• Title/Summary/Keyword: Finish work

Search Result 143, Processing Time 0.025 seconds

Request Distribution for Fairness with a Non-Periodic Load-Update Mechanism for Cyber Foraging Dynamic Applications in Web Server Cluster (웹 서버 클러스터에서 Cyber Foraging 응용을 위한 비주기적 부하 갱신을 통한 부하 분산 기법)

  • Lu, Xiaoyi;Fu, Zhen;Choi, Won-Il;Kang, Jung-Hun;Ok, Min-Hwan;Park, Myong-Soon
    • The KIPS Transactions:PartA
    • /
    • v.14A no.1 s.105
    • /
    • pp.63-72
    • /
    • 2007
  • This paper introduces a load-balancing algorithm focusing on distributing web requests evenly into the web cluster servers. The load-balancing algorithms based on conventional periodic load-information update mechanism are not suitable for dynamic page applications, which are common in Cyber Foraging services, due to the problems caused by periodic synchronized load-information updating and the difficulties of work load estimation caused by embedded executing scripts of dynamic pages. Update-on-Finish algorithm solves this problem by using non-periodic load-update mechanism, and the web switch knows the servers' real load information only after their reporting and then distributes new loads according to the new load-information table, however it results in much communication overhead. Our proposed mechanism improve update-on-finish algorithm by using K-Percents-Finish mechanism and thus largely reduce the communication overhead. Furthermore, we consider the different capabilities of servers with a threshold Ti value and propose a load-balancing algorithm for servers with various capabilities. Simulation results show that the proposed K-Percents-Finish Reporting mechanism can at least reduce 50% communication overhead than update-on-finish approach while sustaining better load balancing performance than periodic mechanisms in related work.

Standardization of Polishing Work by MAGIC Polishing Tool (MAGIC 숫돌에 의한 연마작업의 표준화)

  • Cho, Jong-Rae;Lee, Sang-Tea;Jung, Yoon-Gyo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.10 s.175
    • /
    • pp.39-48
    • /
    • 2005
  • As the industrial development is accelerated, a new machining process and system are keenly required to achieve super precision surface finish. Especially to get ground surface finish fer complicated and narrow inner shape of molds, it is impossible with the existing methods so that a new method is being required to be developed. A new material, called Magic(MAGnetic Intelligent Compounds), is finally made and it is called Magic machining that uses this material. There is a way to make a material as follows, the mixture of magnetic particles, bonding material and particles of abrasive grain should be melt down by proper heat, and then this mixture put in a mold and cool down in magnetic field which has a uniform direction. This new polishing method is spotlighted as an excellent solution to the existing problems. However it hasn't reported any study about the influence of the machining conditions of polishing velocity, amplitude and polishing pressure to the surface roughness yet. This study would examine closely the influence of polishing conditions of the Magic polishing tool to the surface finish to decide the optimum polishing condition and to standardize the Magic polishing work.

A Study on the finish work applicability of Color Chip input Inorganic Floor-covering (칼라칩(Color Chip)을 혼입한 무기질 바닥재의 바닥 마감공법 적용성에 관한 연구)

  • Park, Ho-Geun;Hong, Seong-Wook;Doh, Sun-Boong;Kim, Sang-Won;Choe, Min-Kwon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.209-210
    • /
    • 2012
  • In this study, the following conclusions are drawn. First, the Inorganic terazzo tile flooring and LCC (Life Cycle Cost) analysis showed that the sum of the total cost of 150,304 won Inorganic flooring, terrazzo tile flooring minerals won 186,202 to 35,898 won, compared to 8.22% analysis of the cost savings that have been appearing. Second, if the color chip has a unique and elegant sentence patterns, beautiful and high-strength bonding and that the crack resistance was investigated.

  • PDF

Development of an Automated Indoor Floor Finish Robot Platform (건축 내부 바닥 미장 자동화 로봇 플랫폼 개발)

  • Ji-Youn Moon;Dong-Ju Lee
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.5
    • /
    • pp.853-858
    • /
    • 2023
  • Various types of robots are being utilized in the construction industry. Particularly, there is high interest in robots that can be applied to plastering automation, which can ensure consistent work quality. In this paper, we propose a robot platform based on wheels for plastering automation. Through experiments, we measured the surface pressure according to the air pressure of the wheel using the designed robot. As a result, we were able to confirm that the designed robot could perform plastering work on soft mortar with uniformly low pressure per wheel.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Work Process of Connecting Rod Die using CAD/CAM/CNC (CAD/CAM/CNC를 활용한 커넥팅 로드 금형의 제작)

  • 이종선;이환희
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2001.04a
    • /
    • pp.393-398
    • /
    • 2001
  • This paper aims to work process of connecting rod die using CAD/CAM/CNC systems. CAD/CAM/CNC systems are consist of CAD(MDT4.0), CAM(Z-MASTER) software and CNC milling machine. CAM software is purpose to G-code generation for CNC programming. Then CAM software and CNC milling machine are connect to RS-232-C cable for data network.

  • PDF

An experimental evaluation for improving resistance against freezing-thawing of concrete (콘크리트 동결융해 저항성 향상을 위한 실험적 평가)

  • Lee, Sang-Hyun;Kim, Kwang-Ki;Yoo, Jae-Yong;Lee, Joo-Ho;Ryu, Hwa-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.151-152
    • /
    • 2015
  • Concrete parking slab is often deteriorated severely after winter season because of concrete's freezing and thawing phenomenon. In this study, some methods to improve resistance against freezing-thawing is experimentally tested.: 1) concrete strength, 2) air content in concrete, 3) saw-cut effect and finish material. After experiment, in case of no finishes, 24MPa concrete with 4% air content is tested best result in terms of relative elastics modulus among testes ones. In case of concrete with finishes, all specimens are improved regardless of finishes compared to concrete with no finishes. Improvement degree compared to no finish is as follows : Polyurea > Resin-mortar > hardener and the number of improvement degree is 5, 4, 2% respectively. Further work is required considering construction site condition such as gaining water on surface and remicon in order to reflect site condition.

  • PDF