• Title/Summary/Keyword: Field Manager

Search Result 297, Processing Time 0.027 seconds

A Study on Optimal Performance Evaluation Analysis of Work Manager (작업관리자의 최적 수행도 평가 분석에 관한 연구)

  • Kim, Heung-Jae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.5
    • /
    • pp.71-84
    • /
    • 2006
  • In order to apply job performance records to the master craftsman examination, which is an examination to screen the top-rated technician and task manager, the domestic industry has introduced job performance records to the written test of the master craftsman examination. Surveys on master craftsman's field capabilities and applicability are being conducted, and various qualification methods are being tested so as to give satisfaction to consumers in industrial fields. However, these methods have many problems in assessing task managers' qualifications. In order to solve these problems, this research intends to verify the appropriateness of introducing master craftsman's portfolios assessment and the suitability of application methods by conducting interviews and surveys. One big conglomerate and one mid-sized company that has more than 500 employees and covers from 주조(酒造:brewing) 또는 to providing various services to consumers were selected for this research.

A Simplified Graphics System Based on Direct Rendering Manager System

  • Baek, Nakhoon
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.2
    • /
    • pp.125-129
    • /
    • 2018
  • In the field of computer graphics, rendering speed is one of the most important factors. Contemporary rendering is performed using 3D graphics systems with windowing system support. Since typical graphics systems, including OpenGL and the DirectX library, focus on the variety of graphics rendering features, the rendering process itself consists of many complicated operations. In contrast, early computer systems used direct manipulation of computer graphics hardware, and achieved simple and efficient graphics handling operations. We suggest an alternative method of accelerated 2D and 3D graphics output, based on directly accessing modern GPU hardware using the direct rendering manager (DRM) system. On the basis of this DRM support, we exchange the graphics instructions and graphics data directly, and achieve better performance than full 3D graphics systems. We present a prototype system for providing a set of simple 2D and 3D graphics primitives. Experimental results and their screen shots are included.

A Study on the Basic Framework and Program Development for Establishment of Institutional Household Manager System-Focused on the Curriculum (공공가정관리 전문가 제도화를 위한 기초연구 및 프로그램 개발 -교과목 구성을 중심으로-)

  • 조희금
    • Journal of the Korean Home Economics Association
    • /
    • v.36 no.5
    • /
    • pp.203-216
    • /
    • 1998
  • This study examines the necessity of establishment of Institutional Household Manager(IHM) system and the development of the curricula for IHM. It suggests that the establishment of IHM system meets the needs of the times. And it also shows that two kinds of curricula model for IHM can be developed : the one is specialized curricula model and the other is integrated curricula model. The specialized model emphasizes the specialization of institutional household management and is consisted of the acquisition of 4 required and 3 optional subjects and field practices. The integrated model makes a point of integration of other majors and is composed of the acquisition of 2 required and 5 optional subjects and field practices.

  • PDF

A Field Study on the Loss Factors of IS Development Project in the Public Sector: Perspectives of Project Management (공공부문 IS 개발 프로젝트 손실요인에 대한 현장연구: 프로젝트 관리를 중심으로)

  • Jang, Sung-Bong
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.65-84
    • /
    • 2004
  • This research analyzes the causes of delay and resulting additional expenses on the IS project in the public sector, and then proposes some solutions to the problem. Through a field study, the research found that the causes include employer's attitude, the leadership and risk management ability of the project manager, and qualifications of project members. In order to avoid those problems, the project manager should secure various communication channels and good relationship between the employee and the contractor.

Consciousness of Safety Engineer for Foreign Workers at a construction site (안전관리자의 건설현장 외국인 근로자에 대한 의식조사)

  • Son, Ki-Sang;Lee, Seung-Young
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.1
    • /
    • pp.41-47
    • /
    • 2008
  • Safety training for foreign workers should be thoroughly done. But it has not been done well even if field safety manager understand that the training has not been well provided. 72% of responders (Safety Managers) at field thinks that safety training has not been well provided at a site. It is shown that there are not any additional measures to correct this problem. Eventually, the reasons of that the training is not well provided, and foreign workers do not understand safe condition at site, well lead to an accident at construction site.

A Study on Development Plan of Design and Operation for Education Training of Disaster & Safety Field Workers with the Amendment of Framework Act on the Management of Disasters and Safety (재난 및 안전관리기본법 개정에 따른 재난안전분야 종사자 교육훈련 설계 및 운영 발전 방안 연구)

  • Nam, Sangwhun;Park, HaeJung
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.4
    • /
    • pp.484-492
    • /
    • 2013
  • The purpose of this study is to propose development plan for systematic design and management of disaster and safety education curriculum in accordance with the revision of Framework act on the management of disasters and safety. The curriculum is intended for current disaster management professionals. Prior to analysis, disaster and safety professionals were classified into three categories: disaster practitioner, disaster manager, and disaster higher manager. And based on 24 disaster safety functions and 13 disaster management competence items, priorities of their task ability were derived. Considering practical effect of disaster and safety education, the course curriculum is divided to target groups of disaster practitioner, disaster manager, and disaster higher manager. Disaster management education curriculum and its design are based on the results of disaster prevention education contents development planning to reflect the elements of advanced disaster management education and to consider brand making of the curriculum and operation pattern.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

A Study on the Improvements of Qualification Items for Electronic Commerce Manager (전자상거래관리사 출제기준에 대한 개선방안 연구)

  • Cho, Se-Hyung;Lee, Jae-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.2
    • /
    • pp.47-74
    • /
    • 2007
  • This research purpose to improve the qualification items for electronic commerce manager. Former qualification system for the electronic commerce manager was executed 11 times from year 2000 to 2005. To improve the standard for test questions and contents of qualification items, we reviewed literatures about job analysis for electronic commerce manager, electronic commerce curriculum, e-Business market and other countries' similar qualification systems and items. We also analysed the job related knowledge, skill, and abilities using job analysis by DACUM method, subject matter experts interview and workshop committee for development and validation of qualification items. Based on the results of job analysis and DACUM workshop, we derived a job model for electronic commerce manager and then validated it through field survey and additional expert review. Finally we developed and suggested an alternated qualification items using matrix analysis between categorized job knowledge and job tasks.

  • PDF

Perception Difference Analysis between Manager and Field Worker about the Form work Collapse Accident (거푸집 붕괴재해에 대한 관리자와 작업자의 인식차이 분석)

  • Kang, Sung Won;Lee, Jun Heon;Park, Se Hwan;Kang, Ha Ram;Lee, Ki Seok;Kim, Baek-Joong;Shin, Yoon-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.179-187
    • /
    • 2021
  • In the past five years, form construction, which accounts for approximately 25% of the total construction period, has continued to occur without a significant decrease in the number of deaths, with the largest proportion of collapse accidents. Accordingly, this study analyzed the difference in perception between the manager and worker by a questionnaire survey on the degree of risk and safety management level regarding a mold collapse accident. The survey was conducted in three groups: safety manager, field worker, and field manager. The results of the survey were analyzed by an independent sample T-Test using the SPSS program. As a result, there was almost no difference in recognition between managers, but a significant difference in recognition between managers and workers. In addition, there was a difference in management perception between the administrator and worker, which clearly shows the difference in the position between the administrator who manages and supervises hazardous disaster factors and the worker who works directly in the field. Such differences in perception can be a factor that cannot be mitigated. Based on this study, more developed research can narrow the perception gap between managers and workers and be used as a basic material for disaster research.

Development of a curriculum for Care Manager Education (케어매니저 양성을 위한 교육과정 개발)

  • Chong, Min-Yeong;Son, Myeong-Dong;Park, Cheon-Gyu
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2009.05a
    • /
    • pp.1064-1069
    • /
    • 2009
  • The aged long-term care insurance for solving problems of the aged increasing rapidly in an aging society is a primary subject which have influence on. So, it is important to develop a curriculum for training care professionals who play an important role in operating of the aged long-term care insurance and especially care managers, because care managers are central professionals who intervene in a whole process of the aged long-term care insurance and provide the recipient with proper services. In this paper, we propose a curriculum for care managers. It includes a process classifying care manager students into a beginner and an experienced man, subdividing it into 3 parts-lecture, practice, field practice, assign time to subjects, train students by it, carry out a written examination, and certify in care manager training.

  • PDF