Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling  

Choi Yoon-Ki (숭실대학교 건축학부)
Lee Hyun-Soo (서울대학교 건축학과)
Hwang Young-Sam (인천대학교 건축공학과)
Kim Young-Suk (인하대학교 건축공학과)
Kim Woo-Young (한국건설산업연구원)
Song Young-Woong (숭실대학교 대학원)
Publication Information
Korean Journal of Construction Engineering and Management / v.5, no.2, 2004 , pp. 153-161 More about this Journal
Abstract
The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.
Keywords
Construction Project Control System; Integrated Cost and Schedule; Process and Data Modeling;
Citations & Related Records
연도 인용수 순위
  • Reference
1 정철원, EV개념에 의한 통합건설공사관리시스템, 한국건설관리학회 학술발표대회논문집, 2001
2 최윤기, 일정과 비용을 통합한 건설공사진도율 산정 시스템, 서울대학교 대학원, 박사학위논문, 1999
3 CII, Project Control for Engineering, Publication No. 6-1, Jul, 1986
4 이현수, 건설공사의 비용.일정 통합 모델에 의한 전사적 자원조달시스템 개발, 2002
5 MRP기법을 이용한 EVMS의 복합작업.자원계획에 관한 연구, 한국건설관리학회 학술발표대회논문집, 2001
6 Rasdorf, William J. and Abudayyeh, Osama Y., Cost and Schedule Control Integration, Journal of Construction Engineering and Management, ASCE,1991
7 김우영, 공통자와 공통분류에 의한 비용/일정 통합모델개발, 대한건축학회 논문집, 2002. 8