• Title/Summary/Keyword: Foreign Construction

Search Result 929, Processing Time 0.026 seconds

THE SUCCESS FACTORS OF PARTNERING IN THE SOUTH KOREA PM&CM MARKET

  • Bok-Nam Lee;Hyoun-Seung Jang;Seok-In Choi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.737-743
    • /
    • 2005
  • Since the designation of the South Korean Construction industry as an open market industry by the World Trade Organization (WTO) in 1994, South Korea's construction firms were exposed to competition from firms of other advanced countries. Increased competition in the industry raised quality of production and lowered the cost of construction projects. Therefore, many big construction projects were planned and constructed with foreign construction partners during the last decade. Also, from those projects the South Korea Construction industry accumulated experience in and knowledge of both project management and construction management perspectives. However, in the process of conducting those big projects, many problems - specifically responsibility and the limit of competence - occurred between foreign construction partners. Hence, this study attempts to improve its role model that is for local and foreign companies to enter into Joint Ventures in the South Korea construction industry.

  • PDF

Survey on the Actual Condition and the Improvement Factors of Foreign Workers at the Construction Site. (건설현장 외국인근로 실태조사 및 개선요소 도출)

  • Baek, Nak-Ku;Hong, Jun-Pyo;Lim, Hyoung-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.136-145
    • /
    • 2018
  • Companies that have suffered serious labor shortages are relocating their factories abroad where they can solve this problem by increasing the employment of foreign workers. Construction sites also employ foreign workers to supplement the scarce manpower, and the demand for foreign workers has been gradually increasing over time. Recently, based on discussions on whether or not to introduce foreign workers, the policy on the input of foreign workers into domestic construction sites has been shifted to exploring the actual input conditions and efficient management methods. In this study, we investigated the current status and input situation of foreign workers at the construction sites of the target area, analyzed the problems they posed from the manager's viewpoint, and derived a method of improving the utilization of foreign workers at construction sites. In order to proceed with this study, we surveyed the actual situation of the construction sites, which consisted mainly of foreign workers and domestic workers (managers), by investigating the construction sites, and conducted 1: 1 interviews to ensure the reliability of the survey. The data obtained from the survey were analyzed using the SPSS analysis program, and the response rate was analyzed for each item. As a result, various problems, such as institutional problems, communication problems, and quality deterioration due to malfunction, appeared. Therefore, this study derives an improvement plan for the efficient utilization of foreign workers by improving the institutional level related to their language education, wages and employment.

Problems and Improvement of Basic Safety and Health Training for Foreign Worker in Construction Sites (외국인 작업자에 대한 기초안전보건교육의 문제점과 개선방안)

  • Cho, Young-Hang;Chung, Chul-Woo;Lee, Jae-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.175-180
    • /
    • 2021
  • Recently, there are lacks of construction workers, and such vacancy has been continuously increased in many construction sites. Foreign workers have been hired to fill such vacancy, but increasingly high demands for construction workers made construction companies to hire foreign workers who did not properly pass the health and safety education program. In this work, problems associated with the basic education program for occupational safety and health training, which is the first mandatory requirement for foreign workers, were evaluated to suggest applicable solutions for this program. Literature reviews and preliminary investigations were performed, and a questionnaire survey was conducted for practitioners who were in charge of safety management in various construction sites. Results from survey were analyzed to derive proper methods for improvement on basic education on occupational safety and health training program. It is believed that suggested solution from this work can make foreign workers to be more conscious about health and safety issues, so that it will eventually decrease the accident rate in construction sites.

Accident of Foreign Worker's at Construction Sites (외국인 근로자의 건설현장 투입시 사고위험 분석)

  • Son Ki-Sang;Yang Hak-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.1 s.69
    • /
    • pp.107-112
    • /
    • 2005
  • The purpose of this study is to propose and introduce Accidents Prevention Remedies(APRs) and their priorities especially for Accident Causing factors(ACFs) drawn by surveying and analyzing how much foreign workers in Korea have been exposed to dangers at a construction site. At frist as a result of the analysis of the questionnaire which 59 foreign industrial trainees working at the construction sites in Seoul-Kyunggi area had responsed, 12 ACFs and 11 APRs were put out by using the SPSS programme. Then, through the Analytic Hierarchy Process(AHP) about the questionnaire from 96 safety and civil engineers who have experienced in managing foreign labor at the construction sites all over the country, the APRs given their priorities of relative importances are as follows; First, it is absolutely necessary that every working order to foreign workers should be made more definitely in accordance with a concrete process schedule. Second, the owners should increase investments in improving foreign workers' welfare in order to minimize their potential human error. Third, Korean language education programme for simple technical terms should be made and executed at least.

Analysis on Unsafe Act of Foreign Construction Laborers (외국인 건설근로자의 불안전한 행동에 관한 분석)

  • Shin, Dae-Woong;Yang, Gi-Nam;Han, In-Hye;Jung, Gyeong-Hwan;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.36-37
    • /
    • 2014
  • According to increase of foreign laborers in domestic, their safety accident is continuously increasing. The purpose of this paper is to draw improvement priority from factors of unsafe act of foreign laborers in domestic. Assessment on each data was performed by Importance-Performance Analysis(IPA) based on safety accident statistics of KOSHA. The result showed that there was required urgent improvement of five factors. The outcome of this study can be utilized in construction safety training and management.

  • PDF

WTO GPA and BOT Contract (WTO 정부조달협정과 BOT 계약)

  • Chung, Jae-Ho;Woo, Yoon-Suk
    • International Commerce and Information Review
    • /
    • v.8 no.3
    • /
    • pp.193-206
    • /
    • 2006
  • The United States demands that the Korean Government include in the WTO GPA the privately invested projects of the BOT contract. Controversy surrounding BOT contract will continue. As of result of opening up of private investment market including BOT contracts, inflow of foreign capital will be expanded, and it will provide an opportunity for rectifying any unreasonable policies or regulations. With active penetration of foreign companies, there is a possibility for deepening of competition in the private investment market, and if a foreign administrative company is selected, possibility of assigning high value works such as design to foreign companies leaving labor intensive work such as construction to domestic companies exists, and also, difficulties resulting from agreement between the employer and the foreign administrative company exists. Large-scale construction companies must put forth their efficiency and creativity, and through revolutionary constructions by private sectors, reduction in construction cost should be made possible, and must also increase efficiency in maintenance, repair, and management of the facility. On the other hand, in order for Korean construction companies of BOT businesses to be able to enter the foreign BOT industry, the government needs to conduct studies in information and policies of various nations.

  • PDF

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

Constructing Foreign Reception Hall and Modern Royal Diplomatic Protocol in the Gyungungung Palace during 1899-1902 (근대적 궐내 외교관 의례의 성립과 1899~1902년 경운궁 휴게소의 건립)

  • Chang, PilGu
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.79-88
    • /
    • 2018
  • Foreign Reception Hall in Gyeongungung Palace was constructed during 1899-1902 according to Yesigjangjeong (禮式章程), Korean Empire's modern diplomatic protocol. This bulilding is a case worthy of notice, because its construction process was written in Jubon(奏本), Korean Empire's official document. Yesigjangjeong(禮式章程) regulates the process of diplomat's audience with Emperor Gojong. The process suggested that Foreign Reception Hall was designed as the place of the end as well as the beginning for audience. According to the process, diplomat came through main gate, Daehanmun and outer gate of main hall(Junghwajeon Hall, Audience Hall), then arrived at the stair to Foreign Reception Hall. After waiting time in the hall, he was going to be granted an audience with Emperor. And he exited through Foreign Reception Hall as the reverse way. This hall was constructed as western-style. Subcontracted carpenters and wood sculptors and laborers from China represents that chinese workers were prevailed in the government construction at that time. And modern building materials, such as glass, colored brick, sanitary wares and lightings were applied, which showed the new landscape in the middle of Gyeongungung Palace. Above all, official documents related with this hall reveals Korean Empire supervised this construction for diplomatic protocol. That is the identity of western-style buildings in Gyeongungung Palace.

The Analysis on the Unsafe Acts of Laborers at Domestic Construction Sites (국내 건설현장 근로자의 불안전한 행동 분석)

  • Han, I.H.;Yang, G.N.;Cho, H.G.;Jung, G.H.;Kim, G.H.;Shin, Yoonseok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.4
    • /
    • pp.132-139
    • /
    • 2014
  • According to the increase of foreign laborers at domestic construction sites, it's necessary to research in terms of the unsafe acts of both Korean and foreign laborers in order to prevent construction disasters. The objective of this study is to clarify the characteristics and the improvement priority of the unsafe acts using IPA(Importance-Performance Analysis). The result of this study showed which items of unsafe acts are identify difference between Korean and foreign laborers. Moreover, the result of IPA also showed items of unsafe acts that needed the immediate improvement for each one. Especially there are two items, i.e. equipment malfunction and wrong handling of hand tools, which both Korean and foreign laborers think simultaneous those needs improvement. The results can be utilized to plan and to improve the safety management and education at a site considering the characteristics of foreign laborers.

A Correlation Analysis between the Change of Managerial Environment and the Business Performance of Domestic Construction Firms (국내 건설환경 변화와 기업경영성과의 상관관계 분석)

  • Lee, Dong-Hoon;Kim, Sun-Kuk;Shin, Dong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.111-121
    • /
    • 2009
  • Because of its unique characteristics, the construction industry tends to be affected by economic environment more than any other industries. The domestic construction industry was forced to change its management pattern and system when it went through the foreign currency crisis, and since then, the construction industry has been growing in terms of quality over last 10 years, breaking from the quantitative performance-oriented growth in the past. The study was intended to integrate the financial data of the companies during the period before and after the foreign currency crisis so as to analyze the effect of environmental changes on management performance of the companies. It was aimed at evaluating the changes to the stability, profitability and the growth potential, and collecting the data on variation of the market scale, price of resources such as material and labor and the financial environment, thereby analyzing the correlation with the management performance. The study, to deal with the difficulties which are anticipated, like the foreign currency crisis experienced in the past, was also intended to identify the correlation between the economic conditions and the performance of the construction companies, using the experimental data in the past.