• Title/Summary/Keyword: High-rise building fire

Search Result 268, Processing Time 0.021 seconds

The Thermal Analysis of Pole Mount Mold Transformer with One-body Molding by Duct Condition (일체형 주상용 몰드 변압기의 덕트에 따른 열해석 특성 연구)

  • 조한구;이운용;박영두
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.17 no.3
    • /
    • pp.348-352
    • /
    • 2004
  • The mold transformers have been widely used in underground substations in large building and have some advantages in comparison to oil-transformer, that is low fire risk, excellent environmental compatibility, compact size and high reliability. In addition, the application of mold transformer for outdoor is possible due to development of epoxy resin. The mold transformer generally has cooling duct between low voltage coil and high voltage coil. A mold transformer made by one body molding method has been developed for small size and ow loss, but it needs some cooling method because heat radiation between each winding is difficult. The life of transformer is significantly dependent on the thermal behavior in windings. Many transformer designers have calculated temperature distribution and hot spot point by finite element method(FEM) to analyze winding temperature rise. In this paper, The thermal analysis of pole mount mold transformer with one body molding by duct condition is investigated and the test result of temperature rise is compared with simulation data.

Economic and Evacuation Time Analysis of Horizontally-installed Indoor Emergency Exit (하향식 피난구의 경제성 및 피난 소요시간 분석)

  • Liu, Yue;Kim, Sun-Kuk;Kim, Ki-Hyuk;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.363-373
    • /
    • 2018
  • Evacuation facilities are installed so that people can evacuate high-rise apartment houses when it is impossible to escape fire through the front door. The households of apartment houses may escape the building in two ways, which will reduce loss of lives. This study examined the characteristics of two-way evacuation facilities, including a light-weight partition wall, shelter space at the balcony and horizontally-installed indoor emergency exit. Then, it proposed a horizontally-installed outdoor emergency exit that improved the problems of the examined facility types, and analyzed its economic-feasibility. When a horizontally-installed emergency exit instead of a traditional type to escape from fire is used, people may be more autonomous in deciding whether active evacuation is possible or not. Thus, the time required to evacuate the building with 4 different evacuation methods using the stairs and horizontally-installed emergency exit was simulated in consideration of the impact of evacuation methods that people choose on the time required for evacuation using pathfinder. Then, the simulation results were compared and analyzed. Any appropriate evacuation method to reduce the time required for evacuation was predicted, analyzed and decided. As a result of this study, it was analyzed that the high - rise apartment top - down type evacuation zone can shorten the total evacuation time compared to the staircase type.

Smoke Control Performance of a Serial Structure Using "CONTAM" (CONTAM을 이용한 직렬형태 구조의 제연성능 구현에 관한 연구)

  • Kim, Mi-Seon;Seo, Dong-Gil;Gu, Seon-Hwan;Yoo, Young-Min;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.33 no.6
    • /
    • pp.53-62
    • /
    • 2019
  • A recent trend shows that more buildings are being constructed as mixed-use (residential and commercial) properties for efficient land use. This has led to an increased frequency in the occurrence of fires and the associated potential risks. In particular, in case of high-rise apartments, at least one of the elevators in each building is installed for evacuation purposes separately from the emergency elevator; therefore, for a combined ancillary room and emergency elevator platform situation, the structure is inevitably in series with the evacuation elevator platform. Thus, a proposal for a new type of ventilation zone based on existing national fire safety codes is required to achieve smoke control performance. To this end, the air egress velocity and differential pressure of each ventilation zone are checked using the "CONTAM" software; further, an alternative is proposed to secure smoke control performance for series structures.

A Study on Establishment of Performance-Based Design Direction through Analysis of Expert Survey (전문가 설문조사를 통한 국내 성능위주설계 개선 방향설정에 관한 연구)

  • Jeong, Hye-Min;Hong, Won-Hwa;Son, Jong-Yeong;Jeon, Gyu-Yeob
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.2
    • /
    • pp.23-31
    • /
    • 2018
  • In recent years, as the development of construction technology and population increase, buildings are becoming more complex and high-rise. These large scale buildings are difficult to secure fire and evacuation safety when fire occurs. So it is necessary to prepare specific measures. According to this situation, in 2011, Republic of Korea officially launched Performance-based Design in "Fire-fighting system Installation business Act". But even 6 years passed since the enforcement, there are still faces manifold problems in the course of implementation. In order to examine the necessary improvements, in this study, I conducted interviews and questionnaires with experts, investigated the improvement items under current laws. And draw up a measures for that items. The subjects of the survey were fire-fighting officer, professional engineer fire fighting, fire protection planner and professor in Daegu. As a result of twice surveys, a total of 19 items are derived. And then compared and analyzed the criteria of overseas countries, and suggested improvement directions for final items. In addition, conducted a third questionnaire survey on the proposed improvement direction to verify the appropriateness of the alternative. The results of this study will be used as basic data to deal with the general problems of performance-based design in future, and further study on each item will be needed.

Characteristics of Air Egress Velocity in Vestibule Pressurization System Using the Fire Dynamics Simulator (FDS를 이용한 특별피난계단 부속실 제연설비의 방연풍속 기류특성)

  • Ryu, Sung-Ho;Lee, Su-Kyung;Hong, Dae-Hwa;Choi, Keum-Ran
    • Fire Science and Engineering
    • /
    • v.24 no.6
    • /
    • pp.153-159
    • /
    • 2010
  • In this study, we confirmed the fact that air egress velocity of pressure differential system installed at vestibule of smokeproof stairway in domestic high-rise building becomes back-flow to stair-lobby at upper vestibule. Rather it do not back-flow to the livingroom. when fire occur and the door opens to escape from fire zone. so we carry out actual and computational fluid dynamics measurement. In the case upward 45 gradient of supply damper's blade, The simulation results that air flow of upper vestible is steady but back-flow phenomenon occurred at the bottom. However, in the case of $4m^2$, direction of the flow was ideal to living room. If a vestibule’s area is smaller, it must be designed and built according to performance-based design.

The Study of a Correlation between Heat Release and Smoke Production by Using Oxygen Consumption Calorimeter Up to 10 MW Facility (10MW급 까지의 산소소모율법 칼로리미터를 활용한 열방출률과 연기발생률의 상관성에 관한 연구)

  • Ryu, Sang-Hoon;Yoo, Yong-Ho;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.58-65
    • /
    • 2010
  • The fire accidents having recently occurred are getting more and more larger and causing lots of damage in terms of property loss and casualties increase, so there is in need of technical fire safety development like comprehensive prevention solution in order to effectively prevent. Especially, the needing of new paradigm for advanced fire safe technology is gathering strength in high-rise modern building construction. Therefore, we want to find out on this paper what is a correlation between heat release rate measurement and smoke release volume by three parts of oxygen consumption calorimeter in bench scale calorimeter (cone calorimeter/ISO 5660/Avg.500Kw), Medium scale calorimeter (Room corner tester, Single burning Item/ISO 9750, EN 13823/Avg.3MW), and large scale calorimeter (Industry calorimeter/Avg. 10MW). Thus, Smoke detective of new paradigm devised by making use of a correlation between heat release and smoke production is to help reduce loss property and casualties. Ultimately, based on this theory, a new concept of fire alarm and evacuation system will be developed and expected to apply to a skyscraper.

Winter to replace the hydraulic test and pneumatic test comparative analysis of study on the optimal pressure (동절기 수압시험을 대체하는 공기압시험의 적정압력 비교분석에 관한 연구)

  • Kwoun, Young-Hee;Hwang, Dong-Hwan;Kim, Tae-Gil;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.211-216
    • /
    • 2014
  • Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.

A Study on the Evacuation Risk of Simultaneous Fires from Exterior (외장재에 의한 동시다발적인 화재의 피난위험성에 관한 연구)

  • Min, Se-Hong
    • Fire Science and Engineering
    • /
    • v.26 no.4
    • /
    • pp.48-54
    • /
    • 2012
  • In order to study on the evacuation risk when connate fires caused by vertical fire spread of the exterior occurs, the egress simulations based on the relevant scenarios has carried out. As a result of it, ASET (permitted evacuation time) was reached in between 550 to 650 seconds in entire floors after vertical smoke spread from fire of combustible exteriors. In particular, ASET was 358 seconds in the first floor, 490 seconds in the six floor and 473 seconds in the tenth floor. In addition, five floors of all levels, the 1st floor, the 6th floor and the 28th floor ~30th floor, show RSET (minimum evacuation time) which is bigger than ASET as evacuation risk. This result presents occupants in high rise buildings with more than 15 floors might not be able to egress of them using staircases due to huge population attempting to evacuate simultaneously. Particularly, 699 people in the upper levels by smoke from the first floor are having difficulty escaping this building since ASET on the first floor adjacent to the ignition point was 358 seconds which is relatively reached fast. Considering a prevention method of the fire and smoke spread, architects have to use non-combustible exterior in the building's facade to be required as an active fire protection system.

An Experimental Study on the Estimation for the Flow Coefficient of Elevator Hoistway (엘리베이터 승강로의 유량계수 산정에 관한 실험 연구)

  • Kim, Hak-Joong
    • Fire Science and Engineering
    • /
    • v.26 no.1
    • /
    • pp.43-48
    • /
    • 2012
  • Recently, evacuation safety of building resident become the major concern, as the building has been higher and more complicated. Required evacuation time using stairway is longer in high-rise buildings, moreover it is impossible for the disabled to evacuate by using stairway. For this reason the study on the effectiveness of using elevator for evacuation is progressing. This study shows the flow coefficient of hoistway when elevator is moving. The results of this study can be used for the study of elevator piston effect as basic data. Experiments were performed in 5 different hoistways at 3-story and 2-story buildings. According to the result of flow coefficient experiments, average flow coefficient is 0.954. Considering the $4{\sigma}$ to guarantee 99.99 % reliance, it is 0.86. This result is 3.6 % bigger than 0.83 that Klote and Tamura suggested. It represents that the maximum critical pressure is decreased about 7 % on the same condition of elevator and elevator shaft. When the smoke control performance of high-rise building is evaluated, the result is significant economically by applying a more realistic and less value of elevator piston effect.

A Review and Analysis of the Thermal Exposure in Large Compartment Fire Experiments

  • Gupta, Vinny;Hidalgo, Juan P.;Lange, David;Cowlard, Adam;Abecassis-Empis, Cecilia;Torero, Jose L.
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.345-364
    • /
    • 2021
  • Developments in the understanding of fire behaviour for large open-plan spaces typical of tall buildings have been greatly outpaced by the rate at which these buildings are being constructed and their characteristics changed. Numerous high-profile fire-induced failures have highlighted the inadequacy of existing tools and standards for fire engineering when applied to highly-optimised modern tall buildings. With the continued increase in height and complexity of tall buildings, the risk to the occupants from fire-induced structural collapse increases, thus understanding the performance of complex structural systems under fire exposure is imperative. Therefore, an accurate representation of the design fire for open-plan compartments is required for the purposes of design. This will allow for knowledge-driven, quantifiable factors of safety to be used in the design of highly optimised modern tall buildings. In this paper, we review the state-of-the-art experimental research on large open-plan compartment fires from the past three decades. We have assimilated results collected from 37 large-scale compartment fire experiments of the open-plan type conducted from 1993 to 2019, covering a range of compartment and fuel characteristics. Spatial and temporal distributions of the heat fluxes imposed on compartment ceilings are estimated from the data. The complexity of the compartment fire dynamics is highlighted by the large differences in the data collected, which currently complicates the development of engineering tools based on physical models. Despite the large variability, this analysis shows that the orders of magnitude of the thermal exposure are defined by the ratio of flame spread and burnout front velocities (VS / VBO), which enables the grouping of open-plan compartment fires into three distinct modes of fire spread. Each mode is found to exhibit a characteristic order of magnitude and temporal distribution of thermal exposure. The results show that the magnitude of the thermal exposure for each mode are not consistent with existing performance-based design models, nevertheless, our analysis offers a new pathway for defining thermal exposure from realistic fire scenarios in large open-plan compartments.