• 제목/요약/키워드: Feasibility assessment

검색결과 635건 처리시간 0.028초

대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 - (Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project)

  • 최미희
    • 환경영향평가
    • /
    • 제11권2호
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

국책사업 예비타당성조사 평가항목별 중요도 분석 - 댐 개발사업을 중심으로 - (The Analysis of Assessment Factors for Preliminary Feasibility Study of Dam Project in Korea)

  • 구자건;이무춘
    • 환경영향평가
    • /
    • 제13권6호
    • /
    • pp.307-314
    • /
    • 2004
  • Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.

휴양림 조성 대상지 선정을 위한 타당성 평가 연구 - 경기도 광주시를 중심으로 - (A Study on the Feasibility Assessment for Selecting Recreation Forest Sites: The Case of Gwangju-si in Gyeonggi-do)

  • 서정영;염성진
    • 한국환경과학회지
    • /
    • 제28권11호
    • /
    • pp.959-969
    • /
    • 2019
  • This study sought to contribute to the revitalization of local economy by developing a natural recreation forest, which is the base of ecotourism recreation, through utilizing forest resources and the natural environment of Gwangju-si. The study conducted a feasibility assessment through on-site surveys such as the suitability of the candidate sites, location analysis, and possibility of damage to the forest, before developing recreation forest sites in Gwangju-si and, based on the result, selected appropriate subject sites. The candidates for this study were 5 forest sites such as one site in the Mokheon-dong area, two in the Docheok-myeon area, and one in the Toechon-myeon area. For this study, the current status of the natural recreation forest was surveyed, its feasibility index and assessment process were investigated, and the local status and related regulations of Gyeonggi-do and Gwangju-si were reviewed. The final subject sites were selected after feasibility assessment utilizing assessment index in order to evaluate the candidate sites. The feasibility assessment was conducted after three separate on-site surveys for each candidate site between October 2018 and January 2019 utilizing "The Feasibility Assessment Criteria for Natural Recreation Forest (Notification 2018-71)" of the Korean Forest Service. The items instrumental to the feasibility assessment were classified into landscape, location, water system, induction of recreation, and development condition; the assessment was made after redefining each item into detailed items. Through this process, the Usan-ri area was selected as the final site for developing natural recreation forest, having obtained more than 100 points according to "The Feasibility Assessment Criteria for Natural Recreation Forest" of the Korean Forest Service. In order to develop natural recreation forest in the Usan-ri area in the future, further discussion is necessary with the relevant departments in consideration of the degree of ecological zoning map.

생활폐기물소각장의 입지타당성 평가기법 (A Study of Assessment Method for Site Feasibility of Municipal Solid Waste Incineration)

  • 이무춘
    • 환경영향평가
    • /
    • 제6권2호
    • /
    • pp.123-135
    • /
    • 1997
  • The solid waste incineration facilities which cause environmental pollution. And those are some kind of loathing facilities for residents who do not want it. This problem could be solved by location feasibility study. The purpose of location feasibility study was to determine one site out of three candidate sites. This study which was done by the law, environmental and economic factor was considered for optimum site selection. Comparative evaluation among the candidate sites was done by ordinal scale and thus the optimum site was selected.

  • PDF

수학과 수행평가 도구로서 개념망 과제의 개발과 적용 가능성 (Study on Development and Feasibility of Concept Map as a Tool of Performance Assessment in Mathematics)

  • 권오남;권기순
    • 대한수학교육학회지:학교수학
    • /
    • 제3권1호
    • /
    • pp.75-99
    • /
    • 2001
  • The purpose of this study is to develop concept map as a tool of performance assessment in mathematics and to conduct feasibility test of the task. I developed and applied a concept map, an assessment tool, in the form of a mathematics performance task for 1st and 2nd year middle school students. I also conducted feasibility test of the task, and at the same time sought ways to guarantee reliability of the assessment procedure. Results of the task assessment can be summarized into the following four points. First, the concept map task was found to be appropriate for an assessment of mathematics in middle school. Second, results of all 10 factors on verification of validity of the content of the task were positive with over 50%. Third reliability of teachers who conducted marking of the four concept map tasks was high, all recording over .871 in correlation number.

  • PDF

농업생산기반정비사업의 예비타당성조사 정책효과 분석 - 판교지구 다목적 농촌용수개발사업을 중심으로 - (Policy assessment of Agricultural Infrastructure Improvement Project for Preliminary Feasibility Study - Multipurpose Rural Water Development Project in Pangyo District -)

  • 김수진;배승종;유승환;김윤형;윤성은;김정훈
    • 농촌계획
    • /
    • 제27권1호
    • /
    • pp.21-28
    • /
    • 2021
  • Since 2001, the Pangyo district multipurpose rural water development project has been promoted as a new target project for stable supply of agricultural water and improvement of the living environment of rural areas in Seocheon-gun. Detailed data analysis and logic must be reinforced, focusing on the items reorganized by the reorganization of the preliminary feasibility study. The purpose of this study is to promote the smooth promotion of projects by conducting a policy effect assessment following the reorganization of the preliminary feasibility study system. This study conducted a policy assessment of agricultural infrastructure improvement project for preliminary feasibility study. The policy assessment is divided into three parts: project implementation conditions, policy effects and special assessments. The newly established policy effect is to assess the job effects, living conditions impact, environmental evaluation, and safety evaluation that contribute to the quality of life. Sixteen policy assessment items were selected and evaluated quantitatively and qualitatively. The results of the study are expected to provide basic data for the comprehensive judgment of the preliminary feasibility study of agricultural infrastructure improvement project in the future.

바이오매스를 이용한 농업용 난방계획의 경제성 검토 (Economic Assessment of Biomass Heating for Rural Application)

  • 홍성구
    • 한국농공학회논문집
    • /
    • 제47권2호
    • /
    • pp.45-52
    • /
    • 2005
  • Biomass is one of the most competitive renewable energy resource and can be used for heating for rural applications. A economic assessment was made of biomass heating, using the tool BIOH2000 from $RETScreen^{\circledR}$ International Clean Energy Decision Support Centre. For a 260kW heating system for 50 farm houses, the assessment showed a very promising results. Internal rate of return was $19.7\%$ and year-to-positive cash flow was 5.1 years. Relative price of biomass over fossil fuel significantly affected the economic feasibility of the project. Heating demand was directly related to annual demand of biomass and economic feasibility. Relative cost of distribution pipe over the total initial costs also affected the economic feasibility of the project. The economic feasibility was expected to be improved by the probable greenhouse emission reduction credit and reduction of initial costs through utilizing existing heating system for peak or back up heating system.

신기술개발을 위한 사전평가지표 개발 (Study on Assessment Indicators for the Development of Agricultural Technology Development)

  • 구교영;곽철순;황대용
    • 농촌지도와개발
    • /
    • 제19권4호
    • /
    • pp.1095-1136
    • /
    • 2012
  • 본 연구에서는 신기술 연구개발사업의 사전타당성 평가현황 및 개선방안에 대해 설명하였다. 농촌진흥청이 수행하고 있는 사전타당성 평가방법을 파악하고 이를 발전시킬 수 있는 방안을 모색하기 위해 국내외 여러 기관의 사전타당성 평가제도와 평가지표를 조사 분석하여 새롭게 사전타당성 평가지표를 구성하였다. 이렇게 하여 도출된 평가지표에는 기술성, 시장성, 사업성과 관련된 지표들이 새롭게 산출되었다. 이를 기본내용으로 설문지를 개발하고 응답내용을 통계처리하여 지표간의 비중을 설정하였다. 결과는 사업성이 가장 높게 나타났으며, 세부적으로 예산적절성, 신규성, 기술수요가능성, 상용화가능성의 타당성이 높게 나타났다. 이를 참고하여 사전평가지표의 운영프로세스에 대해 간략하게 제안하였다.

소수력발전소의 건설 타당성분석 기법 (Methodology of Feasibility Assessment for Small Hydropower Plant)

  • 박완순;이철형;정상만
    • 태양에너지
    • /
    • 제18권3호
    • /
    • pp.153-160
    • /
    • 1998
  • The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.

  • PDF

농업용 보를 이용한 소수력발전소의 타당성 분석 (Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose)

  • 이철형;박완순
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 춘계학술발표대회 논문집
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF