Browse > Article
http://dx.doi.org/10.6106/KJCEM.2016.17.1.056

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation  

Kim, Seong-Ah (Convergence Engineering for Future City, Sungkuynkwan University)
Park, Gweon (Building Business Unit, Daesung Industrial Co., Ltd.)
Song, Byeong-Seob (Building Business Unit, Daesung Industrial Co., Ltd.)
Choi, Chel-Ho (Doalltech)
Chin, Sang-Yoon (Department of Convergence Engineering for Future City, Sungkuynkwan University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.1, 2016 , pp. 56-65 More about this Journal
Abstract
Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation
Keywords
Building Information Modeling(BIM); Estimation; Work Productivity; Work Management;
Citations & Related Records
Times Cited By KSCI : 7  (Citation Analysis)
연도 인용수 순위
1 Aibinu, A. and Venkatesh, S. (2014). "Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia", Journal of Professional Issues in Engineering Education and Practice, 140(3), 04013021.   DOI
2 Burcin, B.G. and Samara, R. (2010). "The perceived value of building information modeling in the U.S building industries", Journal of Information Technology in Construction, 15, pp. 185-201.
3 Choi, C. H., Park, Y. J., Soh, J. Y., Kim, S. Y., and Lee, J. B. (2014). "Productivity Analysis for Structural Formwork Using 3D BIM", Journal of the Korea Institute of Building construction, 14(4), pp. 292-300.   DOI
4 Choi, J. S., and Kim, I. H. (2013). "Development of Schematic Estimation Module based on Open BIM for Building Frame of Super-tall Buildings", Conference of society of CAD/CAM Engineers, 8, pp. 419-420.
5 Estman C. M. et al. (2008). "BIM Handbook: A Guide to Building Information Modeling for Owners", Managers, Designers, Engineers and Contractors, John Wiley & Sons
6 Guo, F., Turkan, Y., T.Jahren, C. (2014). "Case Studies of BIM Practices within mechanical Contractors", Construction Research Congress, pp. 299-238.
7 Jeong, Y.S, Jang, S.J (2014). [Project Report] PARNAS Hotel Project, Review of Architecture and Building Science, 58(1), pp. 63-66.
8 Lee, H. S. (2014). "An Improvement of the Quantity Take-off Process for Reducing Errors During Detailed Design Development of Building Projects", Master's Thesis, Jong-Ang University.
9 Lee, J. G., et al. (2013). "A Framework Integrating Cost and Schedule based on BIM using IFC", Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 53-65.   DOI
10 Lee, J. S., Moon, S. G., Kim, J. H., and Kim, J. J. (2009). "An Analysis about Factors affecting Inactiveness of BIM(Building Information Modeling) Introduction in the Construction Project", Proceedings of KICEM annual Conference, 9, pp. 757-782.
11 Kim, H. J., Choi, J. S., Kim, H. S., and Kim I. H. (2013). "The Development of Data Model for Open BIMBased Schematic Estimates", Architectural Institute of Korea, 29(3), pp. 61-70.
12 Kim, S. A et al. (2008). "A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis", Proceedings of KICEM annual Conference, pp. 301-305.
13 Kim, J. Y. et al. (1999). Quantity take-off of construction for business, Bomoondang.
14 Kim, O. Y., Lee, B. N., and Kang, H. M. (2012). "Surve y on BIM usage condition of General Contract", CERIK, working paper 2012-02.
15 Kim, Sang-kuy (2014). Korea Economy and The Current Project Delivery System Status and Future Direction for Public Work Construction Market, The Federations of Construction Associations, A Invited Lecture of Breakfast Meeting, 14, Nov.
16 Kim, S. A et al. (2009). "A Development of Automated Modeling System for Apartment Interior to Improve Productivity of BIM-based Quantity Take-Off", Architectural Institute of Korea, 25(9), pp. 133-143.
17 Kim, S. A. Lee, C. H., Chin S. Y., and Choi C. H. (2011). "Critical factors for Assessment of BIM based Quantity take-off", International Conference on Construction Engineering and Project Management, 4. pp. 15-20
18 Kwon, O. B., Son, J. H., Lee, S. H. (2010). "Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency", Journal of the Korea Institute of Building construction, 10(6), pp. 49-60.   DOI
19 Kwon, O. C., Jo, C. W., and Cho, J. W. (2011). "Introduction of BIM Quality Standard for Quantity Take-off", Journal of the Korea Institute of Building construction, 11(2), pp. 171-180.   DOI
20 Oh E. J. (2000). "Study on the Application and a Plan to Improvement of Estimated in Construction", Master's Thesis, Dong-a University.
21 Son J. W., Yoon, J. S., and Beak, J. H. (2003). "A Study on Construction Productivity Measurement Method", Journal of Architectural Institute of Korea, 19(10), pp. 101-109.
22 Park Y. J., Won S. K, Han, C. H, and Lee, J. B. (2011). "A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects", Journal of the Architectural Institute of Korea Structure & Construction, 27(6), pp. 123-130.
23 SmartMarket Report-The business Value of BIM in South Korea (2012). McgrawHill Construction.
24 SmartMarket Report-The business Value of BIM for Construction in Major Global Market (2014). McgrawHill Construction.
25 Yoo, M. K. (2008). "A study on improving estimating practices of building projects using BIM", Masters Thesis, Jong-Ang University.
26 Zhao, P and Wang, C. (2014). "A Comparison of Using Traditional Cost Estimating Software and BIM for Construction Cost Control", ICCREM 2014, pp. 256-264.