A Study on Energy Storage System(ESS) Application for Dynamic Stability Improvement and Generation Constraint Reduction (대규모 발전단지 상시제약 감소를 위한 에너지 저장장치(ESS) 적용에 관한 연구)

  • Lee, Jae-Gul;Jung, Solyung;Choi, Jang-Hum;Kim, Yong-Hak;Yoon, Yong-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.11
    • /
    • pp.1554-1560
    • /
    • 2017
  • Prepare a lose of 765kV transmission route in power system operation condition, there are some Special Protection Scheme(SPS)s in Korean power system. These SPS can make some preselected generators are tripped to avoid generator overspeed. Because of many of the new large power plants are installed to existing power generation sites due to the siting problem, the number of generator tripped by SPS should be increased. But that can be a cause of system frequency change under the Under Frequency Relay(UFR) 1st pickup level 59.0Hz. Therefore generation constraint should be considered until new transmission lines are installed. In this paper, we propose the ESS application for generation constraint mitigation by frequency damping control of ESS. To analysis an effect of ESS application, we use PSS/E dynamic simulation tool, CBEST model and controller model. The proposed ESS application is applied to the empirical Korean power system.

Pedagogically-Driven Courseware Content Generation for Intelligent Tutoring Systems

  • Hadji, Hend Ben;Choi, Ho-Jin;Jemni, Mohamed
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.12 no.1
    • /
    • pp.77-85
    • /
    • 2012
  • This paper describes a novel approach to adaptive courseware generation. This approach adopts its structure from existing intelligent tutoring systems and introduces a new component called pedagogical scenario model to support pedagogical flexibility in the adaptation process of courseware generation system. The adaptation is carried out using Dynamic Constraint Satisfaction Problem framework, which is a variant of classical Constraint Satisfaction Problem, to deliver courseware tailored to individual learner. Such a framework provides a high level of expressiveness to deal with the particular characteristics of courseware generation problem. Further, it automatically designs a sound courseware satisfying the design constraints imposed by the domain, the pedagogical scenario and learner models.

A Study on the Development of Critical Transmission Operating Constraint Prediction (CTOCP) System With High Wind Power Penetration (대규모 풍력발전 계통 연계시 주요 송전망 제약예측시스템 개발에 관한 연구)

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.86-93
    • /
    • 2015
  • Globally, wind power development is experiencing dramatic growth and wind power penetration levels are increasing. Wind generation is highly variable in time and space and it doesn't guarantee the system reliability and secure system operation. As wind power capacity becomes a significant portion of total generation capacity, the reliability assessment for wind power are therefore needed. At present, this operational reliability assessment is focusing on a generation adequacy perspective and does not consider transmission reliability issues. In this paper, we propose the critical transmission operating constraint prediction(CTOCP) system with high wind power penetration to enhance transmission reliability.

An Analytical Effects of Maximum Quantity Constraint on the Nash Solution in the Uniform Price Auction (발전기 최대용량 제약이 현물시장의 내쉬균형에 미치는 영향에 대한 해석적 분석)

  • 김진호;박종배;박종근
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.6
    • /
    • pp.340-346
    • /
    • 2003
  • This paper presents a game theory application for an analysis of uniform price auction in a simplified competitive electricity market and analyzes the properties of Nash equilibrium for various conditions. We have assumed that each generation firm submits his bid to a market in the form of a sealed bid and the market is operated as a uniform price auction. Two firms are supposed to be the players of the market, and we consider the maximum generation quantity constraint of one firm only. The system demand is assumed to have a linear relationship with market clearing prices and the bidding curve of each firm, representing the price at which he has a willingness to sell his generation quantity, is also assumed to have a linear function. In this paper, we analyze the effects of maximum generation quantity constraints on the Nash equilibrium of the uniform price auction. A simple numerical example with two generation firms is demonstrated to show the basic idea of the proposed methodology.

Synthesis of four-bar linkage motion generation using optimization algorithms

  • Phukaokaew, Wisanu;Sleesongsom, Suwin;Panagant, Natee;Bureerat, Sujin
    • Advances in Computational Design
    • /
    • v.4 no.3
    • /
    • pp.197-210
    • /
    • 2019
  • Motion generation of a four-bar linkage is a type of mechanism synthesis that has a wide range of applications such as a pick-and-place operation in manufacturing. In this research, the use of meta-heuristics for motion generation of a four-bar linkage is demonstrated. Three problems of motion generation were posed as a constrained optimization probably using the weighted sum technique to handle two types of tracking errors. A simple penalty function technique was used to deal with design constraints while three meta-heuristics including differential evolution (DE), self-adaptive differential evolution (JADE) and teaching learning based optimization (TLBO) were employed to solve the problems. Comparative results and the effect of the constraint handling technique are illustrated and discussed.

KTX Trainset Maintenance Routing and Allocation System for Korea High-Speed Rail (한국고속철도를 위한 차량운용 및 할당시스템)

  • Hong Soon-Hum;Kim Seongho
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.391-397
    • /
    • 2005
  • In this paper we present a model for the maintenance routing construction and the trainset allocation (maintenance routing problem). The model solves the maintenance routing problem using column generation algorithm which was used to combine constraint programming and linear programming. Ilog-cplex was used to solve the linear programming model and Ilog-solver was used to solve the constraint programming model. The computational experience is also provided.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Near-Minimum-Time Cornering Trajectory Planning and Control for Differential Wheeled Mobile Robots with Motor Actuation Voltage Constraint (차륜 이동 로봇의 모터 구동 전압 제한 조건을 고려한 코너링(cornering) 모션의 최소 시간 궤적 계획 및 제어)

  • Byeon, Yong-Jin;Kim, Byung-Kook
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.9
    • /
    • pp.845-853
    • /
    • 2012
  • We propose time-optimal cornering motion trajectory planning and control algorithms for differential wheeled mobile robot with motor actuating voltage constraint, under piecewise constant control input condition. For time-optimal cornering trajectory generation, 1) we considered mobile robot's dynamics including actuator motors, 2) divided the cornering trajectory into one liner section, followed by two cornering section with angular acceleration and deceleration, and finally one liner section, and 3) formulated an efficient trajectory generation algorithm satisfying the bang-bang control principle. Also we proposed an efficient trajectory control algorithm and implemented with an X-bot to prove the performance.

Scheduling Algorithms with Transmit Power Constraint fer CDMA Packet Services

  • Minjoung Sheen;Lee, Seungbeom;Park, Sin-Chong
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1721-1723
    • /
    • 2002
  • In 3rd-generation mobile communication systems providing packet service, optimal scheduling algorithms we needed to increase service efficiency. In this paper, three scheduling algorithms (SP, EDF, and RPQ) which have been studied in the field of computer networks are applied with transmit power constraint to an interference-limited CDMA system, proving to be efficient.

  • PDF

Failure Assessment Diagrams of Semi-Elliptical Surface Crack with Constraint Effect (구속상태를 고려한 반타원 표면균열의 파손평가선도)

  • Seo, Heon;Han, Tae-Su;Lee, Hyeong-Il
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.23 no.11 s.170
    • /
    • pp.2022-2032
    • /
    • 1999
  • In recent years, the subject of remaining life assessment has drawn considerable attention in the power generation industry. In power generation systems a variety of structural components, such as steam pipes, turbine rotors, and superheater headers, typically operate at high temperatures and high pressures. Thus a life prediction methodology accounting for fracture and rupture is increasingly needed for these components. For accurate failure assessment, in addition to the single parameter such as K or J-integral used in traditional fracture mechanics, the second parameter like T-stress describing the constraint is needed. The most critical defects in such structures are generally found in the form of semi-elliptical surface cracks in the welded piping-joints. In this work, selecting the structures of surface-cracked plate and straight pipe, we first perform line-spring finite element modeling, and accompanying elastic-plastic finite element analyses. We then present a framework for including constraint effects (T-stress effects) in the R6 failure assessment diagram approach for fracture assessment.