• Title/Summary/Keyword: Finish work

Search Result 143, Processing Time 0.022 seconds

A study of oral health behavior of urban laborer in Metropolitan area (도시지역 근로자의 구강보건 행태에 관한 연구)

  • Yoo, Young-Jae
    • Journal of Korean society of Dental Hygiene
    • /
    • v.10 no.5
    • /
    • pp.861-876
    • /
    • 2010
  • Objectives : The purpose of this study is understanding the behavior of the laborer relating oral health. Oral health is one of the most important requirement in the healthy life of the laborer. Also it is important to supply the welfare of the people. Methods : For this purpose survey to 400 urban laborer was carried out with questionnaire from October to November, 2009. Among them, 346 available responses were analysed with SPSS 12.0 statistic package. Results : The major findings of the study were as follows:First, Monthly income of 76.6 % of the laborer investigated was below 2500,000 won. Second, 56.1 % of the laborer investigated has the experience to visit dental clinic in the last two years. Third, 35.6 % of the laborer investigated has no experience to visit dental clinic in the last three years. Fourth, The average number of absent days due to oral disease were 0.11 day in a year. Fifth, The average number of the days fail to finish the work of the day due to oral disease were 0.32 day in a year. Sixth, 56.5% of the laborer investigated had no experience of oral health education, because of having no chance. Seventh, Factory bulletin and internet service is preferred as the source of the information on the oral health education. Eighth, In order to improve the status of oral health of laborer, periodical oral health examination and oral health education is needed. Conclusions : In order to improve the oral health of laborer, better public health policy is required, and it is made from understanding the behavior of the laborer relating oral health.

A Study on New Treatment Way of a Malicious Code to Use a DLL Injection Technique (DLL injection 기법을 이용하는 악성코드의 새로운 치료 방법 연구)

  • Park, Hee-Hwan;Park, Dea-Woo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.11 no.5 s.43
    • /
    • pp.251-258
    • /
    • 2006
  • A Malicious code is used to SMiShing disguised as finance mobile Vishing, using Phishing, Pharming mail, VoIP service etc. to capture of personal information. A Malicious code deletes in Anti-Virus Spyware removal programs, or to cure use. By the way, the Malicious cord which is parasitic as use a DLL Injection technique, and operate are Isass.exe, winlogon.exe, csrss.exe of the window operating system. Be connected to the process that you shall be certainly performed of an exe back, and a treatment does not work. A user forces voluntarily a process, and rebooting occurs, or a blue screen occurs, and Compulsory end, operating system everyone does. Propose a treatment way like a bird curing a bad voice code to use a DLL Injection technique to occur in these fatal results. Click KILL DLL since insert voluntarily an end function to Thread for a new treatment, and Injection did again the Thread which finish an action of DLL, and an end function has as control Thread, and delete. The cornerstone that the treatment wav that experimented on at these papers and a plan to solve will become a researcher of the revolutionary dimension that faced of a computer virus, and strengthen economic financial company meeting Ubiquitous Security will become.

  • PDF

Decipherment of the Wooden Tablet Prescription Excavated at Anapji (안압지 출토 목간(木簡) 처방전의 석독(釋讀)에 대한 연구)

  • Lee, Deok-Ho;Lee, Sun-A;Kim, Nam-Il
    • Korean Journal of Oriental Medicine
    • /
    • v.15 no.2
    • /
    • pp.85-91
    • /
    • 2009
  • The manufacture date of the number 198 wooden tablet excavated at Anapji is estimated to be between year 751 and 774. As medical artifacts around this period of time is scarce, the discovery of an artifact with distinct medical information such as names of medicinal drugs recorded in hand writing holds great value in the history of medicine. This wooden tablet was presumably a prescription for a medicinal formula. That the '灸' character which is a method of processing drugs is found after '甘草' indicates the possibility of this wooden tablet to be a practical form of prescription. On this slip, a certain sign can be found at the upper right corner of the names of drugs. This is thought to be an additional sign added to the original text. It seems to have been originated from the letter '了', based on the composition and finishing touches of the strokes, presumably to confirm the end of a work by adding the letter '了' which means 'to finish'. The base material of 靑黛 and 藍淀 are the same, and the two often took each other's place in a prescription. It is difficult to find an example of a formula where both drugs are included. Therefore, the prescription on the front with 靑黛, and the one on the back with 藍淀 of tablet 198 can be understood as separate formulas.

  • PDF

Method for 3D Visualization of Sound Data (사운드 데이터의 3D 시각화 방법)

  • Ko, Jae-Hyuk
    • Journal of Digital Convergence
    • /
    • v.14 no.7
    • /
    • pp.331-337
    • /
    • 2016
  • The purpose of this study is to provide a method to visualize the sound data to the three-dimensional image. The visualization of the sound data is performed according to the algorithm set after production of the text-based script that form the channel range of the sound data. The algorithm consists of a total of five levels, including setting sound channel range, setting picture frame for sound visualization, setting 3D image unit's property, extracting channel range of sound data and sound visualization, 3D visualization is performed with at least an operation signal input by the input device such as a mouse. With the sound files with the amount an animator can not finish in the normal way, 3D visualization method proposed in this study was highlighted that the low-cost, highly efficient way to produce creative artistic image by comparing the working time the animator with a study presented method and time for work. Future research will be the real-time visualization method of the sound data in a way that is going through a rendering process in the game engine.

Computer Education System using Simulation (가상체험을 이용한 컴퓨터 학습 시스템)

  • Syung-Og An;Soon-Young Lee
    • The Journal of Engineering Research
    • /
    • v.6 no.2
    • /
    • pp.75-83
    • /
    • 2004
  • We live in the information technology era and experience the rapid global information environment change through Internet. Therefore, as distribution channels and service qualities in our daily lives are provided through Internet, these changes have been the foundation of constructing a new society. Naturally, the use of computer is widely spread out and it is hard to find any company that doesn't use computer in its work. However, the computer skills of those who are in their fifties cannot reach to what the companies need for them even though they are main working groups in our society. In addition, the Internet access rate of homemakers in their late forties and over fifties are low due to their lack of computer knowledge even though they are the target customers of the Internet service. Under these circumstances, we offer a lecture using simulation techniqe through which anybody can easily follow the instructions via the "Help" menu not a boring lecture that just show the text and reads it. Besides, each class will show you how to start Internet/ how to finish it, how to register a website, how to use e-mail, etc. So, it will let you know every detailed aspect that average people may disregard but a beginner may be afraid of starting the Internet.

  • PDF

A Study on the Determinants of Adaptation of Service Personnel in the Entrance Region (접적지역 복무 병사의 적응도 결정요인에 대한 연구)

  • Park, Sang-Hyuk;Yoon, Yeo-Yeon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.191-195
    • /
    • 2019
  • South Korea is in a dangerous situation where a war between the two Koreas could be triggered at any time based on the MDL (Military Demarcation Line) between the two Koreas due to the inter-Korean standoff over the armistice. Also, unlike the borders of other countries, the border between the two Koreas is the front-line area where people can feel the threat of life that could be triggered by war. Soldiers who work in special areas such as the contact area are not easily accessible due to local conditions, and are less likely to go out, stay out, stay out, or visit, and the working environment is overloaded with vast forests and silence at night, and feel anxious, lonely and insecure because they don't know when any situation will occur near the enemy. Therefore, a great deal of help will be needed to pay attention to soldiers who give up their lives here and perform their national defense duties, and to finish their barracks life safely and faithfully, and support for psychological adaptation of service members in the border areas.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

A STUDY OF PRECISE FIT OF THE CAM ZIRCONIA ALL-CERAMIC FRAMEWORK (CAM Zirconia 완전도재 구조물의 정밀 적합도에 관한 연구)

  • Jeon Mi-Hyeon;Jeon Young-Chan;Jeong Chang-Mo;Lim Jang-Seop;Jeong Hee-Chan
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.43 no.5
    • /
    • pp.611-621
    • /
    • 2005
  • State of problem: Zirconia all-ceramic restoration fabricated with CAM system is on an increasing trend in dentistry. However, evaluation of the marginal and internal fits of zirconia bridge seldomly have been reported. Purpose: This study was to evaluate the at of margin and internal surface in posterior 3-unit zirconia bridge framework fabricated with CAM system(DeguDent, Germany). Material and Method: Preparations of secondary premolar and secondary molar on artificial resin model were performed for fabrication of 3-unit posterior bridge framework. Fits of 5 zirconia bridge framework were compared with 5 precious ceramo-metal alloy framework(V-GnathosPlus, Metalor, Switzerland), and prepared margins were designed to chamfer and shoulder finishing line. Each framework was cemented to epoxy resin model with reinforced glass ionomer(FujiCEM, GC Co., Japan), embedded in acrylic resin and sectioned in two planes, mesio-distal and buccolingual. Samples were divided into six pieces by sectioning and had two pieces of each surface(i.e mesial, distal, buccal and lingual surface) per abutment, so there were eight measuring points in each abutment. External gap was measured at the margin and internal gaps were measured at the margin, axial and occlusal surface. Gaps were observed under the measuring microscope(Compact measuring microscope STM5; Olympus, Japan) at a magnification of $\times100$. T-test were used to determine the statistic significance of the different gaps between zirconia and metal framework. Results and Conclusion: 1. External and internal marginal gaps of zirconia and metal framework were in clinically acceptable range. External marginal gaps were not different significantly between zirconia$(81.9{\mu}m)$ and metal $(81.3{\mu}m)$ framework and internal marginal gaps of zirconia $(44.6{\mu}m)$ were smaller than those of metal framework $(58.6{\mu}m)$. 2. Internal axial gaps of zirconia framework$(96.7{\mu}m)$ were larger than those of metal frame-work$(78.1{\mu}m)$ significantly and adversely, internal occlusal gaps of zirconia frame-work$(89.4{\mu}m)$ were smaller than those of metal framework $(104.9{\mu}m)$ significantly. 3. There were no significant differences in external and internal marginal gaps between chamfer and shoulder finish line when zirconia frameworks were fabricated.

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.

Application of Linear Schedule Chart for Schedule Management of Linear Construction Project (선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안)

  • Lee, Jaehee;Kang, Hyojeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.13-23
    • /
    • 2023
  • Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.