• 제목/요약/키워드: Field Schedule Management

검색결과 109건 처리시간 0.024초

BASIC DESIGN OF A SCHEDULING TOOL FOR SMART DEVICES

  • Myunghoun Jang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.521-524
    • /
    • 2013
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as smart phones and smart pads. This research proposed a basic design to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A basic structure was designed for a user to be able to make and change a schedule by touching the smart device's screen. And a prototype was implemented by Adobe Flash/Flex Builder, it is applied to a sample network in a smart phone.

  • PDF

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.

KDC, DDC, NDC의 비교 분석적 연구 -경영학 영역을 중심으로- (A Comparative Study on the Management in KDC, DDC, and NDC.)

  • 김명옥
    • 한국문헌정보학회지
    • /
    • 제14권
    • /
    • pp.19-65
    • /
    • 1987
  • Library classification schedule IS based on the classification theory, principle and the system of the classification of science. It should be consisted of the basic principle of library classification which should use the library materials effectively. Continuous study and research on the each subject field of the discipline are essential for keeping up with the transformation of each learning field and the change of modern society. In this paper, I studied comparatively the sections and subsections of the management in KDC, DDC and NDC and reviewed the academic systems of each subject area in the management. I tried to compare the relationship beween the structure of library classifications and academic systems for the more specialized subsections of the management. KDC is influenced by the principle and structure of DDC, but I found that KDC is more similar to NDC than DDC in the sections and subsections of the management. Being un sufficient of subsections of KDC and NDC, they are not enough for the expansion and specialization of the subsections in the management. DDC is necessary to re-schedule for the proper expansion of 650 and 658 with reflection of the importance of that sections and academic systems. In this study, I adoped 9 sections of management, (1) Management policy (2) Administrative organization (3) Personnel (4) Office management and business information management (5) Marketing (6) Financial management (7) Production management (8) Accounting (9) International management. It would be necessary for us to study continuously about the specilized subsubsections of the management for the more professional classification.

  • PDF

건설공사의 작업지연 원인분석 프로세스 (THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION)

  • 지근창;김창덕;유정호
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.138-148
    • /
    • 2006
  • 작업의 지연을 줄이거나 예방하기 위해서는 작업지연상황을 지속적으로 확인하여 작업지연을 야기하는 원인을 찾아내고 대책을 세워야 한다. 그래서 지금까지 작업지연기간 산정방법 또는 작업지연의 클레임 사례에 관한 연구 등이 이루어졌으나 프로젝트 종료 후 결과에 의한 분석방법이나 원인분류체계를 제시한 것이 대부분이다. 건설 프로젝트는 동일한 조건하에서도 주변 환경에 따라 결과값이 다르게 나타나는 일회성이 강한 분야 중에 하나이다. 따라서 공사 진행 중에 발생하는 작업지연에 대해 효과적으로 대처할 수 있는 분석방법과 절차가 필요하다. 본 연구는 작업지연 원인분석 범위를 프로젝트내의 현장관리 분야로 국한하고 작업지연 원인분류 체계를 투입요소를 대상으로 작업지연 원인인자와 작업지 연 원인속성으로 나눴다. 작업지 연 원인분류 체계는 전문가 인터뷰 및 설문조사를 통해 검증하고 작업지 연 원인속성 및 원인인자의 특성을 분석하고 VSM을 응용한 작업지연 원인 분석방법 및 절차를 제시한다.

스마트 기기용 일정관리도구에 대한 기초연구 (A Basic Study on a Schedule Management Tool Used in Smart Devices)

  • 장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.311-313
    • /
    • 2012
  • Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as a smart phone and smart pad. This research proposed a method to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented by Adobe Flex Builder, and it applied a sample network in a smart pad. Further studies would develop network diagrams such as CPM(Critical Path Method).

  • PDF

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

일일 공정 Check System을 활용한 인력관리 사례 연구 (A study on the Human Resource Management through Application of Daily Scheduling Check System)

  • 박찬정;박홍태
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.124-132
    • /
    • 2004
  • 대부분 국내 건설현장의 인력관리는 협력업체별 당일 출역현황만을 관리하고 있다. 그러나 이와 같은 인력관리 방법은 적정투입 인력 및 생산성 확인, 계획대비 실투입 인력의 오차를 명확히 파악할 수 없기 때문에 이로 인해 발생하는 공기지연을 사전에 예방할 수 없는 한계를 가지고 있다. 이는 건설현장에서 공정계획과 인력자원이 상호 유기적으로 연계된 관리 노력의 부재에 그 원인이 있다. 따라서 건설현장의 공정관리 능력향상을 통하여 공정계획을 기반으로 한 체계적인 협력업체 인력관리의 필요성이 요구된다. 본 고에서는 CPM 공정표에 인적자원을 연계하여 관리할 수 있는 변혁 프로그램으로써 일일공정 Check System을 개발하였다. 또한 실제 공사 중인 아파트현장의 골조공사에 이를 적용하여 본 시스템의 활용 타당성과 효과를 검증하였다.

CCPM을 이용한 건설사업 일정관리에 관한 연구 (A Study on Schedule Management in Construction Projects by CCPM)

  • 박영민;김수용;김기영
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.84-92
    • /
    • 2004
  • 건설 공사의 여러 관리 요소 중 일정관리는 매우 중요하다. 하지만 현재의 건설 프로젝트 일정관리 수준은 1950년대에 만들어진 PERT나 CPM을 반세기가 지난 지금까지 그대로 사용하고 있을 정도로 후진성을 면치 못하고 있다. 이런 PERT/CPM의 사용은 소요공기추정의 불확실성과 그 활동에 할당된 자원의 경합과 같은 여러 가지 문제들을 야기하고 있다. 따라서 본 연구에서는 기존의 일정관리 기법인 PERT/CPM의 단점을 보완하고 국내 건설공사의 일정관리 효율성을 증대시키기 위하여, 1997년에 개발된 새로운 일정관리 이론인 CCPM(Critical Chain Project Management)에 대한 소개와 함께, 가상의 교량건설 프로젝트를 대상으로 한 모의시험을 통하여 CCPM의 국내건설사업에의 적용 가능성을 검증 하였다.

대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구 (Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling)

  • 최윤기;이현수;황영삼;김영석;김우영;송영웅
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.153-161
    • /
    • 2004
  • 대형 건설프로젝트의 효율적인 운용을 위해서는 프로젝트 각 분야간의 유기적인 관리체계가 필수적이라 할 수 있다. 대형 건설프로젝트의 관리업무 중 일정, 비용, 자재, 노무관리업무는 상호 유기적 종합관리를 가능하게 하는 업무들이며 이들을 종합적으로 $분석\cdot평가$할 수 있는 데이터 중심의 정보교환체계가 필수적이라 할 수 있다. 건설프로젝트관리의 $비용\cdot일정관리$업무에서 발생하는 자료의 중요성 및 활용빈도는 타 관리보다 높으며 건설공사의 효과적인 수행에 미치는 영향이 크다. $비용\cdot일정$ 통합데이터 통합관리를 통한 건설프로젝트관리체계를 수립하는 것은 생산성 측면과 자료 활용도 측면에서 더욱 효과적이라 할 수 있다. 본 논문에서는 $비용\cdot일정$ 통합 데이터베이스를 기반으로 하고 비용, 일정, 자재, 노무관리에 관련된 현장업무 분석을 통하여 대형건설공사의 프로세스 및 데이터 모델링을 통한 제반 필요정보의 분석 및 구조화를 제시하고자 한다.

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF