Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.6
/
pp.83-88
/
2010
In this paper, to propose a valid method solving a problem relevant to grounding from actual field data, the experimental results relevant to touch and step voltages and surface potential profiles measured around the real-sized and small-sized grounding electrode models were described. The ground surface potential profiles and dangerous voltages around the concrete pedestals employed in street facilities such as street lamps, traffic signal lamp and controllers as a case study were measured and discussed. The hemispherical cell with a diameter of 1,160[mm] was employed to simulate uniform soil. As a result, the results measured with the small-sized model were in reasonably agreement with the data obtained from the real-sized installation. It was found that the small-sized model test could be employed as a useful means evaluating the dangerous voltages around grounding electrodes installed at the inaccessible areas such as mountains, underground, underwater, and so on.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.1C
/
pp.1-6
/
2012
In this study, field tests were performed to evaluate the stability of pre-insulated pipe during the compaction operation and to recommend an alternative backfill material. Three types of natural sand (fine-grained and medium-grained, coarse-grained sand), crushed sand and two types of gravel (10 mm, 20 mm) were used as backfill material in the field tests. Field tests were performed to determine the behavior (earth-pressure and deformation, installation damage) of the pre-insulated pipe due to variation of different types of backfill material. Based on the evaluation and comparison of field test results, it was determined that crushed sand is the most suitable back-fill material that can be used as an alternative for medium grained sand for pre-insulated pipes with respect to the engineering behavior and material supply.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.1
/
pp.52-59
/
2007
A field mill capable of measuring the magnitude and polarity of electric fields at the ground level was studied to apply to a lightning warning system as a sensor. We designed and fabricated a planar-shutter type field mill with a rotating-vanes. A calibration of the field mill was performed in a vertically symmetrical arrangement which consists of two equal size parallel round plates to form a homogeneous electrical fields. The sensitivity of the field mill was adjusted at 0.5[V/kV/m], and this covers a ranges from 200[V/m] to 20[kV/m]. After the calibration experiment, the field mill was installed on the roof of a building to measure the changes of electric field intensity caused by thunderclouds. During the period from July 1. 2006 to July 15. 2006, the electric field intensity was recorded a ranges of $+2[kV/m]{\sim}-6[kV/m]$ depending on generation, extinction and movement of thunderclouds. From the actual test on the ground it is confirmed that the field mill has a good performance necessary for the measurement of DC electric fields.
Skin friction may be one of the most critical factors in designing the prebored and precast pile. Special attention was given to the interface behavior of cement milk-surrounding soil during the installation of prebored and precast pile. Small-scale field model pile test was conducted for the case of single pile. The size and geometry of the small-scale field model piles were designed with pile length 1.3m, boring diameter 0.067 m. Quick maintain-load test was conducted for the cases of boring diameter 150, 125, 90, 86, 74 mm and water-cement ratio 90, 70, 60%. It was shown that the bearing capacity of the pile increased as the cement-water ratio and cement milk thickness increased. Considering the scale effect between the small-scale model test and the actual construction site, it was found that cement milk thickness of 0.1~0.4D (50~200 mm) was reasonable for the stability of the structure. Also, the proper cement paste water / cement ratio was about 70% when considering the results of this study and quality control.
Underground flexible pipes for electric cables are subject to external loads and surrounding soil pressure. Particularly, strain of flexible pipes is of great concern in terms of safety and maintenance for electric cables. In this paper, stress and strain of flexible pipes with various installation depth are compared using traditional formula, FEM analysis, model soil box test and field test. from the findings of various analyses, considering the strain criteria-maximum 3.5%, it is suggested that flexible pipes can be buried at the depth of 80cm without additional soil improvement.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.65
no.1
/
pp.13-17
/
2016
EMC (Electro Magnetic Compatibility) of the electrical railway must be ensured for safety of passenger. Maglev trains has not friction between the wheels and the rails because levitation by an permanent magnets, electromagnets and superconducting magnets etc. So, it is advantageous to maintain a high speed without noise and vibrations. In this paper, we investigated that the magnetic field of the before and after installation electromagnetic waves absorber in order to analyze the effects of electromagnetic waves. The theoretical analysis of the electromagnetic wave absorber was simulated using finite element method. The magnetic field properties of electromagnetic waves absorber were measured by EMI (Electro Magnetic Interference) test receiver.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.11
/
pp.82-88
/
2013
It is important to give lightning warning prior to a cloud-to-ground (CG) discharge within an Area of Concern (AOC) because most of lightning damage and victim are usually occurred by the first lightning in the AOC. The aim of this study is to find the optimal operation conditions of the automated lightning warning systems in order to make the best use of the available data. In this paper, the test-operated results of the automated lightning alert and risk management system (ALARM) based on detections of CG discharge and eletrostatic field and optimized at probability of lightning have been described. It was possible to obtain the following warning performance parameters: probability of detection (POD), false alarm ratio (FAR), probability of lightning (POL) and failure-to-warn rate (FTW). The data obtained from trial operation for 5months were not sufficient but the first analysis of domestic lightning warning was carried out. We have observed that the evaluated statistical results through trial operation depend on the various factors such as analysis methods and criteria, topographical conditions, etc. Also we suggest some methods for improvement of POL and POD including the finding of the optimal electric field threshold level to be used, based on the high values of FAR and FTW found in this work.
Butterfly valve seated rubber has been widely used in water works and industrial fields because it has advantages which are small installation area and low weight. The size and material of butterfly valve have been selected by service environments and purposes. But there are out of the ordinary to find papers for the life characteristics of the butterfly valve. So, this study carries out the accelerated life test, which has an acceleration factor with pressure, using performance and life test equipment. Accelerated model is adopted with 3 stress level and the inverse power law model to estimate the life of the test samples. After the analysis of the test result, accelerated index has 7.0 and the acceleration factor has 208 which is applied with field condition with the pressure 6.3 bar.
Kim, Seoktae;Kim, Donghyun;Kang, Keumseok;Jung, Minuk
KEPCO Journal on Electric Power and Energy
/
v.2
no.4
/
pp.631-638
/
2016
Offshore wind power can be an alternative for onshore wind power which suffers from not only civil complaints regarding to landscape damage and noise but also wind power siting due to lack of onshore site candidates. Compared to onshore wind power, offshore wind power is free from these problems considering that generally the sites are far enough from the coast. And more electricity is generated in offshore wind turbines due to abundant offshore wind resources. However high installation costs of offshore turbines could deteriorate the economical efficiency. The main cause of the high installation costs comes from a long-term lease of the heavy marine equipment and the consequential high rental cost. In this paper, the conceptual design of the support structure for offshore wind turbines will be suggested for the installation of them with less heavy marine equipment.
Korean Journal of Construction Engineering and Management
/
v.7
no.4
s.32
/
pp.78-90
/
2006
There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.