• 제목/요약/키워드: Field Construction Process

검색결과 872건 처리시간 0.026초

건설공사의 공정계획을 위한 공정정보 시스템 구축에 관한 연구 (A Study on the Plan Establishing Process Data System for the Process Plan of Construction Works)

  • 안효수;권춘안
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.142-147
    • /
    • 2001
  • Recently, as the field of construction industrial is enlarged and the blanket control system is formed, the process plan considered from initial process formation to construction cost must be systematic and rational. So we have to propose and compose the new process formation system that divides the intention decisive property of construction data, its relationship and the data property according to process definitely and can express and control easily the public ownership of construction data and network process under the peculation control. So this study decides the field formation and construction data of the work according to the ordering and contract way to establish the process data system for the process plan, shows that the lot theory is necessary to form the economical construction field and proposes that the integrated formation system of construction data that is made by code system must be established.

  • PDF

레디믹스트 숏크리트의 현장 시공프로세스 분석 및 경제성 평가 (A Study of Field Construction Process Analysis and Economic evaluation of Ready-mixed Shotcrete)

  • 김동민;마상준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1322-1327
    • /
    • 2010
  • Ready-mixed shotcrete mixed with high quality materials and can be controled shotcrete quality is producted in plants and transported to construction fields, so do not need a field batch plant. In this study, the field construction system that can be applied Ready-mixed Shotcrete to construction fields was proposed, and the all-in-one silo that was the key component of the field construction system was design. It was performed to evaluate the constructability that the field construction process analysis in case of applying a field batch plant and the all-in-one silo, the cost analysis of the material production and transport in a road tunnel was also performed to evaluate the economic feasibility of Ready-mixed shotcret.

  • PDF

한국 의복구성학 분야의 연구동향 - 2001~2010년까지 학회지를 중심으로 - (A Survey on the Research Trends of Clothing Construction in Korea - Focused on Journal Publications from 2001 through 2010 -)

  • 최해주
    • 복식
    • /
    • 제63권3호
    • /
    • pp.138-150
    • /
    • 2013
  • The purpose of this study was to investigate research trends of subject matter in clothing construction field in clothing and textiles and to suggest the information for the future directions for fashion business and research. 2737 articles with clothing and textiles subject matter, 350 articles with clothing construction field in the Journal of Korean Society of Costume and Journal of the Korean Society of Clothing and Textiles from 2001 through 2010 were analyzed. The major conclusions of the study are as follows: 1. Clothing construction field took 12.8% with 350 articles in the researches of the Journal Publications in 2000s. 2. Clothing construction field showed more proportions in the latter half of the decade. 3. Clothing construction field were classified into 5 topics : topic of basic pattern and pattern for apparel, topic of body types, topic of functionality of clothing and protective clothing, topic of size system of apparel, topic of sewing and manufacturing process. 4. In clothing construction field, topic of basic pattern and pattern for apparel took the most proportions. 5. Topic of body types, topic of functionality of clothing and protective clothing, topic of size system of apparel, topic of sewing and manufacturing process were followed.

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • 제15권3호
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

기계설비산업의 생산체계 선진화방안 (Improvement Plan of Mechanical System in Construction Industry Production Process)

  • 박종일;박률
    • 설비공학논문집
    • /
    • 제23권6호
    • /
    • pp.470-476
    • /
    • 2011
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

기계설비산업의 생산체계 선진화방안 (Improvement Plan of Mechanical System in Construction Industry Production Process)

  • 박종일;박률
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1112-1118
    • /
    • 2009
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

온톨로지 구축 프로세스와 시스템 (Ontology Construction Process and System)

  • 이인근;서석태;정해천;황도삼;권순학
    • 한국지능시스템학회논문지
    • /
    • 제16권6호
    • /
    • pp.721-729
    • /
    • 2006
  • 컴퓨터를 활용한 지식과 정보 처리를 위해 온톨로지를 구축하고 활용하기 위한 연구가 이루어지고 있다. 그러나 현재까지의 온톨로지 개발 방법 및 온톨로지 구축 도구는 온톨로지 개발 목적에 따라 제한적인 부분에서 연구되어 사용되고 있다. 그러므로 개발하려는 온톨로지 특성에 따른 적절한 온톨로지 구축 프로세스와 도구가 필요하다. 본 논문에서는 특정 분야의 비전문가가 언어 자원으로부터 지식을 개념화하고, 개념을 형식화하여 온톨로지를 구축할 수 있는 온톨로지 구축 프로세스(OntoProcess)를 제안한다. 그리고 다수의 온톨로지 구축자가 동시에 온톨로지 구축 작업을 행할 경우 i)지식의 개념화 과정에서 동일한 개념을 중복 정의하거나 ii)개념의 형식화 과정에서 형식언어와 포구사용법의 이해 부족으로 인해 온톨로지 구축 능률이 저하되는 문제가 발생할 수 있다. 이런 문제를 해결하기 위해 메타 온톨로지를 이용한 다중 온톨로지 구축 프로세스(OntoProcess)를 제안한다. 제안한 프로세스에 기반한 온톨로지 구축 시스템 (OntoProcess)을 개발하고, 실제 온톨로지 구축 실험을 통하여 제안한 프로세스와 시스템의 효율성을 확인한다. 그리고 온톨로지 구축 과정에서 발견된 문제점 및 이에 대한 해결 방안을 제시한다.

A Study of the impacts of control types on Tie strength and Project Performance - focus on field project organization of construction industry

  • Lee, Won-Hee;Cho, Ho-Haeng
    • 한국컴퓨터정보학회논문지
    • /
    • 제26권7호
    • /
    • pp.103-108
    • /
    • 2021
  • 본 연구는 국내 건설산업의 현장프로젝트조직 사업 참여자를 대상으로 프로젝트 참여자 간 통제유형에 따라 유대 강도와 현장프로젝트 성과에 어떠한 영향을 주는지를 살펴보고자 하는 실증연구이다. 본 연구에서는 산출통제(Output Control), 과정통제(Process Control), 현장프로젝트 사업참여자간 유대강도가 현장프로젝트성과에 어떠한 유의한 영향을 미치며 또한 한국 건설산업의 현장프로젝트조직만이 가지는 특징을 실증분석을 통하여 알아보고자 하였다. 실증분석결과 산출통제(Output Control)는 사업참여자 간 유대강도와 과정통제(Process Control)에 유의한 영향을 주며 유대강도는 과정통제(Process Control)와 현장프로젝트 성과에 유의한 영향을 주었으며 과정통제(Process Control) 역시 현장프로젝트 성과에 유의한 영향을 미치는 것으로 나타났다.