    • Journal of the Korean Home Economics Association
    • /
    • v.34 no.5
    • /
    • pp.249-264
    • /
    • 1996
  • The purpose of this study was to investigate automatic manipulating functions of dart of CAD system, and to classify the dart of women's front bodice. The results from this study: 1.3 CAD systems, were compared in automatic manipulating functions of dart. Gerber system & Investronica system were based on the pivot-method of dart manipulating, Yuka system was based on the slash-method. 2. It is classified and made a dart-design chart with using darts, which were as examples related to dart manipulating in text & reference of the pattern design. 3. In case of education of dart manipulation, the classified dart-design chart provides variations of a basic pattern through dart manipulation.

  • PDF

The effect of parameter estimation on $\bar{X}$ charts based on the median run length ($\bar{X}$ 관리도에서 런길이의 중위수에 기초한 모수 추정의 영향)

  • Lee, Yoojin;Lee, Jaeheon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.27 no.6
    • /
    • pp.1487-1498
    • /
    • 2016
  • In monitoring a process, in-control process parameters must be estimated from the Phase I data. When we design the control chart based on the estimated process parameters, the control limits are usually chosen to satisfy a specific in-control average run length (ARL). However, as the run length distribution is skewed when the process is either in-control or out-of-control, the median run length (MRL) can be used as alternative measure instead of the ARL. In this paper, we evaluate the performance of Shewhart $\bar{X}$ chart with estimated parameters in terms of the average of median run length (AMRL) and the standard deviation of MRL (SDMRL) metrics. In simualtion study, the grand sample mean is used as a process mean estimator, and several competing process standard deviation estimators are used to evaluate the in-control performance for various amounts of Phase I data.