• Title/Summary/Keyword: Estimating Work Time

Search Result 120, Processing Time 0.027 seconds

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

Limits on the efficiency of event-based algorithms for Monte Carlo neutron transport

  • Romano, Paul K.;Siegel, Andrew R.
    • Nuclear Engineering and Technology
    • /
    • v.49 no.6
    • /
    • pp.1165-1171
    • /
    • 2017
  • The traditional form of parallelism in Monte Carlo particle transport simulations, wherein each individual particle history is considered a unit of work, does not lend itself well to data-level parallelism. Event-based algorithms, which were originally used for simulations on vector processors, may offer a path toward better utilizing data-level parallelism in modern computer architectures. In this study, a simple model is developed for estimating the efficiency of the event-based particle transport algorithm under two sets of assumptions. Data collected from simulations of four reactor problems using OpenMC was then used in conjunction with the models to calculate the speedup due to vectorization as a function of the size of the particle bank and the vector width. When each event type is assumed to have constant execution time, the achievable speedup is directly related to the particle bank size. We observed that the bank size generally needs to be at least 20 times greater than vector size to achieve vector efficiency greater than 90%. When the execution times for events are allowed to vary, the vector speedup is also limited by differences in the execution time for events being carried out in a single event-iteration.

The proposal for pesticide exposure estimation of Korean orchard farmer (과수 농작업자 농약노출량 산정법 제안)

  • Hong, Soon-Sung;Lee, Je-Bong;Park, Yeon-Ki;Shin, Jin-Sup;Im, Geon-Jae;Ryu, Gab-Hee
    • The Korean Journal of Pesticide Science
    • /
    • v.11 no.4
    • /
    • pp.281-288
    • /
    • 2007
  • This research was carried out to propose the Korean method for estimating the agricultural occupational pesticide exposure level in orchard. The UK-POEM (UK-Predictive Operator Exposure Model) was proposed as a bench-marking model and analysed its performance properties. To extrapolate the Korean agricultural conditions, application equipment, application method, work rate per day, application volume and spraying time of pesticide was surveyed for Korean 204 orchard farmhouse. This survey indicate that the major application equipments are speed sprayer(64.9%) and motor sprayer(33.9%). When they spayed the pesticide with a speed sprayer, they worked for more than 4 hours on area of 4 ha per day. In case of using motor sprayer, they worked for more than 4 hours on area of 1 ha. Based on the above survey result, Korean method for estimating the pesticide exposure level of agricultural worker was proposed finally.

Studies on Effective Fluid Monitoring Terminal design with the Use of location-based service (위치기반서비스를 활용한 효율적인 수액 모니터링 단말기 디자인에 관한 연구)

  • Lee, Hyo-Seung;Oh, Jae-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.4
    • /
    • pp.421-426
    • /
    • 2016
  • Fluid is normally used so that certain drug can be administered to patients for certain period of time. There are many incidents in which patients or guardians need to call upon medical staff after estimating the time of fluid injection termination. In case fluid injection is terminated during certain period such as sleeping time or others, it may cause more fatigue for either patients or guardians. Also, it may lead to ineffective work as medical staff needs to monitor the quantity of fluid several times in order to check the time of fluid injection termination. Therefore, the purpose of this study is to propose LBS system combined of minimum equipment and active RFID to monitor the level of fluid in order to solve abovementioned problems. Also, it is expected to enhance the quality of medical service with service in which real-time monitoring of fluid quantity and patient location is conducted to provide accurate information to either patients, guardians, or medical staff(nurse) so that medical staff can locate and see patients at the time of fluid injection termination.

Development of a Method to Reduce Damages by Pipe Failures (상수관 파괴에 의한 피해 경감기법의 개발)

  • Jun, Hwan-Don;Kim, Seok-Hyeon;Park, Moo-Jong;Kim, Joong-Hoon;Lee, Hwan-Goo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.31-36
    • /
    • 2008
  • A water distribution system should be constructed reasonably to supply water for the customer with proper quality and pressure as demands at nodes fluctuate with time. Also it should be reliable to minimize undesirable effects on the customer when various accidents happen such as pipe failures. A new method is presented here to reduce damages by pipe failures. For the work, two methods, namely, the method for estimating practical extent of damage by pipe failures and for estimating water distribution reliability, are adopted to analyze a water distribution system and to explore the damage reduction by pipe failures. As the results from the analysis of the model, the damage can be reduced effectively by increasing durability of each pipe in minimum cutsets according to the order of priority. The suggested method was applied to the Cherry-Hill network to verify its applicability.

A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.

A Production-Installation Simulation Model of Free-Form Concrete Panels

  • Lim, Jeeyoung;Lee, Donghoon;Na, Youngju;Lim, Chaeyeon;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.401-404
    • /
    • 2015
  • Demand on free-form buildings is gradually increasing, yet owing to the difficulty of production-installation work, several problems occur in the construction phase upon construction of a building, including the increased cost and construction duration, and reduced constructibility. To solve these problems, a techonology to produce FCP using a CNC(Computerized Numeric Control) machine is developed. The technology is that the information of designed free-form buildings to the CNC machine is transferred, and the transferred information is used for RTM(Rod-Type Mold, the mold shaped by back-up rods) and PCM(Phase Change Material) shaping, and the shaped RTM and PCM have the role of molds to produce FCP. Construction duration and project cost are limited in building sites, so the efficiency of processes like production-installation of FCP for application of the technology is significant. Since it is almost impossible to change the production-installation process at the construction phase when they are established, process should be deliberately decided. Therefore, the purpose of the study is to propose a production-installation simulation model of free-form concrete panels, in aspect of PCM. This paper is establishing the process for production-installation of FCP, estimating time required by each construction type and proposing a time simulation model that changes according to various constraints based on the analyses. With the time simulation model, it will be possible to build a cost model and to review the optimal construction duration and project cost.

  • PDF

Economical Analysis and Estimate Method of Possible Working Hours for Marine Rock Excavation Work Regarding the Tide Cycle (조석의 주기를 고려한 해상 암굴착 공사의 경제성 분석 및 작업가능시간 산정 방법에 관한 연구)

  • Kwon, Soon-Boum;Ock, Jong-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.142-151
    • /
    • 2007
  • The rock excavation work on the sea is planned as underwater process if the elevation of the rock is lower than the M.S.L.(Mean Sea Level). However, in case of West and South sea which are largely different between the rise and fall of the tide, the earth work can be performed on the ground while the work surface is exposed above the sea according to the tide cycle. Thus, it may a good substitute to make up for shortcomings of underwater construction works such as safety problems of workers, loss of efficiency and increasement of construction costs. But the difference between the height of the rock excavation surface and the water surface changed by the tide makes the exposure time of work surface, that is the possible working hours be changed. Also, it may cause the changes of construction cost. Thus, this study analyzes the economical efficiency of the construction method using the difference between the rise and fall of the tide in comparison with the construction method which is performed under the sea, and it also suggests the way to analyze the economical working hours by estimating the possible working hours on the ground. We also try to find out the application possibility of the way like the rock excavation work on the sea using the difference between rise and fall of the tide.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

Direction and Location Estimating Algorithm for Sound Sources with Two Hydrophones in Underwater Environment (두 개의 하이드로폰을 이용한 수중 음원 방향 추정 및 위치 추정 알고리즘)

  • Shin, JaeWook;Song, Ju-Man;Lee, SeokYoung;Choi, Hyun-Taek;Park, PooGyeon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.19 no.8
    • /
    • pp.676-681
    • /
    • 2013
  • For underwater vehicles, the use of sensors such as cameras and laser scanners is limited by the difference in environment compared to robots designed to work on dry land. In underwater environments, if use is made of sound signals, valuable information can be obtained. The most important application is the localization of underwater sound sources. The estimated location of a sound source can be used to control underwater robots or submarines. Thus, the purpose of this research is to estimate the source's direction and location in a noisy underwater environment. The direction of the sound source is obtained using two hydrophones. Furthermore, if we assume that the robot or sound source is moving, the location of the sound source is estimated using more than two estimated directions. The feasibility of the developed algorithm is examined by experiments in a water tank and in the ocean.