• Title/Summary/Keyword: Evaluation performance

Search Result 17,501, Processing Time 0.044 seconds

Design and Implementation of Mobile-Based Performance Evaluation Management System (모바일 기반 수행평가 관리 시스템 설계 및 구현)

  • Park, Ki-Hong;Lee, Jin-Kwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.5
    • /
    • pp.37-44
    • /
    • 2011
  • Recently, as smartphones are quickly spread to the general public, there are making a difference for use of information and communication methods. In this paper, mobile-based Performance Evaluation Management System(PEMS) that can make middle and high school teachers efficiently manage tasks of performance evaluation was implemented. That were applied to the performance evaluation of teachers. As a result, the tasks of teachers in the performance evaluation was reduced and teachers are able to concentrate on the guidance for students.

A Study on the application of Balanced Scorecard in Small Business: A case of development of a Human Resource Evaluation System (중소기업의 BSC활용방안에 관한 연구 : 인사평가제도 시스템 구축 사례)

  • Kang, Shin-Cheol
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.1
    • /
    • pp.77-96
    • /
    • 2009
  • The balanced scorecard has drawn attention from many researchers in various fields since its appearance in 1992. It became a norm for performance evaluation framework in many areas, such as marketing, information system evaluation, strategic planning, etc. Centered in the large companies in Korea, the balanced scorecard has been popularly used as a performance evaluation tool for human resource management. Now we Question its applicability to performance evaluation tool even in small business. This study tried to apply the balanced scorecard in developing an information system for performance evaluation in a small business. The study showed that the balanced scorecard can be nicely used in small business as a performance evaluation tool. The process of developing an information system is described in detail. The practitioners are to obtain a lot of insights in designing their human resource management systems from the study results.

  • PDF

The Development of Evaluation Indicators for the Performance of Defense Core-Technology R&D Projects Using SMR/AHP (SMR/AHP 기법을 활용한 국방핵심기술 연구개발사업 성과평가지표 개발)

  • Lee, Hyung-Jun;Kim, Chan-Soo;Kim, Woo-Je
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.1
    • /
    • pp.70-79
    • /
    • 2009
  • Currently, the investment on Research and Development(R&D) for defense core technology is continuously increasing to maintain advanced country's R&D level. In accordance with this trend, the national defense R&D investment management system is being more strengthening, and importance of performance evaluation is being emphasized more and more. However, the existing indicators of performance evaluation for defense core technology R&D is limited in efficient management because of the qualitative evaluation items and subjective allocation of points. In this paper, we developed a novel indicator for defense core technology R&D performance evaluation through domestic and foreign related literature and inquiry, brainstorming, and analysis techniques by Stepwise Multiple linear Regression(SMR) and Analytic Hierarchy Process(AHP). And we verified effectiveness of proposed indicators of performance evaluation by comparing with the existing evaluation indicators. Our proposed indicators for performance evaluation will create superiority performance on defense R&D fields.

Structural Relationship between Salesperson's Perceived Evaluation Fairness and Job Performance in the Financial Market (금융시장에서 영업사원의 지각된 평가 공정성과 직무성과 간의 구조적 관계)

  • Lee, Jun-Seop;Kim, Ji-Young;Lee, Han-Geun
    • Journal of Distribution Science
    • /
    • v.14 no.12
    • /
    • pp.141-151
    • /
    • 2016
  • Purpose - Salesperson perceptions of the fairness and accuracy of a performance evaluation system were examined by managerial and professional employees of large organization. The performance evaluation process is central to many personal decisions such as attitude for job and sales performance. This study investigates the relationship between perceived evaluation fairness, job satisfaction, organizational commitment, and sales performance. The main purpose of this study is to develop and empirically test a comprehensive model of salespersons' perceived evaluation fairness on sales performance. For this purpose, we identified the structural relationship between perceived evaluation fairness, job satisfaction, organizational commitment, and sales performance. Also we investigate the mediating effects on job satisfaction and organizational commitment between perceived evaluation fairness and sales performance. Research design, data, and methodology - To empirically test these relationships, data were collected by in-depth interviews from sales managers and questionnaire surveys from 300 salespersons who work for sales area (credit card company, insurance company). Demographically, the overall sample was 91.6% female, 77.9% 30s and 40s, and 34% college educated, with an average tenure with their present organizations of 4 years. The questionnaire was composed of total 20 items dealing with frequency, quality, and consequences of perceived evaluation fairness, job satisfaction, organizational commitment, and sales performance. To test the research hypotheses, collected data analyzed by confirmatory factor analysis (CFA) and structure equation model (SEM). Results - Through extensive and rigorous literature review process of related literature(Perceived evaluation fairness, Job satisfaction, Organizational commitment, Sales performance), research model and research hypothesis was set up. This study obtains the following research results. First, perceived evaluation fairness has a positive effect on job satisfaction, whereas the effects of perceived evaluation fairness on organizational commitment and sales performance did not show statistically significant result. Second, job satisfaction and organizational commitment have complete mediating roles to the relationship between perceived evaluation fairness and organizational commitment, and relationship between perceived evaluation fairness and sales performance. Conclusions - Based on the results, salespersons' perceived evaluation fairness is one of the key independent variable for making high job satisfaction, organizational commitment, and sales performance. Finally the theoretical, managerial implication and research limitations are mentioned in the discussion.

A Study on Developing the Performance Evaluation Indicators of Defense R&D Test Development Projects (국방연구개발 시험개발사업 성과평가지표 개발에 관한 연구)

  • Lee, Hyung-Jun;Kim, Woo-Je;Kim, Chan-Soo
    • IE interfaces
    • /
    • v.23 no.1
    • /
    • pp.78-88
    • /
    • 2010
  • In this paper we develop a model for the performance evaluation of defense R&D test development projects based on analytic hierarchy process. First, evaluation indicators are collected through the related literature survey and a delphi inquiry method. Second, stepwise multiple linear regression is used for developing a hierarchical structure for analytic hierarchy process in the evaluation model, which can make the selected evaluation indicators of the hierarchical structure independent. Also we verify the effectiveness of proposed indicators of the performance evaluation by comparing with the existing evaluation indicators. The developed indicators for the performance evaluation is more reasonable and practical than the previous indicators on defense R&D test development projects.

A Comparative Analysis of the Performance Evaluation System for Public Libraries (공공도서관 성과평가 체계에 대한 비교·분석)

  • Kim, Sun-Ae
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.31 no.4
    • /
    • pp.49-72
    • /
    • 2020
  • In a rapidly changing environment, public libraries need performance measures that can comprehensively represent their activities in order to respond to various changes, demonstrate social value, and justify input resources. However, most of the performance evaluations have been focused on specific areas or specific analysis methods. Therefore, this study looked at the efforts of advanced countries of overseas libraries to develop performance evaluation tools for public libraries in order to develop performance management tools for domestic public libraries. The implications were derived by reviewing and analyzing the direction, evaluation system, and major performance evaluation areas of public library performance evaluation. The main result was that the perspective of public library performance evaluation was shifting from input-output-oriented to outcome or impact, and the performance evaluation area was linked to the development strategy of public libraries or the role of the library. And, the government and institutions were working together to establish an evaluation system for performance management of public libraries.

An Impact Analysis of the National R&D Program Performance on Budgetary Decisions (국가연구개발사업 평가결과가 예산결정에 미치는 영향 분석)

  • Kang, Munsang;Kang, Sungbae
    • Journal of Korea Technology Innovation Society
    • /
    • v.18 no.4
    • /
    • pp.539-560
    • /
    • 2015
  • Korea has enacted the Performance Evaluation law on the R&D Programs since 2006. This study categorizes program size, program history, sustainability, self-evaluation result as antecedents, and analyze the relationship between the antecedents and Meta-evaluation result, the change rate of appropriations. The result shows that program size, program history, self-evaluation result have significant effect to the Meta-evaluation result. And Meta-evaluation result has significant effect to the change rate of appropriations. This study has implication that the performance evaluation system shows significant effect to the appropriations.

Study of the Method for Building up BSC in the Foodservice Industry Based on the Performance Evaluation (외식기업의 성과 평가에서의 BSC 도입 방법론 검토)

  • 오윤석
    • Culinary science and hospitality research
    • /
    • v.10 no.2
    • /
    • pp.84-106
    • /
    • 2004
  • Measuring and evaluating the business performance plays a very important role in managing business. It is both because business performance, in any types of industry, can be evaluated and managed properly only when the measurement of its performance is estimated and because its performance can be improved through an efficient and effective management. Therefore it is essential to build up the performance evaluation system to raise management efficiency of food service industry, to reinforce competitive power of food service industry. In this study, investigated the present performance evaluation system situation of the food service industry and introduced BSC as the main conceptional framework for evaluating the performance of the food service industry. Finally, this study discussed the possible method for building a balanced scorecard to the food service industry.

  • PDF

Impact of Sink Node Location in Sensor Networks: Performance Evaluation (센서 네트워크에서 싱크 노드 위치가 성능에 미치는 영향 분석)

  • Choi, Dongmin;Kim, Seongyeol;Chung, Ilyong
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.8
    • /
    • pp.977-987
    • /
    • 2014
  • Many of the recent performance evaluation of clustering schemes in wireless sensor networks considered one sink node operation and fixed sink node location without mentioning about any network application requirements. However, application environments have variable requirements about their networks. In addition, network performance is sufficiently influenced by different sink node location scenarios in multi-hop based network. We also know that sink location can influence to the sensor network performance evaluation because of changed multipath of sensor nodes and changed overload spots in multipath based wireless sensor network environment. Thus, the performance evaluation results are hard to trust because sensor network is easily changed their network connection through their routing algorithms. Therefore, we suggest that these schemes need to evaluate with different sink node location scenarios to show fair evaluation result. Under the results of that, network performance evaluation results are acknowledged by researchers. In this paper, we measured several clustering scheme's performance variations in accordance with various types of sink node location scenarios. As a result, in the case of the clustering scheme that did not consider various types of sink location scenarios, fair evaluation cannot be expected.

Performance Evaluation of Swing-Nose Crossing on Slab Track (콘크리트궤도용 고속분기기 성능평가)

  • Kim, Si-Chul;Kim, Man-Cheol;Hwang, Kwang-Ha;Bae, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.282-291
    • /
    • 2010
  • In line with current speed-up of railroad, a slab track has been increasingly adopted in a bid to secure the safety of track structure as well as to reduce the maintenance cost, and furthermore, the need for commercialization of domestically-developed swing-nose crossing turnout on slab track has been on the rise. For commercialization of swing-nose crossing turnout on slab which was developed in Korea, a technical and systematic performance evaluation system, considering local environment, shall be established and then the performance evaluation shall be accordingly implemented. This paper was intended to summarize the performance evaluation system, referring to the data available at home and abroad and the results of performance evaluation for domestically-developed swing-nose crossing turnout on slab track carried out to date based on that system. A performance evaluation system comprises the technical requirement appropriateness evaluation(component performance evaluation and design verification), laboratory test and on-site test. For domestically-developed swing-nose crossing turnout on slab track, appropriateness evaluation and laboratory test have been completed and the on-site test of those installed on the 2nd phase of Kyung-Bu HSR is underway now.

  • PDF