• Title/Summary/Keyword: Generation scheduling

Search Result 265, Processing Time 0.027 seconds

Modeling Generators Maintenance Outage Based on the Probabilistic Method (발전기 보수정지를 고려한 확률적 발전모델링)

  • Kim, Jin-Ho;Park, Jong-Bae;Park, Jong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.804-806
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are new iy defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

  • PDF

PV Power Prediction Models for City Energy Management System based on Weather Forecast Information (기상정보를 활용한 도시규모-EMS용 태양광 발전량 예측모델)

  • Eum, Ji-Young;Choi, Hyeong-Jin;Cho, Soo-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.393-398
    • /
    • 2015
  • City or Community-scale Energy Management System(CEMS) is used to reduce the total energy consumed in the city by arranging the energy resources efficiently at the planning stage and controlling them economically at the operating stage. Of the operational functions of the CEMS, generation forecasting of renewable energy resources is an essential feature for the effective supply scheduling. This is because it can develop daily operating schedules of controllable generators in the city (e.g. diesel turbine, micro-gas turbine, ESS, CHP and so on) in order to minimize the inflow of the external power supply system, considering the amount of power generated by the uncontrollable renewable energy resources. This paper is written to introduce numerical models for photo-voltaic power generation prediction based on the weather forecasting information. Unlike the conventional methods using the average radiation or average utilization rate, the proposed models are developed for CEMS applications using the realtime weather forecast information provided by the National Weather Service.

A Heuristic Approach for Material Collection System by Multiple Mobile Robot Agents (휴리스틱 접근법에 의한 다수 이동 로봇 에이전트를 이용한 물질 수집 시스템)

  • Lee, Young-Dae;Kim, Sik
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2001.11a
    • /
    • pp.890-895
    • /
    • 2001
  • In this paper, we address on the problem of automatic scheduling and motion generation of multiple mobile robots fur collecting material parts. We propose a model and so]union algorithm for the system. The formulated problem is divided into two kinds of problems; assignment problem and planning problem of robot motion. In this paper, several approaches to solution methods are presented and compared through computer simulation.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

An Optimization of Ship Building Mix under N Different Docks (N개의 다른 도크를 고려한 선박 건조 혼합의 최적화)

  • Kim, Yearn-Min
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.38-43
    • /
    • 2009
  • This paper deals with two most important problems, from both practical and theoretical standpoints, arising when building the ships in N different docks. Such docks have become core components of modern ship construction. One problem is to minimize the number of building docks in the shipyard, while the other is to keep the usage rate of resources fed into docks as constant as possible. In this paper the combined problem is formulated as a single-integer programming model. The LP-relaxation of this model is solved by column-generation techniques. Practical applications of this formulation are also discussed.

A Study on the Optimal Weakly Operation Planning of Pumped Hydrostorage Plant (함수발전기의 주간운용계열에 관한 연구)

  • 송길영;김영태
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.34 no.5
    • /
    • pp.193-200
    • /
    • 1985
  • Increased attention has been given in recent years to the use of pumped hydrostorage plant to meet the requirements for peak generation and bottom pumping. Once a pumped hydrostorage plant is installed, its economic operation as an integral component of a steam generating system requires the selection of a pumping and generating schedule which will result in the most effective use of the hydro generating capacity. The general object of coordination of pumped hydrostorage plants with electric power system is the minimization of the overall procduction cost and the maximization of generation reserves. This paper presents a method for the optimal scheduling of pumped hydrostorage plant and a computer program which determines weekly operating schedules for a pumped hydrostorage plant by dynamic programming method.

  • PDF

A Game Theoretic Cross-Layer Design for Resource Allocation in Heterogeneous OFDMA Networks

  • Zarakovitis, Charilaos C.;Nikolaros, Ilias G.;Ni, Qiang
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.1 no.1
    • /
    • pp.50-64
    • /
    • 2012
  • Quality of Service (QoS) and fairness considerations are undoubtedly essential parameters that need to be considered in the design of next generation scheduling algorithms. This work presents a novel game theoretic cross-layer design that offers optimal allocation of wireless resources to heterogeneous services in Orthogonal Frequency Division Multiple Access (OFDMA) networks. The method is based on the Axioms of the Symmetric Nash Bargaining Solution (S-NBS) concept used in cooperative game theory that provides Pareto optimality and symmetrically fair resource distribution. The proposed strategies are determined via convex optimization based on a new solution methodology and by the transformation of the subcarrier indexes by means of time-sharing. Simulation comparisons to relevant schemes in the literature show that the proposed design can be successfully employed to typify ideal resource allocation for next-generation broadband wireless systems by providing enhanced performance in terms of queuing delay, fairness provisions, QoS support, and power consumption, as well as a comparable total throughput.

  • PDF

Optimal Generation and Demand Response Scheduling by Using the Transformation of Demand Resources To Virtual Generation (수요 자원의 가상 발전기로의 변환을 이용한 최적의 수요 반응 및 발전 운영 계획 수립)

  • Kwag, Hyung-Geun;Woo, Sang-Min;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.594-595
    • /
    • 2011
  • 본 논문에서 수요 자원의 수요 반응 프로그램 참여에 관한 정보들을 등록 정보와 참여 정보로 구분하여 수요 자원의 특성을 나타내는 지수들로 구분한다. 이 지수들은 수요 반응 참여 가능 용량, 기간, 횟수, 한계 비용에 관하여 정보를 제공하며 이들을 바탕으로 수요 자원을 하나의 발전 자원으로 평가한다. 이로써 수요 자원은 발전 자원과 직접적으로 경쟁할 수 있으며 계통 운영자는 수요 자원을 운영 계획에 포함한다. 계통 운영자는 발전 및 수요 반응 비용을 최소화하여 운영 계획을 수행하는데 이때 발전 자원과 수요 자원의 제약 조건을 위반하지 않아야 한다. 본 논문에는 기존 개발된 발전 자원의 제약 조건으로부터 수요 자원의 제약 조건을 제안한다.

  • PDF

The approach for supporting synchronous Ethernet in 10G EPON

  • Cho, Jeong-Hyun;Ahn, Cheol-Woong;Chang, Yong-Suk
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.18 no.6
    • /
    • pp.39-49
    • /
    • 2013
  • In recent, many countries and research institutes have been studying how to construct the high-speed subscriber access network. Task Force team of IEEE 802.3ah has accomplished the standardization of EPON which is the next generation subscriber access network. EPON doesn't still have the bandwidth enough to support the new service(e.g various multimedia service) which demands the high bandwidth. For these new multimedia services,10G EPON is the next generation subscriber access network which expanded the up-down bandwidth range of 1G EPON 10 times in order to support demanding high bandwidth. We have proposed the model which can accommodate IEEE 802.1 AVB traffics smoothly in 10G EPON and suggesting the Intra-ONU scheduling model which makes this model operate effectively.

Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader - (신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 -)

  • Hwang Seong Hwan;Kim Yu Rim;Kang Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.