The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.70-78
/
2011
In case of long time progressive construction work, we need contract sum adjustment due to escalation for a period of works and the process of applying, consistent and obvious criterion is required. In this study, it were attempted to figure out problem and study this rational improvement by giving examples based on core activities of escalation adjustment. Based on literature study and legal system analysis, we classified processes of contract sum adjustment for escalation and defined 20 core activities for each process. From this measured variable, we carried out case study by giving 37 examples of escalation. As a result of case study, problems of each process was found and we suggested rational improvement. As this study, providers will be able to waste budget and the other will be given smooth escalation adjustment.
Proceedings of the Korean Institute of Building Construction Conference
/
2005.11a
/
pp.117-120
/
2005
The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.203-211
/
2004
This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.
Journal of the Korea Institute of Building Construction
/
v.12
no.1
/
pp.108-114
/
2012
Escalation method examining the changes in price index has been widely utilized in public construction projects. The previous escalation method determined estimated changes in price based on the average unit price of contract items over a period of time. In relation to this method, the issue has been raised that the fluctuation rates of previous method show different trends compared with other related price indices, as the influence of the small group of contract items with large unit prices overwhelms the others. This research suggested an improved escalation method which estimates the fluctuation rate by examining the changes in CCI (construction cost index) and applies it to the total amount or the partial amount deducted for labor cost in price escalation for previous bid price method. To verify the improvement, a case study is conducted on an educational facility, and the fluctuation rate was estimated in two different base periods (short term, long term). The results over the long term showed similar tendencies to those of related price indices, as well as significant differences in fluctuation rates compared to those of the previous method.
The purpose of price escalation clauses has the effect of increasing the L/C value subject to external pricing mechanisms. This will be found inter alia in metals and oil products transactions. Such a clause gives rise to a question. That is, whether it is enforceable or whether it constitutes a letter of credit. The problem is what to reference to a source outside the context of a letter of credit constitutes a non-documentary condition rendering the undertaking something other than a letter of credit. Reference to an objective and readily available index is not something that renders the undertaking obscure and is not "non-documentary in the sense that it is possible to make an objective verification of the data. The possible solution is that not every non-documentary condition will be disregarded. For example, an index specified in the credit will not be disregarded as stipulated in ISP98 and URDG758. If a non-documentary is "central and fundamental", it seems that the parties intended a dependent payment obligations. The most common means of overcoming this conflicts of interests is to issue an instrument incorporatingan escalation clause, but capping the bank's maximum payment obligation.
Korean Journal of Construction Engineering and Management
/
v.20
no.3
/
pp.3-11
/
2019
The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.
Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.3-11
/
2011
There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.
Recently, a large amount of flammable or explosive materials have been handled or stored in chemical industries. H the equipments fail or the materials release in consequence of operation errors, fire and explosion could occur to them. Thus, risk assessment using quantification of risks is very important when design of processes and modifications of installed processes are performed. The purpose of this study is to develop the program for fire and explosion index in order to quantify the expected damage of fire and explosion incidents in chemical plants, to identify equipment that would be likely to contribute to the creation or escalation of an incident, to comunicate the potential fire and explosion risk to management and to account of damage cost.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.256-260
/
2004
As a large portion of defence budget are alloted for military facility construction, reasonable budget estimation in the planning stage has been officers' main concerns. However the proper estimation of construction cost is difficult to be carried out due to the absence of systematic criteria. To improve the budget estimation for military facility construction, this study proposes a cost index model which can convert historical cost to current cost. Thus the developed cost index would enhance effectiveness of budget estimation process 3nd support reasonable decision making. This cost index model is developed by analyzing historical cost data with statistical methodology The study is executed by following process. First, factors which affect construction cost for the most are selected by analyzing historical cost data. second, the selected factors are categorized material cost, labor cost and equipment cost, and weights of those factors are calculated by dividing the cost of each factor by total item costs. Last, cost index is developed by using weighted average method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.